Site Amenities and Workers’ Welfare Factors Affecting Workforce Productivity in Indian Construction Projects
Publication: Journal of Construction Engineering and Management
Volume 144, Issue 11
Abstract
The issue of low productivity has remained a very serious and chronic problem in construction projects. While previous studies have identified several factors that cause low construction productivity, factors related to site amenities and labor welfare measures have not received enough attention. This paper encompasses factors related to site amenities and labor welfare that directly or indirectly affect productivity of the construction workforce. Factor analysis conducted on 151 responses associated with 38 identified site amenities and labor welfare attributes identified eight factors: (1) health and medical provisions, (2) site services, (3) labor camp facilities, (4) hygiene and sanitation, (5) leave and benefits, (6) social welfare and employment policies, (7) remuneration, and (8) accommodation facilities. One-way ANOVA was performed to compare the views of the engineers and supervisors. Furthermore, data were collected from five different construction sites to assess the quality of the prevailing conditions of site amenities and labor welfare and its implications for labor productivity. It was found that the major reasons leading to poor quality of site amenities and labor welfare are related to improper letters of intent (LOIs) and delays in land acquisition for setting up proper labor camps. The outcome of this study is likely to direct more research and organizational efforts in this direction, especially in the context of developing countries such as India, where work and living conditions of construction workers have yet to receive the required attention of both policymakers and project stakeholders.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.
References
Abrey, M., and J. J. Smallwood. 2014. “The effects of unsatisfactory working conditions on productivity in the construction industry.” Procedia Eng. 85: 3–9. https://doi.org/10.1016/j.proeng.2014.10.522.
CIDC (Construction Industry Development Council). 2017. “About us.” Accessed September 15, 2017. http://www.cidc.in/new/aboutus.html.
Dai, J., P. M. Goodrum, and W. F. Maloney. 2007. “Analysis of craft workers’ and foremen’s perceptions of the factors affecting construction labour productivity.” Constr. Manage. Econ. 25 (11): 1139–1152. https://doi.org/10.1080/01446190701598681.
Dillon, W. R., and M. Goldstein. 1984. Multivariate analysis. New York: Wiley.
Durdyev, S., and J. Mbachu. 2011. “On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures.” Constr. Econ. Build. 11 (3): 18–33. https://doi.org/10.5130/ajceb.v11i3.2120.
El-Gohary, K. M., and R. F. Aziz. 2014. “Factors influencing construction labor productivity in Egypt.” J. Manage. Eng. 30 (1): 1–9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168.
Enshassi, A., S. Mohamed, Z. A. Mustafa, and P. E. Mayer. 2007. “Factors affecting labour productivity in building projects in the Gaza Strip.” J. Civ. Eng. Manage. 13 (4): 245–254. https://doi.org/10.1080/13923730.2007.9636444.
Field, A. 2018. Discovering statistics using IBM SPSS statistics. 5th ed. London: SAGE.
Ghoddousi, P., and M. R. Hosseini. 2012. “A survey of the factors affecting the productivity of construction projects in Iran.” Technol. Econ. Dev. Econ. 18 (1): 99–116. https://doi.org/10.3846/20294913.2012.661203.
Ghoddousi, P., O. Poorafshar, N. Chileshe, and M. R. Hosseini. 2015. “Labour productivity in Iranian construction projects: Perceptions of chief executive officers.” Int. J. Productivity Perform. Manage. 64 (6): 811–830. https://doi.org/10.1108/IJPPM-10-2013-0169.
Global Construction Review. 2017. “Qatar’s World Cup workers ‘can work 148 days without a break.’” Accessed September 15, 2017. http://www.globalconstructionreview.com/news/qatars-world-cup-workers-ca7n-wo7rk-148-d7ays/.
Hasan, A., and K. N. Jha. 2013. “Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.” Int. J. Inj. Control Saf. Promotion 20 (1): 3–12. https://doi.org/10.1080/17457300.2011.648676.
Hasan, A., and K. N. Jha. 2016. “Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India.” J. Constr. Eng. Manage. 142 (2): 04015064. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001048.
Hinze, J. W. 1999. Construction planning and scheduling. Upper Saddle River, NJ: Prentice-Hall.
Hiyassat, M. A., M. A. Hiyari, and G. J. Sweis. 2016. “Factors affecting construction labour productivity: A case study of Jordan.” Int. J. Constr. Manage. 16 (2): 138–149. https://doi.org/10.1080/15623599.2016.1142266.
Hughes, R., and D. Thorpe. 2014. “A review of enabling factors in construction industry productivity in an Australian environment.” Constr. Innovation 14 (2): 210–228. https://doi.org/10.1108/CI-03-2013-0016.
Ibrahim, M. 2013. “Contractors perspective toward factors affecting labor productivity in building construction.” Eng. Constr. Archit. Manage. 20 (5): 446–460. https://doi.org/10.1108/ECAM-08-2011-0074.
Ismail, Z., S. Doostdar, and Z. Harun. 2012. “Factors influencing the implementation of a safety management system for construction sites.” Saf. Sci. 50 (3): 418–423. https://doi.org/10.1016/j.ssci.2011.10.001.
Jang, H., K. Kim, J. Kim, and J. Kim. 2011. “Labour productivity model for reinforced concrete construction projects.” Constr. Innovation 11 (1): 92–113. https://doi.org/10.1108/14714171111104655.
Jarkas, A. M. 2015. “Factors influencing labour productivity in Bahrain’s construction industry.” Int. J. Constr. Manage. 15 (1): 94–108. https://doi.org/10.1080/15623599.2015.1012143.
Jarkas, A. M., R. A. Al Balushi, and P. K. Raveendranath. 2015. “Determinants of construction labour productivity in Oman.” Int. J. Constr. Manage. 15 (4): 332–344. https://doi.org/10.1080/15623599.2015.1094849.
Jarkas, A. M., and C. G. Bitar. 2012. “Factors affecting construction labor productivity in Kuwait.” J. Constr. Eng. Manage. 138 (7): 811–820. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000501.
Jarkas, A. M., and M. Radosavljevic. 2013. “Motivational factors impacting the productivity of construction master craftsmen in Kuwait.” J. Manage. Eng. 29 (4): 446–454. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000160.
Jarkas, A. M., M. Radosavljevic, and L. Wuyi. 2014. “Prominent demotivational factors influencing the productivity of construction project managers in Qatar.” Int. J. Productivity Perform. Manage. 63 (8): 1070–1090. https://doi.org/10.1108/IJPPM-11-2013-0187.
Jewkes, M., and L. Delgadillo. 2010. “Weaknesses of housing affordability indices used by practitioners.” J. Financial Counseling Plann. 21 (1): 43–52.
Kazaz, A., E. Manisali, and S. Ulubeyli. 2008. “Effect of basic motivational factors on construction workforce productivity in Turkey.” J. Civ. Eng. Manage. 14 (2): 95–106. https://doi.org/10.3846/1392-3730.2008.14.4.
Kazaz, A., and S. Ulubeyli. 2007. “Drivers of productivity among construction workers: A study in a developing country.” Build. Environ. 42 (5): 2132–2140. https://doi.org/10.1016/j.buildenv.2006.04.020.
Loganathan, S., and S. N. Kalidindi. 2016. “Absenteeism and turnover of migrant construction workers in Indian projects—A survey-based study.” In Proc., 2016 Construction Research Conf., 1793–1802. Reston, VA: ASCE.
Loosemore, M., A. Dainty, and H. Lingard. 2003. Human resource management in construction projects: Strategic and operational approaches. New York: SPON.
Makulsawatudom, A., M. Emsley, and K. Sinthawanarong. 2004. “Critical factors influencing construction productivity in Thailand.” J. KMITNB 14 (3): 1–6.
Maslow, A. H. 1970. “A theory of human motivation.” In Management and motivation, edited by V. H. Vroom, and E. L. Deci, 27–41. Harmondsworth, UK: Penguin.
McKenzie, K. I., and F. C. Harris. 1984. “Money the only motivator?” Build. Technol. Manage. 22: 25–29.
Meerding, W. J., W. IJzelenberg, M. A. Koopmanschap, J. L. Severens, and A. Burdorf. 2005. “Health problems lead to considerable productivity loss at work among workers with high physical load jobs.” J. Clin. Epidemiol. 58 (5): 517–523. https://doi.org/10.1016/j.jclinepi.2004.06.016.
Naoum, S. G. 2016. “Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey.” Int. J. Productivity Perform. Manage. 65 (3): 401–421. https://doi.org/10.1108/IJPPM-03-2015-0045.
Olomolaiye, P. O., and S. O. Ogunlana. 1988. “A survey of construction operative motivation on selected sites in Nigeria.” Build. Environ. 23 (3): 179–185. https://doi.org/10.1016/0360-1323(88)90002-9.
Prüss, A., D. Kay, L. Fewtrell, and J. Bartram. 2002. “Estimating the burden of disease from water, sanitation, and hygiene at a global level.” Environ. Health Perspect. 110 (5): 537–542. https://doi.org/10.1289/ehp.02110537.
Rahman, M. M., and M. M. Kumaraswamy. 2008. “Relational contracting and teambuilding: Assessing potential contractual and non-contractual incentives.” J. Manage. Eng. 24 (1): 48–63. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:1(48).
Ram, P., and B. Needham. 2016. “The provision of affordable housing in India: Are commercial developers interested?” Habitat Int. 55: 100–108. https://doi.org/10.1016/j.habitatint.2016.03.002.
Rojas, E. M., and P. Aramvareekul. 2003. “Labor productivity drivers and opportunities in the construction industry.” J. Manage. Eng. 19 (2): 78–82. https://doi.org/10.1061/(ASCE)0742-597X(2003)19:2(78).
Saris, W. E., and I. N. Gallhofer. 2014. Design, evaluation, and analysis of questionnaires for survey research. 2nd ed. Hoboken, NJ: Wiley.
Teo, E. A. L., F. Y. Y. Ling, and A. F. W. Chong. 2005. “Framework for project managers to manage construction safety.” Int. J. Project Manage. 23 (4): 329–341. https://doi.org/10.1016/j.ijproman.2004.09.001.
Thomas, A. V., and J. Sudhakumar. 2013. “Critical analysis of the key factors affecting construction labour productivity—An Indian perspective.” Int. J. Constr. Manage. 13 (4): 103–125. https://doi.org/10.1080/15623599.2013.10878231.
Wang, T., Y. Li, L. Zhang, and G. Li. 2016. “Case study of integrated prefab accommodations system for migrant on-site construction workers in China.” J. Prof. Issues Eng. Educ. Pract. 142 (4): 05016005. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000288.
WorkSafe Victoria. 2008. “Amenities on housing sites: OH&S guidance for house builders.” Accessed April 1, 2018. https://prod.wsvdigital.com.au/sites/default/files/2018-06/ISBN-Amenities-on-housing-sites-OHS-guidance-for-house-builders-2008-02_0.pdf.
Zakeri, M., P. Olomolaiye, G. D. Holt, and F. C. Harris. 1997. “Factors affecting the motivation of Iranian construction operatives.” Build. Environ. 32 (2): 161–166. https://doi.org/10.1016/S0360-1323(96)00044-3.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Jan 11, 2018
Accepted: Jun 4, 2018
Published online: Aug 31, 2018
Published in print: Nov 1, 2018
Discussion open until: Jan 31, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.