Abstract

Delivering building information modeling (BIM) requires a certain level of trust to make it more effective. However, the engineering, procurement, and construction (EPC) approach, which conventionally adopts transaction law, encourages each party to protect their legitimate interest. Consequently, EPC contracting parties operate within their own goals and procedures, in which trust is not a fundamental contracting strategy. In addition, distrust—which is commonly perceived as detrimental to the relationship—should receive more attention when examining the beneficial outcomes of the relationship. Contract research has emerged from focusing on the safeguarding of contract transactions and is currently moving toward coordination and contingency adaptability for its success. In this context, this paper proposes an integrative trust-based functional contracting model that describes how trust can enhance BIM performance in EPC projects. Thus, this paper contributes new knowledge of the proper use and harmonization of contract functions and provides significant insight for the construction industry to think beyond the traditional EPC contract setting for effective use of BIM.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data generated or analyzed during the study are included in the published paper. Information about the Journal’s data sharing policy can be found here: http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001263.

Acknowledgments

This research project is funded by the Australian Research Council (ARC) Linkage Project (LP140100873) and Discovery Project (DP170104612).

References

AIA (American Institute of Architects). 2013. Building information modelling and digital data exhibit. Washington, DC: AIA.
Aulakh, P. S., M. Kotabe, and A. Sahay. 1996. “Trust and performance in cross-border marketing partnerships: A behavioral approach.” J. Int. Bus. Stud. 27 (5): 1005–1032. https://doi.org/10.1057/palgrave.jibs.8490161.
Benaroch, M., Y. Lichtenstein, and L. Fink. 2016. “Contract design choices and the balance of ex-ante and ex-post transaction costs in software development outsourcing.” MIS Q. 40 (1): 57–82. https://doi.org/10.25300/MISQ/2016/40.1.03.
Bradach, J., and R. Eccles. 1989. “Price, authority, and trust: From ideal types to plural forms.” Ann. Rev. Sociol. 15 (1): 97–118. https://doi.org/10.1146/annurev.so.15.080189.000525.
Buvik, M. P., and M. Rolfsen. 2015. “Prior ties and trust development in project teams: A case study from the construction industry.” Int. J. Project Manage. 33 (7): 1484–1494. https://doi.org/10.1016/j.ijproman.2015.06.002.
Cheung, S. O., W. K. Wong, T. W. Yiu, and H. Y. Pang. 2011. “Developing a trust inventory for construction contracting.” Int. J. Project Manage. 29 (2): 184–196. https://doi.org/10.1016/j.ijproman.2010.02.007.
Cheung, S. O., W. K. Wong, T. W. Yiu, and H. Y. Pang. 2013. “Interweaving trust and communication for project performance.” J. Constr. Eng. Manage. 139 (8): 914–950. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000681.
Chong, H. Y., S. L. Fan, M. Sutrisna, S. H. Hsieh, and C. M. Tsai. 2017a. “Preliminary contractual framework for BIM-enabled projects.” J. Constr. Eng. Manage. 143 (7): 04017025. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001278.
Chong, H. Y., C. Y. Lee, and X. Wang. 2017b. “A mixed review of the adoption of building information modelling (BIM) for sustainability.” J. Cleaner Prod. 142 (4): 4114–4126. https://doi.org/10.1016/j.jclepro.2016.09.222.
Choudhury, E. 2008. “Trust in administration: An integrative approach to optimal trust.” Admin. Soc. 40 (6): 586–620. https://doi.org/10.1177/0095399708321681.
Chow, P. T., S. O. Cheung, and K. Y. Chan. 2012. “Trust-building in construction contracting: Mechanism and expectation.” Int. J. Proj. Manage. 30 (8): 927–937. https://doi.org/10.1016/j.ijproman.2012.03.002.
Chow, P. T., S. O. Cheung, and Y. Ka Wa. 2014. “Impact of trust and satisfaction on the commitment-withdrawal relationship.” J. Manage. Eng. 31 (5): 04014087. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000331.
Connelly, B. L., T. Miller, and C. E. Devers. 2012. “Under a cloud of suspicion: Trust, distrust, and their interactive effect in interorganizational contracting.” Strategic Manage. J. 33 (7): 820–833. https://doi.org/10.1002/smj.974.
ConsensusDocs. 2008. ConsensusDocs guidebook: Building information modelling (BIM) addendum. Arlington, VA: ConsensusDocs.
CPC (Chartered Institute of Building). 2013. CIOB contract for use with complex projects. Berkshire, UK: CPC.
Crocker, K. J., and K. J. Reynolds. 1993. “The efficiency of incomplete contracts: An empirical analysis of Air Force engine procurement.” RAND J. Econ. 24 (1): 126–146. https://doi.org/10.2307/2555956.
Das, T. K., and B. S. Teng. 1998. “Between trust and control: Developing confidence in partner cooperation in alliances.” Acad. Manage. Rev. 23 (3): 491–512. https://doi.org/10.5465/AMR.1998.926623.
Dimoka, A. 2010. “What does the brain tell us about trust and distrust? Evidence from a functional neuroimaging study.” Mis Q. 34 (2), 373–396. https://doi.org/10.2307/20721433.
Dyer, J. H. 1997. “Effective interfirm collaboration: How firms minimize transaction costs and maximize transaction value.” Strategic Manage. J. 18 (7): 535–556. https://doi.org/10.1002/(SICI)1097-0266(199708)18:7%3C535::AID-SMJ885%3E3.0.CO;2-Z.
Eckhard, B., and T. Mellewigt. 2005. “Contractual functions and contractual dynamics in inter-firm relationships: What we know and how to proceed.” New York: SSRN.
Faems, D., M. Janssens, A. Madhok, and B. Van Looy. 2008. “Toward an integrative perspective on alliance governance: Connecting contract design, trust dynamics, and contract application.” Acad. Manage. J. 51 (6): 1053–1078. https://doi.org/10.5465/AMJ.2008.35732527.
Faulkner, D. 2000. “Trust and Control: Opposing or Complementary Functions?” Cooperative strategy: Economic, business and organizational issues. edited by D. Faulkner and M. De Rond. New York: Oxford University Press.
Fiske, S. T., and S. E. Taylor. 2016. Social cognition: From brains to culture. 3rd ed. Los Angeles: SAGE Publications.
Fong, P. S., and B. W. Lung. 2007. “Interorganizational teamwork in the construction industry.” J. Constr. Eng. Manage. 133 (2): 157–168. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(157).
Gad, G. M., J. S. Shane, K. C. Strong, and J. Choi. 2016. “Rethinking trust in construction contract formation: Dispute resolution method selection.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 8 (3): 04516003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000191.
Gargiulo, M., and G. Ertug. 2006. “The dark side of trust.” In Handbook of trust research, edited by A. Bachmann and A. Zaheer, 165–186. Northampton, MA: Edward Elgar.
Ghoshal, S., and P. Moran. 1996. “Bad for practice: A critique of the transaction cost theory.” Acad. Manage. Rev. 21 (1): 13–47. https://doi.org/10.5465/AMR.1996.9602161563.
Gulati, R. 1995. “Does familiarity breed trust? The implications of repeated ties for contractual choice in alliances.” Acad. Manage. J. 38 (1): 85–112. https://doi.org/10.2307/256729.
Gulati, R., P. R. Lawrence, and P. Puranam. 2005. “Adaptation in vertical relationships: Beyond incentive conflict.” Strategic Manage. J. 26 (5): 415–440. https://doi.org/10.1002/smj.458.
Harper, C. M., K. R. Molenaar, and J. P. Cannon. 2016. “Measuring constructs of relational contracting in construction projects: The owner’s perspective.” J. Constr. Eng. Manage. 142 (10): 04016053. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001169.
Jiang, W., Y. Lu, and Y. Le. 2016. “Trust and project success: A twofold perspective between owners and contractors.” J. Manage. Eng. 32 (6): 04016022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000469.
Kadefors, A. 2004. “Trust in project relationships: Inside the black box.” Int. J. Project Manage. 22 (3): 175–182. https://doi.org/10.1016/S0263-7863(03)00031-0.
Lampel, J. 2001. “The core competencies of effective project execution: The challenge of diversity.” Int. J. Project Manage. 19 (8): 471–483. https://doi.org/10.1016/S0263-7863(01)00042-4.
Lewicki, R. J. 2007. “Trust and distrust.” In The negotiator’s fieldbook, edited by A. K. Schneider and C. Honeyman, 191–202. Washington, DC: American Bar Association.
Lui, S. S., and H. Y. Ngo. 2004. “The role of trust and contractual safeguards on cooperation in non-equity alliances.” J. Manage. 30 (4): 471–485. https://doi.org/10.1016/j.jm.2004.02.002.
Lumineau, F. 2017. “How contracts influence trust and distrust.” J. Manage. 43 (5): 1553–1577. https://doi.org/10.1177/0149206314556656.
Mayer, K. J., and N. S. Argyres. 2004. “Learning to contract: Evidence from the personal computer industry.” Organ. Sci. 15 (4): 394–410. https://doi.org/10.1287/orsc.1040.0074.
Morgan, R. M., and S. D. Hunt. 1994. “The commitment-trust theory of relationship marketing.” J. Marketing 58 (3): 20–38. https://doi.org/10.2307/1252308.
Parkhe, A. 1993. “Strategic alliance structuring: A game theoretic and transaction cost examination of interfirm cooperation.” Acad. Manage. J. 36 (4): 794–829. https://doi.org/10.2307/256759.
Parmigiani, A., and M. Rivera-Santos. 2011. “Clearing a path through the forest: A meta-review of interorganizational relationships.” J. Manage. 37 (4): 1108–1136. https://doi.org/10.1177/0149206311407507.
Pishdad-Bozorgi, P., and Y. J. Beliveau. 2016. “Symbiotic relationships between integrated project delivery (IPD) and trust.” Int. J. Constr. Educ. Res. 12 (3): 179–192. https://doi.org/10.1080/15578771.2015.1118170.
Poppo, L., and T. Zenger. 2002. “Do formal contracts and relational governance function as substitutes or complements?” Strategic Manage. J. 23 (8): 707–725. https://doi.org/10.1002/smj.249.
Puranam, P., H. Singh, and M. Zollo. 2006. “Organizing for innovation: Managing the coordination-autonomy dilemma in technology acquisitions.” Acad. Manage. J. 49 (2): 263–280. https://doi.org/10.5465/AMJ.2006.20786062.
Qi, C., and P. Y. Chau. 2013. “Investigating the roles of interpersonal and interorganizational trust in IT outsourcing success.” Info. Technol. People 26 (2): 120–145. https://doi.org/10.1108/ITP-09-2012-0088.
Quanji, Z., S. Zhang, and Y. Wang. 2016. “Contractual governance effects on cooperation in construction projects: Multifunctional approach.” J. Prof. Issues Eng. Educ. Pract. 143 (3): 04016025. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000320.
Rousseau, D. M., S. B. Sitkin, R. S. Burt, and C. Camerer. 1998. “Not so different after all: A cross-discipline view of trust.” Acad. Manage. Rev. 23 (3): 393–404. https://doi.org/10.5465/AMR.1998.926617.
Rus, A., and H. Iglič. 2005. “Trust, governance and performance: The role of institutional and interpersonal trust in SME development.” Int. Sociology 20 (3): 371–391. https://doi.org/10.1177/0268580905055481.
Sako, M. 2006. “Does trust improve business performance?” In Organizational trust: A reader, edited by R. M. Kramer, 267–294. New York: Oxford University Press.
Schepker, D. J., W. Y. Oh, A. Martynov, and L. Poppo. 2014. “The many futures of contracts: Moving beyond structure and safeguarding to coordination and adaptation.” J. Manage. 40 (1): 193–225. https://doi.org/10.1177/0149206313491289.
Segal, I. 1999. “Complexity and renegotiation: A foundation for incomplete contracts.” Rev. Econ. Stud. 66 (1): 57–82. https://doi.org/10.1111/1467-937X.00078.
Singh, R. 2010. “Delays and cost overruns in infrastructure projects: Extent, causes and remedies.” Econ. Political Weekly 45 (21): 43–54.
Singh, V., N. Gu, and X. Wang. 2011. “A theoretical framework of a BIM-based multi-disciplinary collaboration platform.” Autom. Constr. 20 (2): 134–144. https://doi.org/10.1016/j.autcon.2010.09.011.
Steinberg, H. M. 2017. Understanding and negotiating EPC contracts. Vol. 1 of The project sponsor’s perspective. New York: Routledge.
Succar, B. 2009. “Building information modelling framework: A research and delivery foundation for industry stakeholders.” Automat. Constr. 18 (3): 357–375. https://doi.org/10.1016/j.autcon.2008.10.003.
Succar, B., W. Sher, and A. Williams. 2012. “Measuring BIM performance: Five metrics.” Archit. Eng. Des. Manage. 8 (2): 120–142. https://doi.org/10.1080/17452007.2012.659506.
Vlaar, P. W., F. A. Van den Bosch, and H. W. Volberda. 2007. “On the evolution of trust, distrust, and formal coordination and control in interorganizational relationships: Toward an integrative framework.” Group Organ. Manage. 32 (4): 407–428. https://doi.org/10.1177/1059601106294215.
Wicks, A. C., S. L. Berman, and T. M. Jones. 1999. “The structure of optimal trust: Moral and strategic implications.” Acad. Manage. Rev. 24 (1): 99–116. https://doi.org/10.5465/amr.1999.1580443.
Williamson, O. E. 1991. “Comparative economic organization: The analysis of discrete structural alternatives.” Admin. Sci. Q. 36 (2): 269–296. https://doi.org/10.2307/2393356.
Williston, S., and C. M. Lewis. 1920. Vol. 1 of The law of contracts. New York: Baker, Voorhis.
Wong, W. K., S. O. Cheung, T. W. Yiu, and H. Y. Pang. 2008. “A framework for trust in construction contracting.” Int. J. Project Manage. 26 (8): 821–829. https://doi.org/10.1016/j.ijproman.2007.11.004.
Woolthuis, R. K., B. Hillebrand, and B. Nooteboom. 2005. “Trust, contract and relationship development.” Org. Stud. 26 (6): 813–840. https://doi.org/10.1177/0170840605054594.
Yiu, T. W., and W. Y. Lai. 2009. “Efficacy of trust-building tactics in construction mediation.” J. Constr. Eng. Manage. 135 (8): 683–689. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000028.
Zaghloul, R., and F. Hartman. 2003. “Construction contracts: The cost of mistrust.” Int. J. Proj. Manage. 21 (6): 419–424. https://doi.org/10.1016/S0263-7863(02)00082-0.
Zaheer, A., B. McEvily, and V. Perrone. 1998. “Does trust matter? Exploring the effects of interorganizational and interpersonal trust on performance.” Organ. Sci. 9 (2): 141–159. https://doi.org/10.1287/orsc.9.2.141.
Zhang, S., S. Zhang, Y. Gao, and X. Ding. 2016. “Contractual governance: Effects of risk allocation on contractors’ cooperative behavior in construction projects.” J. Constr. Eng. Manage. 142 (6): 04016005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001111.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 144Issue 7July 2018

History

Received: Sep 20, 2017
Accepted: Feb 5, 2018
Published online: May 8, 2018
Published in print: Jul 1, 2018
Discussion open until: Oct 8, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, School of Built Environment, Curtin Univ., GPO Box U1987, Perth, WA 6845, Australia (corresponding author). ORCID: https://orcid.org/0000-0001-6222-2061. Email: [email protected]
Heap-Yih Chong, Ph.D.
Senior Lecturer, School of Built Environment, Curtin Univ., GPO Box U1987, Perth, WA 6845, Australia.
Xiangyu Wang, Ph.D., Aff.M.ASCE
Professor, School of Built Environment, Curtin Univ., GPO Box U1987, Perth, WA 6845, Australia.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share