Technical Papers
Nov 10, 2018

Effect of Level of Owner-Provided Design on Contractor’s Design Quality in DB/EPC Projects

Publication: Journal of Construction Engineering and Management
Volume 145, Issue 1

Abstract

Although previous studies have suggested that the level of owner-provided design can influence the performance of design-build (DB) projects, few have explicitly and empirically investigated the effect of the level of owner-provided design on the contractor’s design quality. This paper fills this gap by empirically investigating the effect of the level of owner-provided design on the design quality of contractors in DB projects. Questionnaires were collected from 243 Chinese project professionals and hierarchical regression analysis was conducted. Empirical results reveal that the level of owner-provided design negatively affects design innovation and positively affects design change. The contractor’s competence strengthens the effect of owner-provided design level on design innovation. A minimum proportion of owner-provided design can improve design quality. It is also necessary to ensure the clear articulation of requirements in the request for proposal (RFP). The findings contribute to the understanding of the relationship between the level of owner-provided design and the contractor’s design quality in DB projects. These findings also give owners insight into the preparation of the RFP with regard to the optimal level of design.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statements

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

This research was financially supported by the National Natural Science Foundation of China (Grant Nos. 71572124 and 71231006). The authors would like to thank the interviewees and respondents who participated in the survey.

References

AASHTO. 2005. “Design-build environmental process and level of detail: Eight case studies.” Accessed October 18, 2018. http://onlinepubs.trb.org/onlinepubs/archive/NotesDocs/25-25(12)_FR.pdf.
Abdelrahman, M., T. Zayed, and A. Elyamany. 2008. “Best-value model based on project specific characteristics.” J. Constr. Eng. Manage. 134 (3): 179–188. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:3(179).
Aibinu, A. A., G. Ofori, and F. Y. Ling. 2008. “Explaining cooperative behavior in building and civil engineering projects’ claims process: Interactive effects of outcome favorability and procedural fairness.” J. Constr. Eng. Manage. 134 (9): 681–691. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(681).
Akintoye, A. 1994. “Design and build: A survey of construction contractors’ views.” Constr. Manage. Econ. 12 (2): 155–163. https://doi.org/10.1080/01446199400000021.
Al-Momani, A. H. 2000. “Examining service quality within construction processes.” Technovation 20 (11): 643–651. https://doi.org/10.1016/S0166-4972(00)00002-X.
Anumba, C. J., and N. F. Evbuomwan. 1997. “Concurrent engineering in design-build projects.” Constr. Manage. Econ. 15 (3): 271–281. https://doi.org/10.1080/014461997373006.
Arditi, D., and D. E. Lee. 2004. “Service quality performance of design/build contractors using quality function deployment.” Constr. Manage. Econ. 22 (2): 123–127. https://doi.org/10.1080/0144619042000201321.
Ashford, J. L. 2002. The management of quality in construction. London: Routledge.
Baccarini, D. 1999. “The logical framework method for defining project success.” Project Manage. J. 30 (4): 25–32. https://doi.org/10.1177/875697289903000405.
Bagozzi, R. P., and Y. Yi. 1988. “On the evaluation of structural equation models.” J. Acad. Marketing Sci. 16 (1): 74–94. https://doi.org/10.1007/BF02723327.
Barrie, D. S., and B. C. Paulson. 1992. Professional construction management: Including CM, design-construct, and general contracting. 3rd ed. New York: McGraw-Hill.
Basu, R. 2014. “Managing quality in projects: An empirical study.” Int. J. Project Manage. 32 (1): 178–187. https://doi.org/10.1016/j.ijproman.2013.02.003.
Beard, J., E. M. Loulakis, and E. Wundram. 2001. Design-build: Planning through development. New York: McGraw-Hill.
Chan, A. P. C., D. C. Ho, and C. Tam. 2001. “Design and build project success factors: Multivariate analysis.” J. Constr. Eng. Manage. 127 (2): 93–100. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(93).
Chan, A. P. C., D. Scott, and E. W. M. Lam. 2002. “Framework of success criteria for design/build projects.” J. Manage. Eng. 18 (3): 120–128. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120).
Chan, E. H. W., and A. T. W. Yu. 2005. “Contract strategy for design management in the design and build system.” Int. J. Project Manage. 23 (8): 630–639. https://doi.org/10.1016/j.ijproman.2005.05.004.
Conlin, J., D. Langford, and P. Kennedy. 1996. “The relationship between construction procurement strategies and construction contract disputes.” In Proc., CIB W92 Symp. North Meets South: Developing Ideas. South Africa: Univ. of Natal.
Cserhati, G., and L. Szabo. 2014. “The relationship between success criteria and success factors in organisational event projects.” Int. J. Project Manage. 32 (4): 613–624. https://doi.org/10.1016/j.ijproman.2013.08.008.
Demirkesen, S., and B. Ozorhon. 2017. “Impact of integration management on construction project management performance.” Int. J. Project Manage. 35 (8): 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008.
Desai, P. S. 2001. “Quality segmentation in spatial markets: When does cannibalization affect product line design?” Marketing Sci. 20 (3): 265–283. https://doi.org/10.1287/mksc.20.3.265.9767.
Dewar, R. D., and J. E. Dutton. 1986. “The adoption of radical and incremental innovations: An empirical analysis.” Management Sci. 32 (11): 1422–1433. https://doi.org/10.1287/mnsc.32.11.1422.
Dong, Y., H. Liao, A. Chuang, J. Zhou, and E. M. Campbell. 2015. “Fostering employee service creativity: Joint effects of customer empowering behaviors and supervisory empowering leadership.” J. Appl. Psychol. 100 (5): 1364–1380. https://doi.org/10.1037/a0038969.
Dulamimi, M., G. Morris, and T. Baxendale. 1995. “The role of design management in improving the effectiveness of design and build projects.” In Proc., Int. Congress on Construction Design and Build Projects—International Experiences, 5–6. Singapore.
Federal Highway Administration. 2006. “Design-build effectiveness study.” Accessed October 18, 2018. https://www.fhwa.dot.gov/reports/designbuild/designbuild.pdf.
FIDIC (International Federation of Consulting Engineers). 1999. Conditions of contract for EPC/Turnkey projects. Geneva: FIDIC.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Marketing Res. 18 (1): 39–50. https://doi.org/10.2307/3151312.
Fredrickson, K. 1998. “Design guidelines for design-build projects.” J. Manage. Eng. 14 (1): 77–80. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:1(77).
Gaafar, H., and J. Perry. 1999. “Limitation of design liability for contractors.” Int. J. Project Manage. 17 (5): 301–308. https://doi.org/10.1016/S0263-7863(98)00046-5.
Garvin, D. A. 1984. “What does ‘product quality’ really mean?” Harvard Univ. Fall 26 (1): 25–43.
Gransberg, D. D., and E. Windel. 2008. “Communicating design quality requirements for public sector design/build projects.” J. Manage. Eng. 24 (2): 105–110. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:2(105).
Hage, J. 1980. Theories of organizations: Form, process, and transformation. Hoboken, NJ: Wiley.
Hale, D. R., P. P. Shrestha, G. E. Gibson, and G. C. Migliaccio. 2009. “Empirical comparison of design/build and design/bid/build project delivery methods.” J. Constr. Eng. Manage. 135 (7): 579–587. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
Hatush, Z., and M. Skitmore. 1997. “Evaluating contractor prequalification data: Selection criteria and project success factors.” Constr. Manage. Econ. 15 (2): 129–147. https://doi.org/10.1080/01446199700000002.
Hellard, R. B. 1993. Total quality in construction projects: Achieving profitability with customer satisfaction. London: Thomas Telford.
Hendricks, K. B., and V. R. Singhal. 1996. “Quality awards and the market value of the firm: An empirical investigation.” Manage. Sci. 42 (3): 415–436. https://doi.org/10.1287/mnsc.42.3.415.
Heravi, A., V. Coffey, and B. Trigunarsyah. 2015. “Evaluating the level of stakeholder involvement during the project planning processes of building projects.” Int. J. Project Manage. 33 (5): 985–997. https://doi.org/10.1016/j.ijproman.2014.12.007.
Hsieh, T. Y., S. T. Lu, and C. H. Wu. 2004. “Statistical analysis of causes for change orders in metropolitan public works.” Int. J. Project Manage. 22 (8): 679–686. https://doi.org/10.1016/j.ijproman.2004.03.005.
Idrus, A., and M. Sodangi. 2010. “Framework for evaluating quality performance of contractors in Nigeria.” Int. J. Civ. Environ. Eng. 10 (1): 34–39.
Janssens, D. E. 1991. Design-build, explained. London: Macmillan Education.
King, B. 1989. Better designs in half the time: Implementing QFD quality function deployment in America. Methuen, MA: GOAL/QPC.
Konchar, M., and V. Sanvido. 1998. “Comparison of U.S. project delivery systems.” J. Constr. Eng. Manage. 124 (6): 435–444. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435).
Korkmaz, S., D. Riley, and M. Horman. 2010. “Piloting evaluation metrics for sustainable high-performance building project delivery.” J. Constr. Eng. Manage. 136 (8): 877–885. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000195.
Kumaraswamy, M. M. 1998. “Consequences of construction conflict: A Hong Kong perspective.” J. Manage. Eng. 14 (3): 66–74. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:3(66).
Lam, E. W., A. P. Chan, and D. W. Chan. 2008. “Determinants of successful design-build projects.” J. Constr. Eng. Manage. 134 (5): 333–341. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(333).
Lee, D.-E., and D. Arditi. 2006. “Total quality performance of design/build firms using quality function deployment.” J. Constr. Eng. Manage. 132 (1): 49–57. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(49).
Levy, S. M. 2006. Design-build project delivery: Managing the building process from proposal through construction. New York: McGraw-Hill.
Ling, F. Y. Y. 2004. “How project managers can better control the performance of design-build projects.” Int. J. Project Manage. 22 (6): 477–488. https://doi.org/10.1016/j.ijproman.2003.09.003.
Lumineau, F., and J. E. Henderson. 2012. “The influence of relational experience and contractual governance on the negotiation strategy in buyer-supplier disputes.” J. Oper. Manage. 30 (5): 382–395. https://doi.org/10.1016/j.jom.2012.03.005.
Mallon, J., and D. Mulligan. 1993. “Quality function deployment: A system for meeting customers’ needs.” J. Constr. Eng. Manage. 119 (3): 516–531. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:3(516).
Marcus, A. A. 1981. “Policy uncertainty and technological innovation.” Acad. Manage. Rev. 6 (3): 443–448. https://doi.org/https://doi.org/10.5465/amr.1981.4285783.
Migliaccio, G., G. Gibson, and J. O’Connor. 2009. “Procurement of design-build services: Two-phase selection for highway projects.” J. Manage. Eng. 25 (1): 29–39. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:1(29).
Mogaibel, H. 1999. Project delivery systems of mining projects. Dhahran, Saudi Arabia: King Fahd Univ. of Petroleum and Minerals.
Molenaar, K. R., and A. D. Songer. 1998. “Model for public sector design-build project selection.” J. Constr. Eng. Manage. 124 (6): 467–479. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(467).
Molenaar, K. R., A. D. Songer, and M. Barash. 1999. “Public-sector design/build evolution and performance.” J. Manage. Eng. 15 (2): 54–62. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(54).
Murphy, M. E., R. Perera, and S. Heaney. 2008. “Building design innovation: Expansion of classification linkages through case study analysis.” J. Eng. Des. Technol. 6 (2): 99–111. https://doi.org/10.1108/17260530810891252.
Musawir, A. U., C. E. M. Serra, O. Zwikael, and I. Ali. 2017. “Project governance, benefit management, and project success: Towards a framework for supporting organizational strategy implementation.” Int. J. Project Manage. 35 (8): 1658–1672. https://doi.org/10.1016/j.ijproman.2017.07.007.
Ndekugri, I., and A. Turner. 1994. “Building procurement by design and build approach.” J. Constr. Eng. Manage. 120 (2): 243–256. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(243).
Ngacho, C., and D. Das. 2014. “A performance evaluation framework of development projects: An empirical study of constituency development fund (CDF) construction projects in Kenya.” Int. J. Project Manage. 32 (3): 492–507. https://doi.org/10.1016/j.ijproman.2013.07.005.
Park, J., and Y. H. Kwak. 2017. “Design-bid-build (DBB) vs. design-build (DB) in the U.S. public transportation projects: The choice and consequences.” Int. J. Project Manage. 35 (3): 280–295. https://doi.org/10.1016/j.ijproman.2016.10.013.
Park, M., S.-H. Ji, H.-S. Lee, and W. Kim. 2009. “Strategies for design-build in Korea using system dynamics modeling.” J. Constr. Eng. Manage. 135 (11): 1125–1137. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000095.
Plebankiewicz, E. 2010. “Construction contractor prequalification from Polish clients’ perspective.” J. Civ. Eng. Manage. 16 (1): 57–64. https://doi.org/10.3846/jcem.2010.05.
Podsakoff, P. M., S. B. MacKenzie, J.-Y. Lee, and N. P. Podsakoff. 2003. “Common method biases in behavioral research: A critical review of the literature and recommended remedies.” J. Appl. Psychol. 88 (5): 879–903. https://doi.org/10.1037/0021-9010.88.5.879.
Preece, C., and S. Tarawneh. 1997. “Why are design and build clients unhappy?” Constr. Manage. 3 (7): 24–25.
Ramsey, D., M. E. Asmar, and G. E. Gibson. 2016. “Quantitative performance assessment of single-step versus two-step design-build procurement.” J. Constr. Eng. Manage. 142 (9): 04016033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001145.
Robbins, S. P. 2009. Organizational behavior, 13/E. NJ: Pearson.
Robinson, J. P., P. R. Shaver, and L. S. Wrightsman. 2013. Measures of personality and social psychological attitudes: Measures of social psychological attitudes. Cambridge, MA: Academic Press.
Scott, S. 2006. Best-value procurement methods for highway construction projects. Washington, DC: Transportation Research Board.
Scott, S. G., and R. A. Bruce. 1994. “Determinants of innovative behavior: A path model of individual innovation in the workplace.” Acad. Manage. J. 37 (3): 580–607. https://doi.org/10.5465/256701.
Shane, J. S., S. M. Bogus, and K. R. Molenaar. 2013. “Municipal water/wastewater project delivery performance comparison.” J. Manage. Eng. 29 (3): 251–258. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000139.
Shrestha, P. P., and J. D. Fernane. 2016. “Performance of design-build and design-bid-build projects for public universities.” J. Constr. Eng. Manage. 143 (3): 04016101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001241.
Slaughter, E. S. 1998. “Models of construction innovation.” J. Constr. Eng. Manage. 124 (3): 226–231. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(226).
Slaughter, E. S. 2000. “Implementation of construction innovations.” Build. Res. Inf. 28 (1): 2–17. https://doi.org/10.1080/096132100369055.
Songer, A. D., and K. R. Molenaar. 1996. “Selecting design-build: Public and private sector owner attitudes.” J. Manage. Eng. 12 (6): 47–53. https://doi.org/10.1061/(ASCE)0742-597X(1996)12:6(47).
Sullivan, J., M. E. Asmar, J. Chalhoub, and H. Obeid. 2017. “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” J. Constr. Eng. Manage. 143 (6): 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282.
Tan, R. R., and Y.-G. Lu. 1995. “On the quality of construction engineering design projects: Criteria and impacting factors.” Int. J. Qual. Reliab. Manage. 12 (5): 18–37. https://doi.org/10.1108/02656719510089975.
Trigunarsyah, B. 2004. “A review of current practice in constructability improvement: Case studies on construction projects in Indonesia.” Constr. Manage. Econ. 22 (6): 567–580. https://doi.org/10.1080/0144619042000202870.
Wardani, M. A. E., J. I. Messner, and M. J. Horman. 2006. “Comparing procurement methods for design-build projects.” J. Constr. Eng. Manage. 132 (3): 230–238. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230).
Williamson, O. E., and D. C. Mueller. 1986. “The economic institutions of capitalism.” In Antitrust Bulletin. New York: The Free Press.
Wu, C. H., T. Y. Hsieh, and W. L. Cheng. 2005. “Statistical analysis of causes for design change in highway construction on Taiwan.” Int. J. Project Manage. 23 (7): 554–563. https://doi.org/10.1016/j.ijproman.2004.07.010.
Xia, B., and A. Chan. 2008. “Review of the design-build market in the People’s Republic of China.” J. Constr. Procurement 14 (2): 108–117.
Xia, B., A. Chan, K. Molenaar, and M. Skitmore. 2012. “Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach.” J. Constr. Eng. Manage. 138 (9): 1017–1022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000522.
Yana, A. A. G. A., H. A. Rusdhi, and M. A. Wibowo. 2015. “Analysis of factors affecting design changes in construction project with partial least square (PLS).” Procedia Eng. 125: 40–45. https://doi.org/10.1016/j.proeng.2015.11.007.
Yasamis, F., D. Arditi, and J. Mohammadi. 2002. “Assessing contractor quality performance.” Constr. Manage. Econ. 20 (3): 211–223. https://doi.org/10.1080/01446190110113693.
Yates, J. K., and L. C. Battersby. 2003. “Master builder project delivery system and designer construction knowledge.” J. Constr. Eng. Manage. 129 (6): 635–644. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(635).
Yu, T., G. Q. Shen, and Q. Shi. 2017. “Comparing the performance quality of design-bid-build and design-build delivery methods.” J. Constr. Eng. Manage. 143 (4): 04016111. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001262.
Zaltman, G., R. Duncan, and J. Holbek. 1973. Innovations and organizations. Hoboken, NJ: Wiley.
Zhou, J., and J. M. George. 2001. “When job dissatisfaction leads to creativity: Encouraging the expression of voice.” Acad. Manage. J. 44 (4): 682–696. https://doi.org/10.5465/3069410.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 145Issue 1January 2019

History

Received: Jan 17, 2018
Accepted: Jul 12, 2018
Published online: Nov 10, 2018
Published in print: Jan 1, 2019
Discussion open until: Apr 10, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Shuibo Zhang [email protected]
Professor, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China. Email: [email protected]
Postgraduate, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China. Email: [email protected]
Ying Gao, Ph.D. [email protected]
Assistant Professor, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China. Email: [email protected]
Ph.D. Candidate, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China (corresponding author). Email: [email protected]; [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share