Technical Papers
Jan 28, 2020

Value Generation in Front-End Design of Social Housing with QFD and Multiattribute Utility Theory

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 4

Abstract

The design of social housing is a multifaceted endeavor, as are many social projects, such as megaprojects whose expected benefits reach beyond a handful of stakeholders. Understanding the requirements of such projects can be a painstaking endeavor, and without a structured process to guide decision making, such projects often fail to deliver on their intended benefits. This paper examined how the use of utility theory (UT) and quality function deployment (QFD) can serve as a useful basis to support the delivery of such benefits. The research examined a social housing project in Brazil to focus on contextual influences on understanding, structuring, and delivery of benefits. The approach adopted QFD for requirements management, whereas utility theory assessed utility decision making in ranking the housing models on the basis established user requirements and derived design requirements (DRs). A medium-low-income model is preferred; the next preferred models are very low, medium low, and medium high, in that order. The analysis indicated no transitivity in preference from an end-user perspective. The novelty of the paper is in representing quantitatively a process of requirements management that supports the delivery of project benefits on a utilitarian basis in social housing design. The method is able to account for interdependencies between design and user attributes in supporting social housing design decision making in an integrated process. This understanding can be key to the delivery of the correct social projects that reflect context-specific end-user needs.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data generated or analyzed during the study are included in the published paper. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

References

Abrishami, S., J. Goulding, F. Pour Rahimian, and A. Ganah. 2015. “Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities.” Constr. Innovation 15 (1): 24–41. https://doi.org/10.1108/CI-07-2014-0036.
Adeleke, A. Q., A. Y. Bahaudin, A. M. Kamaruddeen, J. A. Bamgbade, M. G. Salimon, M. W. A. Khan, and S. Sorooshian. 2018. “The influence of organizational external factors on construction risk management among Nigerian construction companies.” Saf. Health Work 9 (1): 115–124. https://doi.org/10.1016/j.shaw.2017.05.004.
Akbaş, H., and B. Bilgen. 2017. “An integrated fuzzy QFD and TOPSIS methodology for choosing the ideal gas fuel at WWTPs.” Energy 125 (Apr): 484–497. https://doi.org/10.1016/j.energy.2017.02.153.
Akkaya, G., B. Turanoğlu, and S. Öztaş. 2015. “An integrated fuzzy AHP and fuzzy MOORA approach to the problem of industrial engineering sector choosing.” Expert Syst. Appl. 42 (24): 9565–9573. https://doi.org/10.1016/j.eswa.2015.07.061.
Almqvist, F. 2017. “The fuzzy front-end and the forgotten back-end: User involvement in later development phases.” Supplement, Des. J. 20 (S1): S2524–S2533. https://doi.org/10.1080/14606925.2017.1352765.
Arabsheybani, A., M. M. Paydar, and A. S. Safaei. 2018. “An integrated fuzzy MOORA method and FMEA technique for sustainable supplier selection considering quantity discounts and supplier’s risk.” J. Cleaner Prod. 190 (Jul): 577–591. https://doi.org/10.1016/j.jclepro.2018.04.167.
Arroyo, P., C. Mourgues, F. Flager, and M. G. Correa. 2018. “A new method for applying choosing by advantages (CBA) multicriteria decision to a large number of design alternatives.” Energy Build. 167 (May): 30–37. https://doi.org/10.1016/j.enbuild.2018.02.031.
Arroyo, P., I. Tommelein, and G. Ballard. 2014. “Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design.” J. Constr. Eng. Manage. 141 (1): 04014063. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000915.
Ashley, D. B., K. Uehara, and E. Robinson Burke. 1983. “Critical decision making during construction.” J. Constr. Eng. Manage. 109 (2): 146–162. https://doi.org/10.1061/(ASCE)0733-9364(1983)109:2(146).
Austin, S., J. Steele, S. Macmillan, P. Kirby, and R. Spence. 2001. “Mapping the conceptual design activity of interdisciplinary teams.” Des. Stud. 22 (3): 211–232. https://doi.org/10.1016/S0142-694X(00)00026-0.
Babbar, C., and S. H. Amin. 2018. “A multi-objective mathematical model integrating environmental concerns for supplier selection and order allocation based on fuzzy QFD in beverages industry.” Expert Syst. Appl. 92 (Feb): 27–38. https://doi.org/10.1016/j.eswa.2017.09.041.
Baccarini, D. 1996. “The concept of project complexity—A review.” Int. J. Project Manage. 14 (4): 201–204. https://doi.org/10.1016/0263-7863(95)00093-3.
Bakhshi, J., V. Ireland, and A. Gorod. 2016. “Clarifying the project complexity construct: Past, present and future.” Int. J. Project Manage. 34 (7): 1199–1213. https://doi.org/10.1016/j.ijproman.2016.06.002.
Ballard, G., and L. Koskela. 2013. “Rhetoric and design.” In Proc., 19th Int. Conf. on Engineering Design ICED. Glasgow, UK: Design Society.
Battikha, M. G. 2002. “QUALICON: Computer-based system for construction quality management.” J. Constr. Eng. Manage. 128 (2): 164–173. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(164).
Becker, T. C., E. J. Jaselskis, and M. El-Gafy. 2014. “Improving predictability of construction project outcomes through intentional management of indirect construction costs.” J. Constr. Eng. Manage. 140 (6): 04014014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000845.
Bertelsen, S., and L. Koskela. 2002. “Managing the three aspects of production in construction.” In Proc., 10th Annual Conf. of the International Group for Lean Construction. Gramado, Brazil: International Group for Lean Construction.
Bølviken, T., and L. Koskela. 2016. “Why hasn’t waste reduction conquered construction?” In Proc., 24th Annual Conf. of the Int. Group for Lean Construction. Boston: International Group for Lean Construction.
Bradley, G. 2016. Benefit realisation management: A practical guide to achieving benefits through change. Abingdon, UK: Routledge.
Buttigieg, S. C., P. K. Dey, and M. R. Cassar. 2016. “Combined quality function deployment and logical framework analysis to improve quality of emergency care in Malta.” Int. J. Health Care Qual. Assur. 29 (2): 123–140. https://doi.org/10.1108/IJHCQA-04-2014-0040.
Cardoso, C., P. Badke-Schaub, and O. Eris. 2016. “Inflection moments in design discourse: How questions drive problem framing during idea generation.” Des. Stud. 46 (Sep): 59–78. https://doi.org/10.1016/j.destud.2016.07.002.
Chakraborty, S. 2011. “Applications of the MOORA method for decision making in manufacturing environment.” Int. J. Adv. Manuf. Technol. 54 (9–12): 1155–1166. https://doi.org/10.1007/s00170-010-2972-0.
Chapman, R. J. 2016. “A framework for examining the dimensions and characteristics of complexity inherent within rail megaprojects.” Int. J. Project Manage. 34 (6): 937–956. https://doi.org/10.1016/j.ijproman.2016.05.001.
Chen, X. B., and T. W. Kim. 2017. “Automated mapping of user activities onto flexible space in space-use analysis.” J. Constr. Eng. Manage. 143 (8): 04017034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001328.
Cheng, E. W., H. Li, and L. Yu. 2005. “The analytic network process (ANP) approach to location selection: A shopping mall illustration.” J. Constr. Innovation 5 (2): 83–97. https://doi.org/10.1108/14714170510815195.
Choo, H. J., J. Hammond, I. D. Tommelein, S. Austin, and G. Ballard. 2004. “DePlan: A tool for integrated design management.” Autom. Constr. 13 (3): 313–326. https://doi.org/10.1016/j.autcon.2003.09.012.
Dağdeviren, M., and İ. Yüksel. 2010. “A fuzzy analytic network process (ANP) model for measurement of the sectoral competititon level (SCL)” Expert Syst. Appl. 37 (2): 1005–1014. https://doi.org/10.1016/j.eswa.2009.05.074.
De los Rios, I. C., and F. J. Charnley. 2017. “Skills and capabilities for a sustainable and circular economy: The changing role of design.” J. Cleaner Prod. 160 (Sep): 109–122. https://doi.org/10.1016/j.jclepro.2016.10.130.
Dong, C., C. Zhang, and B. Wang. 2003. “Integration of green quality function deployment and fuzzy multi-attribute utility theory-based cost estimation for environmentally conscious product development.” Int. J. Environmentally Conscious Des. Manuf. 11 (1): 12–28.
Dozzi, S., S. Abourizk, and S. Schroeder. 1996. “Utility-theory model for bid markup decisions.” J. Constr. Eng. Manage. 122 (2): 119–124. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:2(119).
Eagan, J. 1998. Rethinking construction—The report of the Construction Task Force to the Deputy Prime Minister, John Prescot, on the scope for improving the quality and efficiency of the UK construction. London: Dept. of the Environment, Transport the Regions.
Eldin, N., and V. Hikle. 2003. “Pilot study of quality function deployment in construction projects.” J. Constr. Eng. Manage. 129 (3): 314–329. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(314).
Elmisalami, T., R. Walters, and J. Jaselskis Edward. 2006. “Construction IT decision making using multiattribute utility theory for use in a laboratory information management system.” J. Constr. Eng. Manage. 132 (12): 1275–1283. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:12(1275).
Elzomor, M., R. Burke, K. Parrish, and G. E. Gibson, Jr. 2018. “Front-end planning for large and small infrastructure projects: Comparison of project definition rating index tools.” J. Manage. Eng. 34 (4): 04018022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000611.
Esteves, J. 2009. “A benefits realisation road-map framework for ERP usage in small and medium-sized enterprises.” J. Enterp. Inf. Manage. 22 (1/2): 25–35. https://doi.org/10.1108/17410390910922804.
Floricel, S., J. L. Michela, and S. Piperca. 2016. “Complexity, uncertainty-reduction strategies, and project performance.” Int. J. Project Manage. 34 (7): 1360–1383. https://doi.org/10.1016/j.ijproman.2015.11.007.
Fuentes, M., and H. Smyth. 2016. “Value co-creation at the front-end of project management: A service-dominant logic perspective.” In Proc., 32nd Annual ARCOM Conf., edited by P. Chan and C. Neilson. Manchester, UK: Association of Researchers in Construction Management.
Georgy, M. E., L.-M. Chang, and L. Zhang. 2005. “Utility-function model for engineering performance assessment.” J. Constr. Eng. Manage. 131 (5): 558–568. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(558).
Gibson, J. G. E., T. Irons Kyle, and P. Ray Michael. 2006. “Front end planning for buildings.” In Proc., Architectural Engineering Conf., 1–14. Reston, VA: ASCE.
Giezen, M. 2012. “Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning.” Int. J. Project Manage. 30 (7): 781–790. https://doi.org/10.1016/j.ijproman.2012.01.010.
Guetterman, T. C., and M. D. Fetters. 2018. “Two methodological approaches to the integration of mixed methods and case study designs: A systematic review.” Am. Behav. Sci. 62 (7): 900–918. https://doi.org/10.1177/0002764218772641.
He, Q., L. Luo, Y. Hu, and A. P. Chan. 2015. “Measuring the complexity of mega construction projects in China—A fuzzy analytic network process analysis.” Int. J. Project Manage. 33 (3): 549–563. https://doi.org/10.1016/j.ijproman.2014.07.009.
Hentschke, C. D. S., L. G. Amorim, C. C. Schvarstzhaupt, M. E. Echeveste, and C. T. Formoso. 2018. “An assessment method for customisable attributes in social housing projects.” In Proc., ZEMCH 2018 Int. Conf., 1–13. Melbourne, Australia: Zero Energy Mass Custom Home Network.
Hoyle, C. J., and W. Chen. 2009. “Product attribute function deployment (PAFD) for decision-based conceptual design.” IEEE Trans. Eng. Manage. 56 (2): 271–284. https://doi.org/10.1109/TEM.2008.927787.
Hsu, J. S., T. P. Liang, S. P. J. Wu, G. Klein, and J. J. Jiang. 2011. “Promoting the integration of users and developers to achieve a collective mind through the screening of information system projects.” Int. J. Project Manage. 29 (5): 514–524. https://doi.org/10.1016/j.ijproman.2010.06.006.
Hsu, J. S.-C., T.-C. Lin, G.-T. Zheng, and Y.-W. Hung. 2012. “Users as knowledge co-producers in the information system development project.” Int. J. Project Manage. 30 (1): 27–36. https://doi.org/10.1016/j.ijproman.2011.05.008.
Hwang, B.-G., and W. Ho Jia. 2012. “Front-end planning implementation in Singapore: Status, importance, and impact.” J. Constr. Eng. Manage. 138 (4): 567–573. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000456.
Ignatius, J., A. Rahman, M. Yazdani, J. Šaparauskas, and S. H. Haron. 2016. “An integrated fuzzy ANP–QFD approach for green building assessment.” J. Civ. Eng. Manage. 22 (4): 551–563. https://doi.org/10.3846/13923730.2015.1120772.
Kagioglou, M., and P. Tzortzopoulos. 2010. “Benefits realisation (BeReal) model.” In Improving healthcare through built environment infrastructure, edited by M. Kagioglou and P. Tzortzopoulos. Malden, MA: Wiley.
Karakhan, A. A., S. Rajendran, J. Gambatese, and C. Nnaji. 2018. “Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach.” J. Constr. Eng. Manage. 144 (7): 04018054. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001503.
Karni, E., and D. Schmeidler. 2016. “An expected utility theory for state-dependent preferences.” Theory Decis. 81 (4): 467–478. https://doi.org/10.1007/s11238-016-9545-0.
Karni, E., and M.-L. Vierø. 2017. “Awareness of unawareness: A theory of decision making in the face of ignorance.” J. Econ. Theory 168 (Mar): 301–328. https://doi.org/10.1016/j.jet.2016.12.011.
Karsak, E. E. 2004. “Fuzzy multiple objective programming framework to prioritize design requirements in quality function deployment.” Comput. Ind. Eng. 47 (2–3): 149–163. https://doi.org/10.1016/j.cie.2004.06.001.
Karsak, E. E., S. Sozer, and S. E. Alptekin. 2003. “Product planning in quality function deployment using a combined analytic network process and goal programming approach.” Comput. Ind. Eng. 44 (1): 171–190. https://doi.org/10.1016/S0360-8352(02)00191-2.
Kassela, K., M. Papalexi, and D. Bamford. 2017. “Applying quality function deployment to social housing?” TQM J. 29 (3): 422–437. https://doi.org/10.1108/TQM-03-2016-0030.
Keeney, R. L., and H. Raiffa. 1976. Decisions with multiple objectives: Preferences and value trade-offs. Cambridge, UK: Cambridge University Press.
Koskela, L. 1992. Application of the new production philosophy to construction. Stanford, CA: Stanford Univ.
Koskela, L. 2000. An exploration towards a production theory and its application to construction. Espoo, Finland: VTT Technical Research Centre of Finland.
Koskela, L. 2004. “Making-do—The eighth category of waste.” In Proc., 12th Annual Conf. of the International Group for Lean Construction. Salford, UK: Univ. of Salford.
Kpamma, Z. E., T. Adjei-Kumi, J. Ayarkwa, and E. Adinyira. 2017. “Participatory design, wicked problems, choosing by advantages.” J. Eng. Constr. Archit. Manage. 24 (2): 289–307. https://doi.org/10.1108/ECAM-06-2015-0085.
Kwong, C., Y. Ye, Y. Chen, and K. Choy. 2011. “A novel fuzzy group decision-making approach to prioritising engineering characteristics in QFD under uncertainties.” Int. J. Prod. Res. 49 (19): 5801–5820. https://doi.org/10.1080/00207543.2010.520043.
Laurent, J., and R. M. Leicht. 2019. “Practices for designing cross-functional teams for integrated project delivery.” J. Constr. Eng. Manage. 145 (3): 05019001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001605.
Lawson, B. 2005. How designers think: The design process demystified. London: Architectural Press.
Lehtinen, J., A. Peltokorpi, and K. Artto. 2019. “Megaprojects as organizational platforms and technology platforms for value creation.” Int. J. Project Manage. 37 (1): 43–58. https://doi.org/10.1016/j.ijproman.2018.10.001.
Lennon, E., J. Farr, and R. Besser. 2013. “Evaluation of multi-attribute decision making systems applied during the concept design of new microplasma devices.” Expert Syst. Appl. 40 (16): 6321–6329. https://doi.org/10.1016/j.eswa.2013.05.049.
Lima-Junior, F. R., and L. C. R. Carpinetti. 2016. “A multicriteria approach based on fuzzy QFD for choosing criteria for supplier selection.” Comput. Ind. Eng. 101 (Nov): 269–285. https://doi.org/10.1016/j.cie.2016.09.014.
Lindhard, S. M., F. Hamzeh, V. A. Gonzalez, S. Wandahl, and L. F. Ussing. 2019. “Impact of activity sequencing on reducing variability.” J. Constr. Eng. Manage. 145 (3): 04019001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001618.
Linfeng, D., G. Qiang, and W. Lin. 2011. “An IDEF0 design For PDM-based die integrated intelligent design system functional model.” Syst. Eng. Procedia 1: 372–376. https://doi.org/10.1016/j.sepro.2011.08.056.
Liou, J. J., J. Tamošaitienė, E. K. Zavadskas, and G.-H. Tzeng. 2016. “New hybrid COPRAS-G MADM Model for improving and selecting suppliers in green supply chain management.” Int. J. Prod. Res. 54 (1): 114–134. https://doi.org/10.1080/00207543.2015.1010747.
Liu, H.-T. 2011. “Product design and selection using fuzzy QFD and fuzzy MCDM approaches.” Appl. Math. Modell. 35 (1): 482–496. https://doi.org/10.1016/j.apm.2010.07.014.
Locatelli, G., M. Mancini, and E. Romano. 2014. “Systems engineering to improve the governance in complex project environments.” Int. J. Project Manage. 32 (8): 1395–1410. https://doi.org/10.1016/j.ijproman.2013.10.007.
Locatelli, G., G. Mariani, T. Sainati, and M. Greco. 2017. “Corruption in public projects and megaprojects: There is an elephant in the room!” Int. J. Project Manage. 35 (3): 252–268. https://doi.org/10.1016/j.ijproman.2016.09.010.
Love, P. E. D., X. Wang, C.-P. Sing, and R. L. K. Tiong. 2013. “Determining the probability of project cost overruns.” J. Constr. Eng. Manage. 139 (3): 321–330. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000575.
Lu, Y., L. Luo, H. Wang, Y. Le, and Q. Shi. 2015. “Measurement model of project complexity for large-scale projects from task and organization perspective.” Int. J. Project Manage. 33 (3): 610–622. https://doi.org/10.1016/j.ijproman.2014.12.005.
Luo, L., Q. He, E. J. Jaselskis, and J. Xie. 2017. “Construction project complexity: Research trends and implications.” J. Constr. Eng. Manage. 143 (7): 04017019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001306.
Malak, R. J., Jr., J. M. Aughenbaugh, and C. J. Paredis. 2009. “Multi-attribute utility analysis in set-based conceptual design.” Comput.-Aided Des. 41 (3): 214–227. https://doi.org/10.1016/j.cad.2008.06.004.
Mallon, J. C., and D. E. Mulligan. 1993. “Quality function deployment: A system for meeting customers’ needs.” J. Constr. Eng. Manage. 119 (3): 516–531. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:3(516).
Mondal, S., A. K. Singh, P. Chatterjee, and S. Chakraborty. 2017. “Decision making for rapid prototyping process selection using complex proportional assessment method.” In Proc., Int. Conf. on Manufacturing Excellence (ICMAX-2017). Nashik, India: K. K. Wagh Institute of Engineering Education and Research.
Oh, E. H., N. Naderpajouh, M. Hastak, and S. Gokhale. 2016. “Integration of the construction knowledge and expertise in front-end planning.” J. Constr. Eng. Manage. 142 (2): 04015067. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001050.
Patel, J. D., and K. D. Maniya. 2015. “Application of AHP/MOORA method to select wire cut electrical discharge machining process parameter to cut EN31 alloys steel with brasswire.” Mater. Today: Proc. 2 (4–5): 2496–2503. https://doi.org/10.1016/j.matpr.2015.07.193.
Pergher, I., and A. T. de Almeida. 2018. “A multi-attribute, rank-dependent utility model for selecting dispatching rules.” J. Manuf. Syst. 46 (Jan): 264–271. https://doi.org/10.1016/j.jmsy.2018.01.007.
Pich, M. T., C. H. Loch, and A. D. Meyer. 2002. “On uncertainty, ambiguity, and complexity in project management.” Manage. Sci. 48 (8): 1008–1023. https://doi.org/10.1287/mnsc.48.8.1008.163.
Ranjan, R., P. Chatterjee, and S. Chakraborty. 2015. “Evaluating performance of engineering departments in an Indian University using DEMATEL and compromise ranking methods.” Opsearch 52 (2): 307–328. https://doi.org/10.1007/s12597-014-0186-1.
Rooke, J. A., S. Sapountzis, L. Koskela, R. Codinhoto, and M. Kagioglou. 2010. “Lean knowledge management: The problem of value.” In Proc., 18th Annual Conf. of the Int. Group for Lean Construction (IGLC 18). Haifa, Isreal: International Group for Lean Construction.
Ross, A. M., D. E. Hastings, J. M. Warmkessel, and N. P. Diller. 2004. “Multi-attribute tradespace exploration as front end for effective space system design.” J. Spacecraft Rockets 41 (1): 20–28. https://doi.org/10.2514/1.9204.
Saaty, T. L. 2001. Decision making with dependence and feedback: The analytic network process. Pittsburgh: RWS Publications.
Saaty, T. L. 2004. “Decision making—The analytic hierarchy and network processes (AHP/ANP).” J. Syst. Sci. Syst. Eng. 13: 1–35.
Saaty, T. L. 2005. “Making and validating complex decisions with the AHP/ANP.” J. Syst. Sci. Syst. Eng. 14 (1): 1–36. https://doi.org/10.1007/s11518-006-0179-6.
Sahu, A. K., S. S. Mahapatra, S. Chatterjee, and J. Thomas. 2018. “Optimization of surface roughness by MOORA method in EDM by electrode prepared via selective laser sintering process.” Mater. Today: Proc. 5 (9): 19019–19026. https://doi.org/10.1016/j.matpr.2018.06.253.
Samset, K., and G. H. Volden. 2016. “Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance.” Int. J. Project Manage. 34 (2): 297–313. https://doi.org/10.1016/j.ijproman.2015.01.014.
San Cristóbal, J. R. 2012. “Contractor selection using multicriteria decision-making methods.” J. Constr. Eng. Manage. 138 (6): 751–758. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000488.
San Cristóbal, J. R. 2017. “Complexity in project management.” Procedia Comput. Sci. 121: 762–766. https://doi.org/10.1016/j.procs.2017.11.098.
Sapountzis, S., K. Harris, and M. Kagioglou. 2008. Benefits management and benefits realization—A literature review. Salford, UK: HaCIRIC, Univ. of Salford.
Scherer, J. O., A. P. Kloeckner, J. L. D. Ribeiro, G. Pezzotta, and F. Pirola. 2016. “Product-service system (PSS) design: Using design thinking and business analytics to improve PSS design.” Procedia CIRP 47: 341–346. https://doi.org/10.1016/j.procir.2016.03.062.
Schultz, W., W. R. Stauffer, and A. Lak. 2017. “The phasic dopamine signal maturing: From reward via behavioural activation to formal economic utility.” Curr. Opin. Neurobiol. 43 (Apr): 139–148. https://doi.org/10.1016/j.conb.2017.03.013.
Senturk, S., Y. Binici, and N. Erginel. 2016. “The theoretical structure of fuzzy analytic network process (FANP) with interval type-2 fuzzy sets.” IFAC-PapersOnLine 49 (12): 1318–1322. https://doi.org/10.1016/j.ifacol.2016.07.706.
Seo, S., T. Aramaki, Y. Hwang, and K. Hanaki. 2004. “Fuzzy decision-making tool for environmental sustainable buildings.” J. Constr. Eng. Manage. 130 (3): 415–423. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(415).
Serra, C. E. M., and M. Kunc. 2015. “Benefits realisation management and its influence on project success and on the execution of business strategies.” Int. J. Project Manage. 33 (1): 53–66. https://doi.org/10.1016/j.ijproman.2014.03.011.
Sinclair, D. 2013. RIBA plan of work 2013 overview. London: Royal Institute of British Architects.
Smyth, H., L. Lecoeuvre, and P. Vaesken. 2018. “Co-creation of value and the project context: Towards application on the case of Hinkley Point C Nuclear Power Station.” Int. J. Project Manage. 36 (1): 170–183. https://doi.org/10.1016/j.ijproman.2017.04.013.
Swarup, L., S. Korkmaz, and D. Riley. 2011. “Project delivery metrics for sustainable, high-performance buildings.” J. Constr. Eng. Manage. 137 (12): 1043–1051. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000379.
Tezel, A., L. Koskela, and Z. Aziz. 2018. “Current condition and future directions for lean construction in highways projects: A small and medium-sized enterprises (SMEs) perspective.” Int. J. Project Manage. 36 (12): 267–286. https://doi.org/10.1016/j.ijproman.2017.10.004.
Thomson, D. S., S. Austin, D. S. Root, A. Thorpe, and J. W. Hammond. 2006. “A problem-solving approach to value-adding decision making in construction design.” Eng. Constr. Archit. Manage. 13 (1): 43–61. https://doi.org/10.1108/09699980610646494.
Thyssen, M. H., S. Emmitt, S. Bonke, and A. Kirk-Christoffersen. 2010. “Facilitating client value creation in the conceptual design phase of construction projects: A workshop approach.” Archit. Eng. Des. Manage. 6 (1): 18–30. https://doi.org/10.3763/aedm.2008.0095.
Trivedi, A., and A. Singh. 2017. “A hybrid multi-objective decision model for emergency shelter location-relocation projects using fuzzy analytic hierarchy process and goal programming approach.” Int. J. Project Manage. 35 (5): 827–840. https://doi.org/10.1016/j.ijproman.2016.12.004.
Turner, J. R., and R. A. Cochrane. 1993. “Goals-and-methods matrix: Coping with projects with ill defined goals and/or methods of achieving them.” Int. J. Project Manage. 11 (2): 93–102. https://doi.org/10.1016/0263-7863(93)90017-H.
Vinodh, S., and S. K. Chintha. 2011. “Application of fuzzy QFD for enabling agility in a manufacturing organization: A case study.” TQM J. 23 (3): 343–357. https://doi.org/10.1108/17542731111124389.
von Neumann, J., and O. Morgenstern. 1953. Theory of games and economic behavior. 3rd ed. Princeton, NJ: Princeton University Press.
Williams, T. M. 1999. “The need for new paradigms for complex projects.” Int. J. Project Manage. 17 (5): 269–273. https://doi.org/10.1016/S0263-7863(98)00047-7.
Won, J., J. C. Cheng, and G. Lee. 2016. “Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea.” Waste Manage. (Oxford) 49 (Mar): 170–180. https://doi.org/10.1016/j.wasman.2015.12.026.
Yan, H.-B., and T. Ma. 2015. “A group decision-making approach to uncertain quality function deployment based on fuzzy preference relation and fuzzy majority.” Eur. J. Oper. Res. 241 (3): 815–829. https://doi.org/10.1016/j.ejor.2014.09.017.
Yates, J. 1993. “Construction decision support system for delay analysis.” J. Constr. Eng. Manage. 119 (2): 226–244. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(226).
Yazdani, M., P. Chatterjee, E. K. Zavadskas, and S. H. Zolfani. 2017. “Integrated QFD-MCDM framework for green supplier selection.” J. Cleaner Prod. 142 (Jan): 3728–3740. https://doi.org/10.1016/j.jclepro.2016.10.095.
Zaim, S., M. Sevkli, H. Camgöz-Akdağ, O. F. Demirel, A. Y. Yayla, and D. Delen. 2014. “Use of ANP weighted crisp and fuzzy QFD for product development.” J Expert Syst. Appl. 41 (9): 4464–4474. https://doi.org/10.1016/j.eswa.2014.01.008.
Zare Mehrjerdi, Y. 2011. “Quality function deployment and its profitability engagement: A systems thinking perspective.” Int. J. Qual. Reliab. Manage. 28 (9): 910–928. https://doi.org/10.1108/02656711111172513.
Zhang, Z., and X. Chu. 2009. “Fuzzy group decision-making for multi-format and multi-granularity linguistic judgments in quality function deployment.” Expert Syst. Appl. 36 (5): 9150–9158. https://doi.org/10.1016/j.eswa.2008.12.027.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 4April 2020

History

Received: May 7, 2019
Accepted: Aug 22, 2019
Published online: Jan 28, 2020
Published in print: Apr 1, 2020
Discussion open until: Jun 28, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Joas Serugga [email protected]
Ph.D. Research, School of Art Design and Architecture, Univ. of Huddersfield, Huddersfield HD1 3DH, UK (corresponding author). Email: [email protected]
Mike Kagioglou [email protected]
Professor, School of Art Design and Architecture, Univ. of Huddersfield, Huddersfield HD1 3DH, UK. Email: [email protected]
Professor, School of Art Design and Architecture, Univ. of Huddersfield, Huddersfield HD1 3DH, UK. ORCID: https://orcid.org/0000-0002-8740-6753. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share