Abstract

On-site transport is common in most construction projects. Confined by site sizes and construction schedules, many construction tasks are implemented simultaneously within limited spaces; therefore, the paths necessary for the transport of site objects are likely to be obstructed. To solve this problem, in this research, we propose a cell-based methodology for path obstruction detection and conduct a test with a prototype to determine its accuracy and time requirements. The results show that, by choosing a proper cell step, the method can determine whether a site object’s transport path is obstructed and can generate a suitable path if there is no path obstruction; otherwise, the potential obstacles can be listed and ranked based on their distances to the site object. The proposed method has the potential to support path obstruction detection in four-dimensional (4D) building information modeling (BIM) to improve the implementation of construction plans.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated by the authors or analyzed during the study are available at: https://pan.baidu.com/s/1lFCfgeok6h2y3VtWmBEMAw. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

The research is funded by The Fundamental Research Fund for the Central University (No: 2016-JL-006); the Gantt chart control was developed by Jake See (available at http://ganttchart.codeplex.com). In addition, two anonymous experts gave their valuable suggestions to this paper. The authors expresses their gratitude to all of them.

References

Akinci, B., M. Fischer, and J. Kunz. 2002. “Automated generation of workspaces required by construction activities.” J. Constr. Eng. Manage. 128 (4): 306–315. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(306).
Alkoc, E., and F. Erbatur. 1998. “SITE EXPERT: A prototype knowledge-based expert system.” Eng. Constr. Archit. Manage. 5 (3): 238–251. https://doi.org/10.1108/eb021078.
Allen, C., and J. Smallwood. 2008. “Improving construction planning through 4D planning.” J. Eng. Des. Technol. 6 (1): 7–20. https://doi.org/10.1108/17260530810863307.
Andayesh, M., and F. Sadeghpour. 2014. “A comparative study of different approaches for finding the shortest path on construction sites.” Proc. Eng. 85: 33–41. https://doi.org/10.1016/j.proeng.2014.10.526.
Barlish, K., and K. Sullivan. 2012. “How to measure the benefits of BIM: A case study approach.” Autom. Constr. 24: 149–159. https://doi.org/10.1016/j.autcon.2012.02.008.
Benjaoran, V., and S. Bhokha. 2009. “Enhancing visualization of 4D CAD model compared to conventional methods.” Eng. Constr. Archit. Manage. 16 (4): 392–408. https://doi.org/10.1108/09699980910970860.
Chavada, R. D., M. Kassem, N. N. Dawood, and K. K. Naji. 2012. “A framework for construction workspace management: A serious game engine approach.” In Proc., Int. Conf. on Computing in Civil Engineering, 57–64. Reston, VA: ASCE.
Chen, A. Y., and T. Huang. 2015. “Toward BIM-enabled decision making for in-building response missions.” IEEE Trans. Intell. Transp. Syst. 16 (5): 2765–2773. https://doi.org/10.1109/TITS.2015.2422138.
Choi, B., H.-S. Lee, M. Park, Y. K. Cho, and H. Kim. 2014. “Framework for work-space planning using four-dimensional BIM in construction projects.” J. Constr. Eng. Manage. 140 (9): 04014041. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000885.
Ding, L., Y. Zhou, and B. Akinci. 2014. “Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD.” Autom. Constr. 46: 82–93. https://doi.org/10.1016/j.autcon.2014.04.009.
Elmahdi, A., I.-C. Wu, and H.-J. Bargstädt. 2011. “4D grid-based simulation framework for facilitating workspace management.” In Proc., 11th Int. Conf. on Construction Applications of Virtual Reality, 402–412. Weimar, Germany: Bauhaus Universität Weimar.
ElNimr, A., M. Fagiar, and Y. Mohamed. 2016. “Two-way integration of 3D visualization and discrete event simulation for modeling mobile crane movement under dynamically changing site layout.” Autom. Constr. 68: 235–248. https://doi.org/10.1016/j.autcon.2016.05.013.
Games, R. B. 2016. “Introduction to A*.” Accessed October 3, 2017. http://www.redblobgames.com/pathfinding/a-star/introduction.html.
Hamieh, A., D. Deneux, and C. Tahon. 2017. “BiMov: BIM-based indoor path planning.” In Advances on mechanics, design engineering and manufacturing, edited by B. Eynard, V. Nigrelli, S. M. Oliveri, G. Peris-Fajarnes, and S. Rizzuti, 889–899. Cham, Switzerland: Springer.
Hsu, J. J., and J. C. Chu. 2014. “Long-term congestion anticipation and aversion in pedestrian simulation using floor field cellular automata.” Transp. Res. Part C Emerg. Technol. 48: 195–211. https://doi.org/10.1016/j.trc.2014.08.021.
Kim, K., and J. Teizer. 2014. “Automatic design and planning of scaffolding systems using building information modeling.” Adv. Eng. Inf. 28 (1): 66–80. https://doi.org/10.1016/j.aei.2013.12.002.
Kneidl, A., D. Hartmann, and A. Borrmann. 2013. “A hybrid multi-scale approach for simulation of pedestrian dynamics.” Transp. Res. Part C Emerg. Technol. 37 (3): 223–237. https://doi.org/10.1016/j.trc.2013.03.005.
Lei, Z., H. Taghaddos, U. Hermann, and M. Al-Hussein. 2013. “A methodology for mobile crane lift path checking in heavy industrial projects.” Autom. Constr. 31: 41–53. https://doi.org/10.1016/j.autcon.2012.11.042.
Li, H., G. Chan, M. Skitmore, and T. Huang. 2015. “A 4D automatic simulation tool for construction resource planning: A case study.” Eng. Constr. Archit. Manage. 22 (5): 536–550. https://doi.org/10.1108/ECAM-07-2014-0093.
Lin, Y.-H., Y.-S. Liu, G. Gao, X.-G. Han, C.-Y. Lai, and M. Gu. 2013. “The IFC-based path planning for 3D indoor spaces.” Adv. Eng. Inf. 27 (2): 189–205. https://doi.org/10.1016/j.aei.2012.10.001.
Naoum, S., and J. O. N. Hackman. 1996. “Do site managers and the head office perceive productivity factors differently?” Eng. Constr. Archit. Manage. 3 (1–2): 147–160. https://doi.org/10.1108/eb021028.
NIBS (National Institute of Building Science). 2007. “National building information modeling standard version 1. Part 1: Overview, principles and methodologies.” Accessed February 8, 2018. https://pan.baidu.com/s/1LU3tP8fm7EmX1EvIoPomOw.
Park, M., Y. Yang, H.-S. Lee, and S. Han. 2011. “Floor-level construction material layout planning model considering actual travel path.” J. Constr. Eng. Manage. 138 (7): 10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000493.
Soltani, A. R., H. Tawfik, J. Y. Goulermas, and T. Fernando. 2002. “Path planning in construction sites: Performance evaluation of the Dijkstra, A∗, and GA search algorithms.” Adv. Eng. Inf. 16 (4): 291–303. https://doi.org/10.1016/S1474-0346(03)00018-1.
Su, X., and H. Cai. 2014. “Life cycle approach to construction workspace modeling and planning.” J. Constr. Eng. Manage. 140 (7): 04014019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000855.
Tan, Y., Y. Song, X. Liu, X. Wang, and J. C. P. Cheng. 2017. “A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms.” Autom. Constr. 79: 19–30. https://doi.org/10.1016/j.autcon.2017.02.008.
Tantisevi, K., and B. Akinci. 2009. “Transformation of a 4D product and process model to generate motion of mobile cranes.” Autom. Constr. 18 (4): 458–468. https://doi.org/10.1016/j.autcon.2008.10.008.
Wang, H. J., J. P. Zhang, K. W. Chau, and M. Anson. 2004. “4D dynamic management for construction planning and resource utilization.” Autom. Constr. 13 (5): 575–589. https://doi.org/10.1016/j.autcon.2004.04.003.
Yuan, W., and M. Schneider. 2011. “3D indoor route planning for arbitrary-shape objects.” In Proc., Int. Conf. on Database Systems for Advanced Applications, 120–131. New York: Springer.
Zhang, C., A. Hammad, T. M. Zayed, G. Wainer, and H. Pang. 2007. “Cell-based representation and analysis of spatial resources in construction simulation.” Autom. Constr. 16 (4): 436–448. https://doi.org/10.1016/j.autcon.2006.07.009.
Zhang, S., J. Teizer, N. Pradhananga, and C. M. Eastman. 2015. “Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning.” Autom. Constr. 60: 74–86. https://doi.org/10.1016/j.autcon.2015.09.009.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 145Issue 3March 2019

History

Received: Dec 13, 2017
Accepted: Jul 5, 2018
Published online: Dec 26, 2018
Published in print: Mar 1, 2019
Discussion open until: May 26, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Qiankun Wang, Ph.D.
Professor, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan 430070, China.
Ph.D. Candidate, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan 430070, China (corresponding author). Email: [email protected]; [email protected]
Kwabena Mintah, Ph.D.
Associate Lecturer, School of Property, Construction, and Project Management, Royal Melbourne Institute of Technology Univ., Melbourne 3000, Australia.
Qianyao Li
Ph.D. Candidate, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan 430070, China.
Tingting Mei
Ph.D. Candidate, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan 430070, China.
Peng Li
Ph.D. Candidate, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan 430070, China.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share