Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost
Publication: Journal of Construction Engineering and Management
Volume 144, Issue 7
Abstract
This paper presents the development of a novel optimization model for the scheduling of repetitive construction projects. The model provides original and unique capabilities that enable planners to search for and identify an optimal/near optimal schedule that simultaneously minimizes project duration, crew work interruptions, and interruption costs. The model computations are organized in four major modules: (1) an optimization module that searches for and identifies a near optimal schedule that simultaneously minimizes the project duration, work interruptions, and interruption costs; (2) an initial scheduling module that calculates the early start date and work-continuity total float for each activity in all of its repetitive sections; (3) an intermediate scheduling module that generates a set of feasible schedules that simultaneously minimize project duration and work interruptions; and (4) an interruption cost module that calculates total interruption cost for each of the generated schedules. An application example of a repetitive construction project is analyzed to evaluate model performance and demonstrate its capabilities in optimizing the scheduling of repetitive construction projects.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data sharing policy can be found here: http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001263.
References
Adeli, H., and A. Karim. 1997. “Scheduling/cost optimization and neural dynamics model for construction.” J. Constr. Eng. Manage. 123 (4): 450–458.
Ammar, M. A. 2013. “LOB and CPM integrated method for scheduling repetitive projects.” J. Constr. Eng. Manage. 139 (1): 44–50.
Bakry, I., O. Moselhi, and T. Zayed. 2014. “Optimized acceleration of repetitive construction projects.” Autom. Constr. 39 (Apr): 145–151.
Bakry, I., O. Moselhi, and T. Zayed. 2016. “Optimized scheduling and buffering of repetitive construction projects under uncertainty.” Eng. Constr. Archit. Manage. 23 (6): 782–800.
Damci, A., D. Arditi, and G. Polat. 2013a. “Multiresource leveling in line-of-balance scheduling.” J. Constr. Eng. Manage. 139 (9): 1108–1116.
Damci, A., D. Arditi, and G. Polat. 2013b. “Resource leveling in line-of-balance scheduling.” Comput. Aided Civ. Infrastruct. Eng. 28 (9): 679–692.
Duffy, G. A., G. D. Oberlender, and D. H. Seok Jeong. 2011. “Linear scheduling model with varying production rates.” J. Constr. Eng. Manage. 137 (8): 574–582.
El-Rayes, K. 2001a. “Object-oriented model for repetitive construction scheduling.” J. Constr. Eng. Manage. 127 (3): 199–205.
El-Rayes, K. 2001b. “Optimum planning of highway construction under A + B bidding method.” J. Constr. Eng. Manage. 127 (4): 261–269.
El-Rayes, K., and O. Moselhi. 1998. “Resource-driven scheduling of repetitive activities.” Constr. Manage. Econ. 16 (4): 433–446.
El-Rayes, K., and O. Moselhi. 2001. “Optimizing resource utilization for repetitive construction projects.” J. Constr. Eng. Manage. 127 (1): 18–27.
Fan, S.-L., and Y.-C. Lin. 2007. “Time-cost trade-off in repetitive projects with soft logic.” In Computing in Civil Engineering (2007), 83–90. Reston, VA: ASCE.
Fan, S.-L., K.-S. Sun, and Y.-R. Wang. 2012. “GA optimization model for repetitive projects with soft logic.” Autom. Constr. 21 (Jan): 253–261.
Georgy, M. E. 2008. “Evolutionary resource scheduler for linear projects.” Autom. Constr. 17 (5): 573–583.
Hegazy, T., A. Elhakeem, and E. Elbeltagi. 2004. “Distributed scheduling model for infrastructure networks.” J. Constr. Eng. Manage. 130 (2): 160–167.
Hegazy, T., and E. Kamarah. 2008. “Efficient repetitive scheduling for high-rise construction.” J. Constr. Eng. Manage. 134 (4): 253–264.
Hegazy, T., and N. Wassef. 2001. “Cost optimization in projects with repetitive nonserial activities.” J. Constr. Eng. Manage. 127 (3): 183–191.
Huang, R., and K.-S. Sun. 2006. “Non-unit-based planning and scheduling of repetitive construction projects.” J. Constr. Eng. Manage. 132 (6): 585–597.
Huang, R., and K.-S. Sun. 2009. “A GA optimization model for workgroup-based repetitive scheduling (WoRSM).” Adv. Eng. Software 40 (3): 212–228.
Hyari, K., and K. El-Rayes. 2004. “A multi-objective model for optimizing construction planning of repetitive infrastructure projects.” In Proc., 10th Int. Conf. on Computing in Civil and Building Engineering. Weimar, Germany: Bauhaus-Universität Weimar.
Hyari, K., and K. El-Rayes. 2006. “Optimal planning and scheduling for repetitive construction projects.” J. Manage. Eng. 23 (1): 11–19.
Hyari, K. H., K. El-Rayes, and M. El-Mashaleh. 2009. “Automated trade-off between time and cost in planning repetitive construction projects.” Constr. Manage. Econ. 27 (8): 749–761.
Ipsilandis, P. G. 2007. “Multiobjective linear programming model for scheduling linear repetitive projects.” J. Constr. Eng. Manage. 133 (6): 417–424.
Liu, S.-S., and C.-J. Wang. 2007. “Optimization model for resource assignment problems of linear construction projects.” Autom. Constr. 16 (4): 460–473.
Long, L. D., and A. Ohsato. 2009. “A genetic algorithm-based method for scheduling repetitive construction projects.” Autom. Constr. 18 (4): 499–511.
Lucko, G. 2011. “Integrating efficient resource optimization and linear schedule analysis with singularity functions.” J. Constr. Eng. Manage. 137 (1): 45–55.
Moselhi, O., and K. El-Rayes. 1993a. “Least cost scheduling for repetitive projects.” Can. J. Civ. Eng. 20 (5): 834–843.
Moselhi, O., and K. El-Rayes. 1993b. “Scheduling of repetitive projects with cost optimization.” J. Constr. Eng. Manage. 119 (4): 681–697.
Moselhi, O., and A. Hassanein. 2003. “Optimized scheduling of linear projects.” J. Constr. Eng. Manage 129 (6): 664–673.
Nassar, K. 2005. “Evolutionary optimization of resource allocation in repetitive construction schedules.” J. Inf. Technol. Constr. 10 (18): 265–273.
Perera, S. 1983. “Resource sharing in linear construction.” J. Constr. Eng. Manage. 129 (6): 102–111.
Russell, A. D., and W. F. Caselton. 1988. “Extensions to linear scheduling optimization.” J. Constr. Eng. Manage. 114 (1): 36–52.
Selinger, S. 1980. “Construction planning for linear projects.” J. Constr. Div. 106 (2): 195–205.
Senouci, A. B., and N. N. Eldin. 1996. “Dynamic programming approach to scheduling of nonserial linear project.” J. Comput. Civ. Eng. 10 (2): 106–114.
Suhail, S. A., and R. H. Neale. 1994. “CPM/LOB: New methodology to integrate CPM and line of balance.” J. Constr. Eng. Manage. 120 (3): 667–684.
Zolfaghar Dolabi, H. R., A. Afshar, and R. Abbasnia. 2014. “CPM/LOB scheduling method for project deadline constraint satisfaction.” Autom. Constr. 48 (Dec): 107–118.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Aug 21, 2017
Accepted: Jan 3, 2018
Published online: Apr 19, 2018
Published in print: Jul 1, 2018
Discussion open until: Sep 19, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.