Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices
Publication: Journal of Construction Engineering and Management
Volume 144, Issue 9
Abstract
In modern architecture, engineering, and construction (AEC) practices, the Iron Triangle of schedule, cost, and quality remains the key measurement to gauge project success. Existing tools do not work well at monitoring all three measures of the Iron Triangle, resulting in a huge cost and time overrun, and the existing functionality of Earned Value Management (EVM) covers only time and cost, but not quality. Thus, this study aims to develop a quality extension to EVM that caters to quality measurement. Firstly, this research introduced a measurable index and developed a new quality assessment method named the Quality Performed Assessment Method (QPAM) through a quantitative approach. Subsequently, a new tool named Earned Quality Value Management (EQVM) was developed to manage the Iron Triangle in a single reporting setting. The QPAM and EQVM were validated through three tiers of validation processes, namely, a pilot run to test its functionality in a conceptual model, a scenario analysis to identify its sensitivity, and a real case study to validate its functionality. QPAM and EQVM performed satisfactorily in systematic reporting and monitoring enhancement. This single reporting tool enables project stakeholders to make cross-comparisons and gain more insight into the project portfolio. Academically, this research minimized the gap among Iron Triangle management, quality management, and project portfolio management. Practically, this research developed a method for Iron Triangle control on a daily basis for both a single project and a portfolio.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
All data generated or analyzed during the study are included in the published paper. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.
References
Acebes, F., J. Pajares, J. Galan, and A. Lopez-Paredes. 2013. “Beyond earned value management: A graphical framework for integrated cost, schedule and risk monitoring.” Procedia Soc. Behav. Sci. 74: 181–189. https://doi.org/10.1016/j.sbspro.2013.03.027.
Ahmed, S. M., R. T. Aoieng, S. L. Tang, and X. M. Zheng. 2005. “A comparison of quality management systems in the construction industries of Hong Kong and the USA.” Int. J. Qual. Reliab. Manage. 22 (2): 149–161. https://doi.org/10.1108/02656710510577215.
Alzahrani, J. I., and M. W. Emsley. 2013. “The impact of contractors' attributes on construction project success: A post construction evaluation.” Int. J. Project Manage. 31 (2): 313–322. https://doi.org/10.1016/j.ijproman.2012.06.006.
Anbari, F. T. 2003. “Earned value project management method and extensions.” Project Manage. J. 34 (4): 12–23.
Arditi, D., and H. M. Gunaydin. 1997. “Total quality management in the construction process.” Int. J. Project Manage. 15 (4): 235–243. https://doi.org/10.1016/S0263-7863(96)00076-2.
Association for Project Management. 2008. Earned value management: APM guidelines. Wycombe, UK: APA.
Basu, R. 2014. “Managing quality in projects: An empirical study.” Int. J. Project Manage. 32 (1): 178–187. https://doi.org/10.1016/j.ijproman.2013.02.003.
Batselier, J., and M. Vanhoucke. 2017. “Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting.” Int. J. Project Manage. 35 (1): 28–43. https://doi.org/10.1016/j.ijproman.2016.10.003.
BCA (Building Construction Authority Singapore). 2012. The BCA construction quality assessment system (CONQUAS). Singapore: Building and Construction Authority.
Beringer, C., D. Jonas, and A. Kock. 2013. “Behaviour of internal stakeholders in project portfolio management and its impact on success.” Int. J. Project Manage. 31 (6): 830–846. https://doi.org/10.1016/j.ijproman.2012.11.006.
Brown, A. K., and N. L. Hyer. 2010. Managing project: A team based approach. New York: McGraw-Hill.
Cao, Q., and J. J. Hoffman. 2011. “A case study approach for developing a project performance evaluation system.” Int. J. Project Manage. 29 (2): 155–164. https://doi.org/10.1016/j.ijproman.2010.02.010.
Chen, H., W. Chen, and Y. L. Lin. 2016. “Earned value project management: Improving the predictive power of planned value.” Int. J. Project Manage. 34 (1): 22–29. https://doi.org/10.1016/j.ijproman.2015.09.008.
Claude, B., and H. Brian. 2008. “Project management practice, generic or contextual: A reality check.” Project Manage. J. 39 (1): 16–33. https://doi.org/10.1002/pmj.20033.
Cleland, D. I., and L. R. Ireland. 2007. Project management: strategic design and implementations. New York: McGraw-Hill Inn.
Department of Defense. 2012. Earned value management system (EVMS) program analysis pamphlet (PAP). Washington, DC: Defence Contract Management Agency.
Ede, A. N. 2011. “Measures to reduce the high incidence of structural failures in Nigeria.” J. Sustainable Dev. Africa 13 (1): 153–161.
Florence, Y. Y. L. 2005. “Models for predicting quality of building projects.” Eng. Constr. Archit. Manage. 12 (1): 6–20. https://doi.org/10.1108/09699980510576862.
Hamzah, A. R., C. Wang, and N. Muhammad. 2011. “Project performance monitoring methods used in Malaysia and perspectives of introducing EVA as a standard approach.” J. Civ. Eng. Manage. 17 (3): 445–455. https://doi.org/10.3846/13923730.2011.598331.
Haponava, T., and S. Al-Jibouri. 2010. “Influence of process performance during the construction stage on achieving end-project goals.” Constr. Manage. Econ. 28 (8): 853–869. https://doi.org/10.1080/01446193.2010.487535.
Haverila, M. J., and K. Fehr. 2016. “The impact of product superiority on customer satisfaction in project management.” Int. J. Project Manage. 34 (4): 570–583. https://doi.org/10.1016/j.ijproman.2016.02.007.
Ika, L. A. 2009. “Project success as a topic in project management journals.” Project Manage. J. 40 (4): 6–19. https://doi.org/10.1002/pmj.20137.
Jacob, D., and M. Kane. 2004. “Forecasting schedule completion using earned value metrics? Revisited.” The Measurable News Summer 1: 11–17.
Jafari, A., and P. E. D. Love. 2013. “Quality costs in construction: Case of Qom Monorail project in Iran.” J. Constr. Eng. Manage. 139 (9): 1244–1249. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000704.
Jafari, A., and S. Rodchua. 2013. “Survey research on quality costs and problems in the construction environment.” Total Qual. Manage. Bus. Excellence 25 (3–4): 222–234. https://doi.org/10.1080/14783363.2013.824715.
Kam, C. W., and S. L. Tang. 1997. “Development and implementation of quality assurance in public construction works in Singapore and Hong Kong.” Int. J. Qual. Reliab. Manage. 14 (9): 909–928. https://doi.org/10.1108/02656719710186830.
Kam, K. J., A. Hilmy, and A. Hamid. 2012. “The relationship between motives and benefits on adopting QLASSIC–CIS 7:2006 in Malaysia construction industry.” Int. J. Qual. Res. 6 (4): 321–332.
Kamath, A., and R. Jayaraman. 2013. “CONQUAS systems standard for high quality project management.” Int. J. Manage. 1: 51–67.
Kerkhove, L. P., and M. Vanhoucke. 2017. “Extensions of earned value management: Using the earned incentive metric to improve signal quality.” Int. J. Project Manage. 35 (2): 148–168. https://doi.org/10.1016/j.ijproman.2016.10.014.
Kim, E. H., W. G. Well, Jr., and M. R. Duffey. 2003. “A model for effective implementation of Earned Value Management methodology.” Int. J. Project Manage. 21 (5): 375–382. https://doi.org/10.1016/S0263-7863(02)00049-2.
Larson, E. W., and C. F. Gray. 2011. Project management: The managerial process. New York: McGraw Hill.
Lipke, W., O. Zwikael, K. Henderson, and F. Anbari. 2009. “Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes.” Int. J. Project Manage. 27 (4): 400–407. https://doi.org/10.1016/j.ijproman.2008.02.009.
Lipke, W., O. Zwikael, K. Henderson, and F. Anbari. 2009. “Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes.” Int. J. Project Manage. 27 (4): 400–407. https://doi.org/10.1016/j.ijproman.2008.02.009.
Low, S. P., B. K. Tan, and A. A. L. Allen. 1999. “Effectiveness of ISO 9000 in raising construction quality standard: Some empirical evidence using CONQUAS scores.” Struct. Surv. 17: 89–108.
Naderpour, A., and M. Mofid. 2011. “Improving construction management of an educational center by applying earned value technique.” Procedia Eng. 14: 1945–1952. https://doi.org/10.1016/j.proeng.2011.07.244.
Newell, M. W. 2005. Preparing for the project management professional certification exam. New York: American Management Association.
Nicholas, J. M., and H. Steyn. 2017. Project management for engineering, business and technology. 5th ed. New York: Routledge.
PMI (Project Management Institute). 2005. Practice standard for earned value management. Newtown Square, PA: Project Management Institute.
PMI (Project Management Institute). 2013. A guide to the project management body of knowledge. Newtown Square, PA: Project Management Institute.
Serrador, P., and R. Turner. 2015. “The relationship between project success and project efficiency.” Project Manage. J. 46 (1): 30–39. https://doi.org/10.1002/pmj.21468.
Shenhar, A. J., D. Dvir, O. Levy, and A. C. Maltz. 2001. “Project success: A multidimensional strategic concept.” J. Long Range Plann. 34 (6): 699–725. https://doi.org/10.1016/S0024-6301(01)00097-8.
Silvius, A. J. G., M. Kampinga, S. Paniagua, and H. Mooi. 2017. “Considering sustainability in project management decision making: An investigation using Q-methodology.” Int. J. Project Manage. 35 (6): 1133–1150.
Tam, C. M., Z. M. Deng, S. X. Zeng, and C. S. Ho. 2000. “Performance assessment scoring system of public housing construction for quality improvement in Hong Kong.” Int. J. Qual. Reliab. Manage. 17 (4/5): 467–478. https://doi.org/10.1108/02656710010298535.
Vandevoorde, S., and M. Vanhoucke. 2006. “A comparison of different project duration forecasting methods using earned value metrics.” Int. J. Project Manage. 24: 289–302. https://doi.org/10.1016/j.ijproman.2005.10.004.
Warburton, R. D. H. 2011. “A time-dependent earned value model for software project.” Int. J. Project Manage. 29 (8): 1082–1090. https://doi.org/10.1016/j.ijproman.2011.02.008.
White, D., and J. Fortune. 2002. “Current practice in project management-an empirical study.” Int. J. Project Manage. 20 (1): 1–11. https://doi.org/10.1016/S0263-7863(00)00029-6.
Wood, D. A. 2017. “High-level integrated deterministic, stochastic and fuzzy cost-duration analysis aids project planning and monitoring, focusing on uncertainties and earned value metrics.” J. Nat. Gas Sci. Eng. 37: 303–326. https://doi.org/10.1016/j.jngse.2016.11.045.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Nov 30, 2017
Accepted: Mar 7, 2018
Published online: Jun 22, 2018
Published in print: Sep 1, 2018
Discussion open until: Nov 22, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.