Technical Papers
Jan 10, 2020

Neural Networks Model for Prediction of Construction Material Prices in Egypt Using Macroeconomic Indicators

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 3

Abstract

Adequate cost estimation at the planning phase is an integral part of a construction project’s success. Many uncertainties disturb the planners’ initial estimations and lead to cost overruns. Although many researchers highlighted the correlation between economic conditions and construction costs, accurate quantification of the impact of this correlation has not yet been reached. This paper proposes three models that utilize artificial neural networks (ANNs) to predict the future prices of major construction materials, namely steel reinforcement bars and portland cement, in the context of the Egyptian construction industry 6 months ahead. A Microsoft Excel spreadsheet that also utilizes genetic algorithm (GA), NeuralTools software, and Python programing language in Spyder software was used to develop the three models. Historical data of steel and cement prices as well as macroeconomic indicators in Egypt from May 2008 to June 2018 were used for training, testing, and validation of the proposed models. The inputs to the proposed ANN models are the identified leading economic indicators such as gross domestic product, unemployment rate, and Consumer Price Index (CPI). The developed ANN models show promising results in prediction of month-to-month variations in material prices while having mean-absolute-percentage error that ranges from 4.0% to 11% for the different models. The proposed models can potentially be useful tools for construction contractors as well as owners for predicting and quantifying the fluctuations of major construction materials prices to prepare mitigation measures that will reduce the extra costs incurred.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

References

Adam, A., P.-E. B. Josephson, and G. Lindahl. 2017. “Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications.” Eng. Constr. Archit. Manage. 24 (3): 393–406. https://doi.org/10.1108/ECAM-09-2015-0135.
Akintoye, A., P. Bowen, and C. Hardcastle. 1998. “Macro-economic leading indicators of construction contract prices.” Constr. Manage. Econ. 16 (2): 159–175. https://doi.org/10.1080/014461998372466.
Arditi, D., G. Akan, and S. Gurdamar. 1985. “Cost overruns in public projects.” Int. J. Project Manage. 3 (4): 218–224. https://doi.org/10.1016/0263-7863(85)90053-5.
Ashuri, B., and J. Lu. 2010. “Time series analysis of ENR construction cost index.” J. Constr. Eng. Manage. 136 (11): 1227–1237. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000231.
Ashuri, B., S. M. Shahandashti, and J. Lu. 2012. “Empirical tests for identifying leading indicators of ENR construction cost index.” Constr. Manage. Econ. 30 (11): 917–927. https://doi.org/10.1080/01446193.2012.728709.
Cao, M.-T., M.-Y. Cheng, and Y.-W. Wu. 2015. “Hybrid computational model for forecasting Taiwan construction cost index.” J. Constr. Eng. Manage. 141 (4): 04014089. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000948.
CAPMAS (Central Agency for Public Mobilization and Statistics). 2018a. Monthly bulletin of average retail prices of major important building materials. Arab Republic of Egypt: Public Information Center, Printing Office.
CAPMAS (Central Agency for Public Mobilization and Statistics). 2018b. Monthly bulletin of Consumer Price Index (CPI). Arab Republic of Egypt: Public Information Center, Printing Office.
CAPMAS (Central Agency for Public Mobilization and Statistics). 2018c. Monthly bulletin of Producer Price Index (PPI). Arab Republic of Egypt: Public Information Center, Printing Office.
CAPMAS (Central Agency for Public Mobilization and Statistics). 2018d. Statistical yearbook. Arab Republic of Egypt: Public Information Center, Printing Office.
Ding, S., C. Su, and J. Yu. 2011. “An optimizing BP neural network algorithm based on genetic algorithm.” Artif. Intell. Rev. 36 (2): 153–162. https://doi.org/10.1007/s10462-011-9208-z.
Ernest, K., A.-K. Theophilus, P. Amoah, and B. B. Emmanuel. 2019. “Identifying key economic indicators influencing tender price index prediction in the building industry: A case study of Ghana.” Int. J. Constr. Manage. 19 (2): 106–112. https://doi.org/10.1080/15623599.2017.1389641.
Faghih, S. A. M., and H. Kashani. 2018. “Forecasting construction material prices using vector error correction model.” J. Constr. Eng. Manage. 144 (8): 04018075. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001528.
Fan, R. Y. C., S. T. Ng, and J. M. W. Wong. 2010. “Reliability of the Box–Jenkins model for forecasting construction demand covering times of economic austerity.” Constr. Manage. Econ. 28 (3): 241–254. https://doi.org/10.1080/01446190903369899.
Frimpong, Y., J. Oluwoye, and L. Crawford. 2003. “Causes of delay and cost overruns in construction of groundwater projects in a developing country: Ghana as a case study.” Int. J. Project Manage. 21 (5): 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8.
Granger, C. W. 1969. “Investigating causal relations by econometric models and cross-spectral methods.” Econometrica: J. Econometric Soc. 37 (3): 424–438. https://doi.org/10.2307/1912791.
Hassanein, A. A. G., and B. N. L. Khalil. 2006. “Developing general indicator cost indices for the Egyptian construction industry.” J. Financial Manage. Property Constr. 11 (3): 181–194. https://doi.org/10.1108/13664380680001088.
Hegazy, T., and A. Ayed. 1998. “Neural network model for parametric cost estimation of highway projects.” J. Constr. Eng. Manage. 124 (3): 210–218. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(210).
Hussin, J. M., I. Abdul Rahman, and A. H. Memon. 2013. “The way forward in sustainable construction: Issues and challenges.” Int. J. Adv. Appl. Sci. 2 (1): 15–24. https://doi.org/10.11591/ijaas.v2i1.1321.
Hwang, S. 2009. “Dynamic regression models for prediction of construction costs.” J. Constr. Eng. Manage. 135 (5): 360–367. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000006.
Hwang, S. 2011. “Time series models for forecasting construction costs using time series indexes.” J. Constr. Eng. Manage. 137 (9): 656–662. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000350.
Hwang, S., M. Park, H.-S. Lee, and H. Kim. 2012. “Automated time-series cost forecasting system for construction materials.” J. Constr. Eng. Manage. 138 (11): 1259–1269. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000536.
IMF (International Monetary Fund). 2018. “Challenges to steady growth.” In World economic outlook: Vol. 2018. Washington, DC: International Monetary Fund.
Jain, S., S. Shukla, and R. Wadhvani. 2018. “Dynamic selection of normalization techniques using data complexity measures.” Expert Syst. Appl. 106: 252–262. https://doi.org/10.1016/j.eswa.2018.04.008.
Jiang, H., Y. Xu, and C. Liu. 2013. “Construction price prediction using vector error correction models.” J. Constr. Eng. Manage. 139 (11): 04013022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000729.
Joukar, A., and I. Nahmens. 2016. “Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method.” J. Constr. Eng. Manage. 142 (1): 04015051. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001020.
Khashei, M., and M. Bijari. 2010. “An artificial neural network (p,d,q) model for timeseries forecasting.” Expert Syst. Appl. 37 (1): 479–489. https://doi.org/10.1016/j.eswa.2009.05.044.
Kholif, W. S. 2015. “Analysis of time and cost overrun in educational building projects in Egypt.” M.Sc. dissertation, Construction Engineering and Management, Arab Academy for Science and Technology and Maritime Transport.
Lhee, S. C., R. R. Issa, and I. Flood. 2011. “Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks.” J. Constr. Eng. Manage. 138 (1): 22–30. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000408.
Marzouk, M., and A. Amin. 2013. “Predicting construction materials prices using fuzzy logic and neural networks.” J. Constr. Eng. Manage. 139 (9): 1190–1198. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000707.
Ng, S., S. O. Cheung, R. Martin Skitmore, K. C. Lam, and L. Y. Wong. 2000. “Prediction of tender price index directional changes.” Constr. Manage. Econ. 18 (7): 843–852. https://doi.org/10.1080/014461900433122.
Ng, S. T., S. O. Cheung, M. Skitmore, and T. C. Y. Wong. 2004. “An integrated regression analysis and time series model for construction tender price index forecasting.” Constr. Manage. Econ. 22 (5): 483–493. https://doi.org/10.1080/0144619042000202799.
Olatunji, O. A. 2010. “The impact of oil price regimes on construction cost in Nigeria.” Constr. Manage. Econ. 28 (7): 747–759. https://doi.org/10.1080/01446191003725162.
Oshodi, O., O. A. Ejohwomu, I. O. Famakin, and P. Cortez. 2017. “Comparing univariate techniques for tender price index forecasting: Box–Jenkins and neural network model.” Constr. Econ. Build. 17 (3): 109. https://doi.org/10.5130/AJCEB.v17i3.5524.
Pewdum, W., T. Rujirayanyong, and V. Sooksatra. 2009. “Forecasting final budget and duration of highway construction projects.” Eng. Constr. Archit. Manage. 16 (6): 544. https://doi.org/10.1108/09699980911002566.
Saidu, I., and W. Shakantu. 2017. “An investigation into cost overruns for ongoing building projects in Abuja, Nigeria.” Acta Structilia 24 (1): 53–72. https://doi.org/10.18820/24150487/as24i1.3.
Shahandashti, S. M., and B. Ashuri. 2013. “Forecasting Engineering News-Record construction cost index using multivariate time series models.” J. Constr. Eng. Manage. 139 (9): 1237–1243. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000689.
Shahandashti, S. M., and B. Ashuri. 2016. “Highway construction cost forecasting using vector error correction models.” J. Manage. Eng. 32 (2): 04015040. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000404.
Toor, S.-U.-R., and S. Ogunlana. 2008. “Problems causing delays in major construction projects in Thailand.” Constr. Manage. Econ. 26 (4): 395–408. https://doi.org/10.1080/01446190801905406.
Wang, L., Y. Zeng, and T. Chen. 2015. “Back propagation neural network with adaptive differential evolution algorithm for time series forecasting.” Expert Syst. Appl. 42 (2): 855–863. https://doi.org/10.1016/j.eswa.2014.08.018.
Williams, T. P. 1994. “Predicting changes in construction cost indexes using neural networks.” J. Constr. Eng. Manage. 120 (2): 306–320. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(306).
Wong, J. M. W., A. P. C. Chan, and Y. H. Chiang. 2005. “Time series forecasts of the construction labour market in Hong Kong: The Box–Jenkins approach.” Constr. Manage. Econ. 23 (9): 979–991. https://doi.org/10.1080/01446190500204911.
Wong, J. M. W., and S. T. Ng. 2010. “Forecasting construction tender price index in Hong Kong using vector error correction model.” Constr. Manage. Econ. 28 (12): 1255–1268. https://doi.org/10.1080/01446193.2010.487536.
Xiao, C., J. Ye, R. M. Esteves, and C. Rong. 2016. “Using Spearman’s correlation coefficients for exploratory data analysis on big dataset.” Concurrency Comput.: Pract. Experience 28 (14): 3866–3878. https://doi.org/10.1002/cpe.3745.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 3March 2020

History

Received: Apr 9, 2019
Accepted: Aug 16, 2019
Published online: Jan 10, 2020
Published in print: Mar 1, 2020
Discussion open until: Jun 10, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Master of Science Graduate, Dept. of Construction Engineering, American Univ. in Cairo, Parcel 8, 74 S El-Teseen St., New Cairo, Cairo 11835, Egypt (corresponding author). ORCID: https://orcid.org/0000-0002-0106-7376. Email: [email protected]
Elkhayam M. Dorra, Ph.D.
Adjunct Assistant Professor, Dept. of Construction Engineering, American Univ. in Cairo, Parcel 8, 74 S El-Teseen St., New Cairo, Cairo 11835, Egypt.
Khaled Nassar, Ph.D.
Professor, Dept. of Construction Engineering, American Univ. in Cairo, Parcel 8, 74 S El-Teseen St., New Cairo, Cairo 11835, Egypt.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share