Optimization of Job Allocation in Construction Organizations to Maximize Workers’ Career Development Opportunities

Publication: Journal of Construction Engineering and Management
Volume 145, Issue 6

Abstract

Workforce planning in the construction industry too often ignores the symbiotic relationship between employee and employer objectives by overly concentrating on corporate objectives such as maximizing productivity at the expense of construction workers’ career development needs. Overall, the consequence of this approach is suboptimal performance. To address this problem, this paper presents an innovative multiobjective model that enables managers to optimize the relationship between these interdependent corporate priorities. The proposed model was implemented and solved using mixed-integer nonlinear programming on a case study involving the allocation of tasks to employees with different skill levels in a multidisciplinary engineering consulting company. While leading to a small loss of productivity, the results show a significant improvement in the career development of workers compared to conventional productivity-oriented workforce planning models, with on average 8.6% improvement in employees’ closeness to their ideal skill set. Furthermore, the model produced Pareto-optimal points and a Pareto curve that enabled client-model users to select optimum job allocation based on their preferences. This research represents a paradigm shift toward a new class of socially responsible workforce planning models in which the objectives of both employees and employers are optimized.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

References

ABC (Australian Bureau of Statistics). 2014. Labour force, Australia, detailed, quarterly, Aug 2014. Canberra, Australia: ABC.
ABC (Australian Bureau of Statistics). 2016. Labour force, Australia, detailed, quarterly, Nov 2016. Canberra, Australia: ABC.
ABC (Australian Bureau of Statistics). 2017. Labour force, Australia, detailed, quarterly, Nov 2017. Canberra, Australia: ABC.
Agrell, P. J., P. Bogetoft, and J. Tind. 2002. “Incentive plans for productive efficiency, innovation and learning.” Int. J. Prod. Econ. 78 (1): 1–11. https://doi.org/10.1016/S0925-5273(00)00097-9.
Ahmadian Fard Fini, A., A. Akbarnezhad, T. H. Rashidi, and S. T. Waller. 2016. “Job assignment based on brain demands and human resource strategies.” J. Constr. Eng. Manage. 143 (5): 04016123. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001273.
Ahmadian Fard Fini, A., A. Akbarnezhad, T. H. Rashidi, and S. T. Waller. 2017. “Dynamic programming approach toward optimization of workforce planning decisions.” J. Constr. Eng. Manage. 144 (2): 04017113. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001434.
Ahmadian Fard Fini, A., T. H. Rashidi, A. Akbarnezhad, and S. T. Waller. 2015. “Incorporating multiskilling and learning in the optimization of crew composition.” J. Constr. Eng. Manage. 142 (5): 04015106. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001085.
Anzanello, M. J., and F. S. Fogliatto. 2011. “Learning curve models and applications: Literature review and research directions.” Int. J. Ind. Ergon. 41 (5): 573–583. https://doi.org/10.1016/j.ergon.2011.05.001.
Azizi, N., S. Zolfaghari, and M. Liang. 2010. “Modeling job rotation in manufacturing systems: The study of employee’s boredom and skill variations.” Int. J. Prod. Econ. 123 (1): 69–85. https://doi.org/10.1016/j.ijpe.2009.07.010.
Ballard, G., and G. Howell. 1998. “Shielding production: Essential step in production control.” J. Constr. Eng. Manage. 124 (1): 11–17. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11).
Baradan, S., S. U. Dikmen, and O. A. Kale. 2018. “Impact of human development on safety consciousness in construction.” Int. J. Occup. Safety Ergon. 25 (1): 1–42. https://doi.org/10.1080/10803548.2018.1445069.
Barbosa, F., J. Woetzel, J. Mischke, M. J. Ribeirinho, M. Sridhar, M. Parsons, N. Bertram, and S. Brown. 2017. Reinventing construction: A route to higher productivity. New York: McKinsey and Company and McKinsey Global Institute.
Batton, L. 2017. “The use of humor with families during pediatric trauma intake assessments.” Ph.D. dissertation, Minneapolis, MN: College of Social and Behavioral Sciences, Walden Univ.
Belotti, P. 2009. COUENNE: A user’s manual. Bethlehem, PA: Lehigh Univ.
Betts, M., G. Robinson, N. Blake, C. Burton, and D. Godden. 2011. Global construction 2020: A global forecast for the construction industry over the next decade to 2020. London: Global Construction Perspectives and Oxford Economics.
Blatter, M., S. Muehlemann, and S. Schenker. 2012. “The costs of hiring skilled workers.” Eur. Econ. Rev. 56 (1): 20–35. https://doi.org/10.1016/j.euroecorev.2011.08.001.
BLS (Bureau of Labor Statistics). 2017. Occupational employment statistics. Washington, DC: BLS.
Brown, D. 1995. “A values-based approach to facilitating career transitions.” Career Dev. Q. 44 (1): 4–11. https://doi.org/10.1002/j.2161-0045.1995.tb00524.x.
Brown, D. 2002a. Career choice and development. San Francisco: Jossey-Bass.
Brown, D. 2002b. “The role of work and cultural values in occupational choice, satisfaction, and success: A theoretical statement.” J. Counseling Dev. 80 (1): 48–56. https://doi.org/10.1002/j.1556-6678.2002.tb00165.x.
CICA (Career Industry Council of Australia). 2015. Australian jobs. Canberra, Australia: Dept. of Employment.
Collin, A., and R. A. Young. 1986. “New directions for theories of career.” Human Relat. 39 (9): 837–853. https://doi.org/10.1177/001872678603900904.
Colquitt, J. A. 2001. “On the dimensionality of organizational justice: A construct validation of a measure.” J. Appl. Psychol. 86 (3): 386. https://doi.org/10.1037/0021-9010.86.3.386.
Dainty, A., and M. Loosemore. 2013. Human resource management in construction projects. Abingdon, UK: Taylor & Francis Group.
Dar-El, E. M. 2013. Human learning: From learning curves to learning organizations. London: Springer.
David, H., R. K. William, and A. D. Kugler. 2007. “Does employment protection reduce productivity? Evidence from US states.” Econ. J. 117 (521): 117. https://doi.org/10.1111/j.1468-0297.2007.02055.x.
Dawis, R. V., and L. H. Lofquist. 1984. A psychological theory of work adjustment: An individual-differences model and its applications. Minneapolis: University of Minnesota Press.
De Bruecker, P., J. Van den Bergh, J. Beliën, and E. Demeulemeester. 2015. “Workforce planning incorporating skills: State of the art.” Eur. J. Oper. Res. 243 (1): 1–16. https://doi.org/10.1016/j.ejor.2014.10.038.
Dreyfus, S. E. 1982. “Formal models vs. human situational understanding: Inherent limitations on the modeling of business expertise.” Office Technol. People 1 (2/3): 133–165. https://doi.org/10.1108/eb022609.
Farmer, M. 2016. The Farmer review of the UK construction labour model. London: Construction Leadership Council.
Fioretti, G. 2007. “The organizational learning curve.” Eur. J. Oper. Res. 177 (3): 1375–1384. https://doi.org/10.1016/j.ejor.2005.04.009.
Fourer, R., D. M. Gay, and B. W. Kernighan. 2003. AMPL: A modeling language for mathematical programming. Belmont, CA: Thomson/Brooks/Cole.
Global Construction Perspectives and Oxford Economics. 2013. Global construction 2025. A global forecast for the construction industry to 2025. London: Global Construction Perspectives and Oxford Economics.
Gomar, J. E., C. T. Haas, and D. P. Morton. 2002. “Assignment and allocation optimization of partially multiskilled workforce.” J. Constr. Eng. Manage. 128 (2): 103–109. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(103).
Gottfredson, L. S. 1981. “Circumscription and compromise: A developmental theory of occupational aspirations.” J. Counseling Psychol. 28 (6): 545–579. https://doi.org/10.1037/0022-0167.28.6.545.
Gottlieb, S. C., and K. Haugbølle. 2010. The repetition effect in building and construction works: A literature review. Hørsholm, Denmark: SBi Forlag.
Heimerl, C., and R. Kolisch. 2010. “Work assignment to and qualification of multi-skilled human resources under knowledge depreciation and company skill level.” Int. J. Prod. Res. 48 (13): 3759–3781. https://doi.org/10.1080/00207540902852785.
Holland, J. L. 1985. Making vocational choices: A theory of vocational personalities and work environments. Englewood Cliffs, NJ: Prentice-Hall.
Holland, J. L. 1997. Making vocational choices: A theory of vocational personalities and work environments. 3rd ed. Odessa, FL: Psychological Assessment Resources.
Hoshmand, L., and L. S. Tsoi. 1989. “Alternate research paradigms: A review and teaching proposal.” Counseling Psychol. 17 (1): 3–79. https://doi.org/10.1177/0011000089171001.
HRS (HR Society). 2013. The complete guide to workforce planning. Market Harborough, UK: HRS.
Hu, X., and C. Liu. 2016. “Carbon productivity: A case study in the Australian construction industry.” J. Cleaner Prod. 112 (4): 2354–2362. https://doi.org/10.1016/j.jclepro.2015.10.042.
Kalleberg, A. L. 1977. “Work values and job rewards: A theory of job satisfaction.” Am. Sociological Rev. 42 (1): 124–143. https://doi.org/10.2307/2117735.
Kazaz, A., E. Manisali, and S. Ulubeyli. 2008. “Effect of basic motivational factors on construction workforce productivity in Turkey.” J. Civ. Eng. Manage. 14 (2): 95–106. https://doi.org/10.3846/1392-3730.2008.14.4.
Kester, D. L. 2014. “Career decisions among reintegrating military veterans: Implications for postsecondary and adult education.” Ph.D. dissertation, School of Education, Capella Univ.
Krumboltz, J. D., A. M. Mitchell, and G. B. Jones. 1979. Social learning and career decision making. Cranston, RI: Carroll Press.
Lent, R. W., S. D. Brown, and G. Hackett. 1994. “Toward a unifying social cognitive theory of career and academic interest, choice, and performance.” J. Vocational Behav. 45 (1): 79–122. https://doi.org/10.1006/jvbe.1994.1027.
Lim, B. T. H., and M. Loosemore. 2017. “The effect of inter-organizational justice perceptions on organizational citizenship behaviors in construction projects.” Int. J. Project Manage. 35 (2): 95–106. https://doi.org/10.1016/j.ijproman.2016.10.016.
Lingard, H., K. Brown, L. Bradley, C. Bailey, and K. Townsend. 2007. “Improving employees’ work-life balance in the construction industry: Project alliance case study.” J. Constr. Eng. Manage. 133 (10): 807–815. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:10(807).
Long, L. D., and A. Ohsato. 2009. “A genetic algorithm-based method for scheduling repetitive construction projects.” Autom. Constr. 18 (4): 499–511. https://doi.org/10.1016/j.autcon.2008.11.005.
Loosemore, M., and B. T. H. Lim. 2017. “Linking corporate social responsibility and organizational performance in the construction industry.” Constr. Manage. Econ. 35 (3): 90–105. https://doi.org/10.1080/01446193.2016.1242762.
Majozi, T., and X. X. Zhu. 2005. “A combined fuzzy set theory and MILP approach in integration of planning and scheduling of batch plants—Personnel evaluation and allocation.” Comput. Chem. Eng. 29 (9): 2029–2047. https://doi.org/10.1016/j.compchemeng.2004.07.038.
Mani, N., K. P. Kisi, E. M. Rojas, and E. T. Foster. 2017. “Estimating construction labor productivity frontier: Pilot study.” J. Constr. Eng. Manage. 143 (10): 04017077. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001390.
Matthews, P. 1999. “Workplace learning: Developing an holistic model.” Learn. Organiz. 6 (1): 18–29. https://doi.org/10.1108/09696479910255684.
MBA (Master Builders Association). 2017. Master builder. Forest Lodge, Australia: MBA.
Medoff, J. L., and K. G. Abraham. 1980. “Experience, performance, and earnings.” Q. J. Econ. 95 (4): 703–736. https://doi.org/10.3386/w0278.
Migliaccio, G. C., and L. Holm. 2018. Introduction to construction project engineering. Abingdon, UK: Routledge.
Mitchell, A. M. 1974. A social learning theory of career decision making. Palo Alto, CA: American Institutes for Research.
Moore, D. R., M.-I. Cheng, and A. R. J. Dainty. 2002. “Competence, competency and competencies: Performance assessment in organizations.” Work Study 51 (6): 314–319. https://doi.org/10.1108/00438020210441876.
Morganson, V. J., D. A. Major, K. L. Oborn, J. M. Verive, and M. P. Heelan. 2010. “Comparing telework locations and traditional work arrangements: Differences in work-life balance support, job satisfaction, and inclusion.” J. Managerial Psychol. 25 (6): 578–595. https://doi.org/10.1108/02683941011056941.
Nembhard, D. A., and N. Osothsilp. 2002. “Task complexity effects on between-individual learning/forgetting variability.” Int. J. Ind. Ergon. 29 (5): 297–306. https://doi.org/10.1016/S0169-8141(01)00070-1.
Nguyen, H. T., and B. Hadikusumo. 2017. “Impacts of human resource development on engineering, procurement, and construction project success.” Built Environ. Project Asset Manage. 7 (1): 73–85. https://doi.org/10.1108/BEPAM-04-2016-0010.
Othman, M., N. Bhuiyan, and G. J. Gouw. 2012. “Integrating workers’ differences into workforce planning.” Comput. Ind. Eng. 63 (4): 1096–1106. https://doi.org/10.1016/j.cie.2012.06.015.
Pananiswami, S., and R. C. Bishop. 1991. “Behavioral implications of the learning curve for production capacity analysis.” Int. J. Prod. Econ. 24 (1–2): 157–163. https://doi.org/10.1016/0925-5273(91)90162-M.
Parsons, F. 1909. Choosing a vocation. Boston: Houghton Mifflin.
Peterson, G. W., J. P. Sampson Jr., and R. C. Reardon. 1991. Career development and services: A cognitive approach. Belmont, CA: Thomson Brooks/Cole Publishing.
Probst, T. M., S. M. Stewart, M. L. Gruys, and B. W. Tierney. 2007. “Productivity, counterproductivity and creativity: The ups and downs of job insecurity.” J. Occup. Organ. Psychol. 80 (3): 479–497. https://doi.org/10.1348/096317906X159103.
Raiden, A. B., A. R. J. Dainty, and R. H. Neale. 2008. “Understanding employee resourcing in construction organizations.” Constr. Manage. Econ. 26 (11): 1133–1143. https://doi.org/10.1080/01446190802422153.
Rodriguez, A. M. 1998. “Planning and scheduling a multiskilled workforce.” Ph.D. dissertation, Dept. of Civil Engineering, Univ. of Texas at Austin.
Ruan, X., E. Ochieng, T. Zuofa, and M. Yang. 2016. “An appraisal of lean construction project delivery application of lean construction.” In Proc., Int. Conf. on Logistics, Informatics and Service Sciences. Piscataway, NJ: IEEE.
Russell, R. J. 2002. Guide to hiring and retaining great civil engineers. Reston, VA: ASCE.
Safe Work Australia. 2014. Construction work code of practice. Canberra, Australia: Safe Work Australia.
Smith, P. J. 2003. “Workplace learning and flexible delivery.” Rev. Educ. Res. 73 (1): 53–88. https://doi.org/10.3102/00346543073001053.
Srour, I. M., C. T. Haas, and D. P. Morton. 2006. “Linear programming approach to optimize strategic investment in the construction workforce.” J. Constr. Eng. Manage. 132 (11): 1158–1166. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:11(1158).
Vereen, S. C., W. Rasdorf, and J. E. Hummer. 2016. “Development and comparative analysis of construction industry labor productivity metrics.” J. Constr. Eng. Manage. 142 (7): 04016020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001112.
Werther, W. B., Jr., and K. Davis. 1985. Personnel management and human resources. New York: McGraw-Hill.
Wilber, K. 1989. “Let’s nuke the transpersonalists: A response to Albert Ellis.” J. Counseling Dev. 67 (6): 332–335. https://doi.org/10.1002/j.1556-6676.1989.tb02618.x.
Wright, T. P. 1936. “Factors affecting the cost of airplanes.” J. Aeronaut. Sci. 3 (4): 122–128. https://doi.org/10.2514/8.155.
Yi, W., and A. P. C. Chan. 2013. “Critical review of labor productivity research in construction journals.” J. Manage. Eng. 30 (2): 214–225. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000194.
Zahran, K., M. Nour, and O. Hosny. 2016. “The effect of learning on line of balance scheduling: Obstacles and potentials.” Int. J. Eng. Sci. Comput. 6 (4): 3831–3841.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 145Issue 6June 2019

History

Received: Jun 27, 2018
Accepted: Nov 2, 2018
Published online: Apr 15, 2019
Published in print: Jun 1, 2019
Discussion open until: Sep 15, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Babak Shahbazi [email protected]
Ph.D. Candidate, School of Civil and Environmental Engineering, Univ. of New South Wales, Sydney, NSW 2052, Australia. Email: [email protected]
Ali Akbarnezhad [email protected]
Associate Professor, School of Civil Engineering, Univ. of Sydney, Sydney, NSW 2006, Australia (corresponding author). Email: [email protected]
Lecturer, School of Civil and Environmental Engineering, Univ. of New South Wales, Sydney, NSW 2052, Australia. Email: [email protected]
Alireza Ahmadian Fard Fini [email protected]
Lecturer, School of the Built Environment, Univ. of Technology, Sydney, NSW 2007, Australia. Email: [email protected]
Martin Loosemore [email protected]
Professor, School of the Built Environment, Univ. of New South Wales, Sydney, NSW 2052, Australia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share