Slip Chart–Inspired Project Schedule Diagramming: Links, Extension to Network Schedules, and Unification

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 7

Abstract

Schedule delays are an unfortunate prevalent occurrence in the construction industry. To clearly visualize, track, and mitigate them, graphical and analytical tools are needed. But traditional bar charts do not clearly show delays, and network charts all but hide them. Neither facilitates side-by-side comparisons of schedule updates. Networks can be converted into a modified slip chart from the aerospace industry, which is particularly adept at analyzing delays. Contributions to the body of knowledge include the ability to communicate schedule information more efficiently with less ink, yet in a time-scaled manner, including lead or lag constraints, performing side-by-side comparisons that immediately reveal float gain or loss versus criticality, rapidly identifying underperforming activities, and scrutinizing delay events and assigning responsibility to project participants. To validate the new approach, a delay example from the literature is reanalyzed to gain insights into schedule performance. Comparing the network conversion with a previously developed linear schedule one indicates that the entire approach provides a single framework to plan and control project schedules, which thus can be called the Unified Diagramming Method.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

Financial support by Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES Foundation), Ministry of Education, Brazil for the first author is gratefully acknowledged. Early thoughts by Philip M. Goolkasian, former undergraduate student at the Catholic University of America, on the layout are gratefully acknowledged. Last but not least, thanks to Ms. Kimberly M. Hoffman, Scholarly Communications Coordinator at Catholic University of America for assistance in obtaining library materials.

References

Akintoye, A. S., and MacLeod, M. J. (1997). “Risk analysis and management in construction.” Int. J. Constr. Manage., 15(1), 31–38.
Alkass, S., Mazerolle, M., and Harris, F. (1996). “Construction delay analysis techniques.” Constr. Manage. Econ., 14(5), 375–394.
Bhargava, A., Anastasopoulos, P. C., Labi, S., Sinha, K. C., and Mannering, F. L. (2010). “Three-stage least-squares analysis of time and cost overruns in construction contracts.” J. Constr. Eng. Manage., 1207–1218.
Brooke, D. G. (1973). “The use of slip charts to review research projects.” R&D Manage., 4(1), 9–11.
Crandall, K. C. (1973). “Project planning with precedence lead/lag factors.” Project Manage. Q., 4(3), PMI-18–PMI-27.
Creedy, G. D., Skitmore, M., and Wong, J. K. W. (2010). “Evaluation of risk factors leading to cost overrun in delivery of highway construction projects.” J. Constr. Eng. Manage., 528–537.
Doloi, H. (2013). “Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects.” J. Constr. Eng. Manage., 267–279.
ESA (European Space Agency). (1995). “Guide to software project management.” 〈ftp://ftp.estec.esa.nl/pub/wm/anonymous/wme/bssc/PSS0508.pdf〉 (Nov. 14, 2014).
Gangale, T. (2007). “The architecture of time. Part 3: Project management in two-dimensional time.” Proc., AIAA Space 2007 Conf. and Exposition, American Institute of Aeronautics and Astronautics, Reston, VA, 14.
Hegazy, T., and Zhang, K. (2005). “Daily windows delay analysis.” J. Constr. Eng. Manage., 505–512.
Kim, Y., Kim, K., and Shin, D. (2005). “Delay analysis method using delay section.” J. Constr. Eng. Manage., 1155–1164.
Lainati, A., and Arena, M. (2010). “Project management models for long product rolling mills.” Proc., AISTech Iron and Steel Technology Conf., S. M. Mills, ed., Association for Iron and Steel Technology, Warrendale, PA, 661–668.
Lucko, G. (2007). “Flexible modeling of linear schedules for integrated mathematical analysis.” Proc., 39th Winter Simulation Conf., S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds., Institute of Electrical and Electronics Engineers, Piscataway, NJ, 2159–2167.
Lucko, G., Gomes Araújo, L., and Cates, G. R. (2015). “Slip chart-inspired project schedule diagramming: Origins, buffers, and extension to linear schedules.” J. Constr. Eng. Manage., 04015101.
Lucko, G., and Rojas, E. M. (2010). “Research validation: Challenges and opportunities in the construction domain.” J. Constr. Eng. Manage., 127–135.
Menches, C. L., and Hanna, A. S. (2006). “Quantitative measurement of successful performance from the project manager’s perspective.” J. Constr. Eng. Manage., 1284–1293.
NASA. (1977). “Lunar impact: A history of project ranger.” 〈http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19780007206_1978007206.pdf〉 (Nov. 5, 2014).
NASA (National Aeronautics and Space Administration). (1978). “Moonport: A history of Apollo launch facilities and operations.” 〈http://ntrs.nasa.gov/search.jsp?R=19790003956〉 (Nov. 5, 2014).
Plotnick, F. L. (2006). “RDM—Relationship diagramming method.” AACE Int. Trans., PS.08.1–PS.08-10.
Rit, J.-F. (1986). “Propagating temporal constrains for scheduling.” Proc., 5th National Conf. on Artificial Intelligence, T. Kehler and S. Rosenschein, eds., Association for the Advancement of Artificial Intelligence (AAAI), Menlo Park, CA, 383–388.
Stumpf, G. R. (2000). “Schedule delay analysis.” Cost Eng., 42(7), 32–43.
Tufte, E. R. (2001). The visual display of quantitative information, 2nd Ed., Graphics Press, Chechire, CT.
Wickwire, J. M., Driscoll, T. J., Hurlbut, S. B., and Groff, M. J. (2009). Construction scheduling: Preparation, liability and claims, 3rd Ed., Aspen Publishers/Wolters Kluwer Law and Business, Frederick, MD.
Wiest, J. D. (1981). “Precedence diagramming method: Some unusual characteristics and their implications for project managers.” J. Oper. Manage., 1(3), 121–130.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 7July 2016

History

Received: Jul 24, 2015
Accepted: Nov 5, 2015
Published online: Jan 21, 2016
Discussion open until: Jun 21, 2016
Published in print: Jul 1, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Lissa Gomes Araújo [email protected]
Undergraduate Research Assistant, Construction Engineering and Management Program, Dept. of Civil Engineering, Catholic Univ. of America, Washington, DC 20064; Affiliated with Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES Foundation), Ministry of Education, CEP 70.040-020 Brasília-DF, Brazil. E-mail: [email protected]
Gunnar Lucko, Ph.D., A.M.ASCE [email protected]
Associate Professor of Civil Engineering and Director of Construction Engineering and Management Program, Dept. of Civil Engineering, Catholic Univ. of America, Washington, DC 20064 (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share