Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects

Publication: Journal of Construction Engineering and Management
Volume 145, Issue 12

Abstract

This article aims to identify design-construction interface problems and their causes in design-build projects to present solutions to resolve these problems. Accordingly, through a qualitative multiple–case study approach in four Iranian design-build projects, 26 problems were identified, some of the most important of which are too much employer interference in design and construction, poor planning and scheduling, and poor decision making by employers. Knowing the causes and their causation, which are related to all project phases, can help practitioners consider them and avoid their unfavorable consequences in future projects, improve the interface integration, and make better decisions that can potentially enhance project performance. In addition, the problems were prioritized to determine the top 10 problems. Eventually, the experts recommended 10 solutions according to the most important causes and two main root causes, including poor public culture and misunderstanding of the design-build term. In conclusion, it is worth bearing in mind that this study opens a new perspective in exploring the root causes of design-construction interface problems.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request.

Acknowledgments

The authors would like to thank the participating experts for their generous and feedback. The authors gratefully acknowledge the following those who made valuable suggestions or who have otherwise contributed to the preparation of this research: Mohsen Ansari, Hamid Soltanmohammadi, Marzi Kahnamelli, Mohammad Hossein Mahmoudi Sari, Moslem Darabi, Hadi Mahami, Mehdi Delavari, Ali Khatmimaab, Hesam Barhemmat, Ehsan Forsatkar, and Kazem Tabatabayi. The views expressed and conclusions in this paper are those of the authors and do not reflect the views of the people.

References

Alarcón, L. F., and D. A. Mardones. 1998. “Improving the design-construction interface.” In Proc., 6th Annual Meeting of the Int. Group for Lean Construction. Guarujá, Brazil: International Group for Lean Construction.
Al-Hammad, A., and S. Assaf. 1992. “Design-construction interface problems in Saudi Arabia: Survey showed that working drawing details, unfamiliarity with local conditions and buildability ranked as highest interface problems.” Build. Res. Info. 20 (1): 60–63. https://doi.org/10.1080/09613219208727172.
Al-Hammad, A. M. 1995. “Interface problems between owners and maintenance contractors in Saudi Arabia.” J. Perform. Constr. Facil. 9 (3): 194–205. https://doi.org/10.1061/(ASCE)0887-3828(1995)9:3(194).
Al-Hammad, A. M. 2000. “Common interface problems among various construction parties.” J. Perform. Constr. Facil. 14 (2): 71–74. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:2(71).
Al-Hammad, A. M., and I. Al-Hammad. 1996. “Interface problems between building owners and designers.” J. Perform. Constr. Facil. 10 (3): 123–126. https://doi.org/10.1061/(ASCE)0887-3828(1996)10:3(123).
Awakul, P., and S. O. Ogunlana. 2002. “The effect of attitudinal differences on interface conflicts in large scale construction projects: A case study.” Constr. Manage. Econ. 20 (4): 365–377. https://doi.org/10.1080/01446190210133456.
Baiden, B. K., A. D. Price, and A. R. Dainty. 2006. “The extent of team integration within construction projects.” Int. J. Project Manage. 24 (1): 13–23. https://doi.org/10.1016/j.ijproman.2005.05.001.
Beard, J., M. Loulakis, and E. Wundram. 2001. Design-build: Planning through development. New York: McGraw-Hill.
Bogus, S., J. E. Diekmann, and K. R. Molenaar. 2003. “A methodology to reconfigure the design-construction interface for fast-track projects.” In Proc., Information Technology in Computing in Civil Engineering (2002). Reston, VA: ASCE.
Chan, W. T., C. Chen, J. I. Messner, and D. K. Chua. 2005. “Interface management for China’s build–operate–transfer projects.” J. Constr. Eng. Manage. 131 (6): 645–655. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(645).
Chen, Q., G. Reichard, and Y. Beliveau. 2007. “Interface management-a facilitator of lean construction and agile project management.” Int. Group Lean Constr. 1 (1): 57–66.
Chen, Q., G. Reichard, and Y. Beliveau. 2008. “Multiperspective approach to exploring comprehensive cause factors for interface issues.” J. Constr. Eng. Manage. 134 (6): 432–441. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:6(432).
Chua, D. K., and M. Godinot. 2006. “Use of a WBS matrix to improve interface management in projects.” J. Constr. Eng. Manage. 132 (1): 67–79. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(67).
Creswell, J. W. 2013. Research design: Qualitative, quantitative, and mixed methods approaches. Thousand Oaks, CA: Sage.
Galloway, P. 2009. “Design-build/EPC contractor’s heightened risk: Changes in a changing world.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 1 (1): 7–15. https://doi.org/10.1061/(ASCE)1943-4162(2009)1:1(7).
Geyer, A., and A. Davies. 2000. “Managing project–system interfaces: Case studies of railway projects in restructured UK and German markets.” Res. Policy 29 (7–8): 991–1013. https://doi.org/10.1016/S0048-7333(00)00116-5.
Goulding, C. 2002. Grounded theory: A practical guide for management, business and market researchers. Thousand Oaks, CA: Sage.
Healy, P. L. 1997. Project management: Getting the job done on time and in budget. New York: Routledge.
Huang, R. Y., C. T. Huang, H. Lin, and W. H. Ku. 2008. “Factor analysis of interface problems among construction parties—A case study of MRT.” J. Mar. Sci. Technol. 16 (1): 52–63.
Khanzode, A., M. Fischer, and S. Hamburg. 2000. “Effect of information standards on the design-construction interface: Case examples from the steel industry.” In Proc., 8th Int. Conf. on Computing in Civil and Building Engineering (ICCCBE-VIII). Reston, VA: ASCE.
Kostera, M. 2012. Organizations and archetypes. Cheltenham, UK: Edward Elgar Publishing.
Lopez del Puerto, C., D. D. Gransberg, and J. S. Shane. 2008. “Comparative analysis of owner goals for design/build projects.” J. Manage. Eng. 24 (1): 32–39. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:1(32).
Lu, H., and R. R. Issa. 2005. “Extended production integration for construction: A loosely coupled project model for building construction.” J. Comput. Civ. Eng. 19 (1): 58–68. https://doi.org/10.1061/(ASCE)0887-3801(2005)19:1(58).
McCarney, M., and A. Gibb. 2012. “Interface management from an offsite construction perspective.” In Proc., 28th Annual ARCOM Conf., 775–784. Edinburgh, UK: Association of Researchers in Construction Management.
McCarthy, T. J., H. J. Kahn, T. M. S. Elhag, A. R. Williams, R. Milburn, and M. B. Patel. 2000. “Knowledge management in the designer/constructor interface.” In Proc., Computing in Civil and Building Engineering (2000). Edinburgh, UK: Association of Researchers in Construction Management.
Miles, R. S., and G. Ballard. 2002. “Problems in the interface between mechanical design and construction: A research proposal.” Constr. Res. 3 (1): 83–95. https://doi.org/10.1142/S1609945102000084.
Mitchell, A., I. Frame, A. Coday, and M. Hoxley. 2011. “A conceptual framework of the interface between the design and construction processes.” Eng. Constr. Archit. Manage. 18 (3): 297–311. https://doi.org/10.1108/09699981111126197.
Mitropoulos, P., and C. Tatum. 2000. “Management-driven integration.” J. Manage. Eng. 16 (1): 48–58. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:1(48).
Morris, P. W. 1983. “Managing project interfaces: Key points for project success.” Project Manage. Handb. 2: 423. https://doi.org/10.1002/9780470172353.ch2.
Murugaiah, U., S. Jebaraj Benjamin, M. Srikamaladevi Marathamuthu, and S. Muthaiyah. 2010. “Scrap loss reduction using the 5-whys analysis.” Int. J. Qual. Reliab. Manage. 27 (5): 527–540. https://doi.org/10.1108/02656711011043517.
Pavitt, T., and A. Gibb. 2003. “Interface management within construction: In particular, building façade.” J. Constr. Eng. Manage. 129 (1): 8–15. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(8).
Sha’ar, K. Z., S. A. Assaf, T. Bambang, M. Babsail, and A. M. A. E. Fattah. 2016. “Design–construction interface problems in large building construction projects.” Int. J. Constr. Manage 17 (3): 1–13. https://doi.org/10.1080/15623599.2016.1187248.
Shokri, S., M. Safa, C. T. Haas, R. C. Haas, K. Maloney, and S. MacGillivray. 2012. “Interface management model for mega capital projects.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World. Reston, VA: ASCE.
Takim, R., M. R. Esa, and S. H. A. Hamid. 2013. “Delivering best value for design and build (D&B) projects through integrated process improvements solution.” Procedia-Social Behav. Sci. 101 (Nov): 62–70. https://doi.org/10.1016/j.sbspro.2013.07.179.
Weshah, N., W. E. Ghandour, G. Jergeas, and L. C. Falls. 2013. “Factor analysis of the interface management (IM) problems for construction projects in Alberta.” Can. J. Civ. Eng. 40 (9): 848–860. https://doi.org/10.1139/cjce-2012-0531.
Wideman, M. 2003. “Wideman comparative glossary of common project management terms version 3.2.” Accessed September 1, 2019. http://www.maxwideman.com/pmglossary/index.htm.
Wren, D. A. 1967. “Interface and interorganizational coordination.” Acad. Manage. J. 10 (1): 69–81. https://doi.org/10.5465/255245.
Yates, J. K. 1995. “Use of design/build in E/C industry.” J. Manage. Eng. 11 (6): 33–38. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:6(33).
Yeo, K. T., and J. H. Ning. 2002. “Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects.” Int. J. Project Manage. 20 (4): 253–262. https://doi.org/10.1016/S0263-7863(01)00021-7.
Yin, R. K. 2009. Case study research: Design and methods. Thousand Oaks, CA: SAGE.
Yun, S., S. P. Mulva, and W. J. O’brien. 2012. “A quantitative approach for measuring managerial interfaces in the development of a capital project.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World. Reston, VA: ASCE.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 145Issue 12December 2019

History

Received: Nov 7, 2018
Accepted: Apr 26, 2019
Published online: Oct 15, 2019
Published in print: Dec 1, 2019
Discussion open until: Mar 15, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Azadeh A. Yeganeh [email protected]
Master Degree, Project Management and Construction Dept., Architecture and Urban Planning Faculty, Univ. of Art, Tehran 1136813518, Iran. Email: [email protected]
Mojtaba Azizi [email protected]
Assistant Professor, Project Management and Construction Dept., Art and Architecture Faculty, Tarbiat Modares Univ., Jalal Ale Ahmad Highway, Tehran 1411713116, Iran (corresponding author). Email: [email protected]; [email protected]
Reza Falsafi [email protected]
Assistant Professor, Project Management and Construction Dept., Architecture and Urban Planning Faculty, Univ. of Art, Tehran 1136813518, Iran. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share