Risk Paths in International Construction Projects: Case Study from Chinese Contractors

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 6

Abstract

Contracting in overseas construction markets involves not only the typical risks at home, but also the complex and diverse risks peculiar to international transactions. In addition, international construction project risks are highly interdependent. The objectives of this study are to (1) explore the risk paths in the international construction projects performed by Chinese contractors, and (2) examine the risk effects on the objectives of these projects. To achieve the research objectives, a total of 60 risks were identified from literature review and a questionnaire survey was conducted with 104 professionals from Chinese international contractors. Adopting the structural equation modeling technique, this study proposed a networking of 20 significant risk paths. Specifically, host government–related risk, contractor’s lack of experience, and contractors’ lack of managerial skills had significant effect on project cost, quality, and schedule objectives, respectively. Moreover, host government–related risk affected project cost performance indirectly through resource price fluctuation, and contractors’ lack of managerial skills affects project schedule objective indirectly through decrease in productivity. This study contributes to the literature because it is different from most of the previous studies, which depended on separate risk categories and generic checklists but failed to explore the potential interrelationships among risks in international construction projects. Additionally, the identification of risk path scenarios enables practitioners to gain a better understanding of the sources and impact areas of risks, and to better deal with the risks, thereby contributing to the practice.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The work described in this paper was supported by the National Nature Science Foundation of China (Project No. 71202084).

References

Akintoye, A. (2000). “Analysis of factors influencing project cost estimating practice.” Constr. Manage. Econ., 18(1), 77–89.
Al Khattab, A., Anchor, J., and Davies, E. (2007). “Managerial perceptions of political risk in international projects.” Int. J. Project Manage., 25(7), 734–743.
Alnuaimi, A. S., Taha, R. A., Mohsin, M. A., and Al-Harthi, A. S. (2010). “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.” J. Constr. Eng. Manage., 615–622.
Arditi, D., and Gunaydin, H. M. (1998). “Factors that affect process quality in the life cycle of building projects.” J. Constr. Eng. Manage., 194–203.
Bu-Qammaz, A. S., Dikmen, I., and Birgonul, M. T. (2009). “Risk assessment of international construction projects using the analytic network process.” Can. J. Civ. Eng., 36(7), 1170–1181.
Cendrowski, H., and Mair, W. C. (2009). Enterprise risk management and COSO: A guide for directors, executives, and practitioners, Wiley, Hoboken, NJ.
Chin, W. W. (1998). “The partial least squares approach to structural equation modeling.” Modern methods for business research, G. A. Marcoulides, ed., Lawrence Erlbaum Associates, Mahwah, NJ, 295–335.
Davison, A. C., and Hinkley, D. V. (1997). Bootstrap methods and their application, Cambridge University Press, Cambridge, U.K.
Deng, X., and Low, S. P. (2013). “Understanding the critical variables affecting the level of political risks in international construction projects.” KSCE J. Civ. Eng., 17(5), 895–907.
Deng, X., and Low, S. P. (2014). “Exploring critical variables that affect political risk level in international construction projects: Case study from Chinese contractors.” J. Prof. Issues Eng. Educ. Pract., 04013002.
Deng, X., Low, S. P., Li, Q., and Zhao, X. (2014a). “Developing competitive advantages in political risk management for international construction enterprises.” J. Constr. Eng. Manage., 04014040.
Deng, X., Low, S. P., and Zhao, X. (2014b). “Project system vulnerability to political risks in international construction projects: The case of Chinese contractors.” Project Manage. J., 45(2), 20–33.
Dikmen, I., and Birgonul, M. T. (2006). “An analytic hierarchy process based model for risk and opportunity assessment of international construction projects.” Can. J. Civ. Eng., 33(1), 58–68.
Dikmen, I., Birgonul, M. T., and Han, S. (2007). “Using fuzzy risk assessment to rate cost overrun risk in international construction projects.” Int. J. Project Manage., 25(5), 494–505.
Dikmen, I., Birgonul, T., and Eybpoosh, M. (2011). “Tracing risk paths in international construction projects: a case study.” Management and Innovation for a Sustainable Built Environment MISBE 2011, Delft Univ. of Technology Library, Delft, Netherlands.
Ebrat, M., and Ghodsi, R. (2014). “Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study.” KSCE J. Civ. Eng., 18(5), 1213–1227.
Efron, B. (1987). “Better bootstrap confidence intervals.” J. Am. Stat. Assoc., 82(397), 171–185.
El-Sayegh, S. M. (2008). “Risk assessment and allocation in the UAE construction industry.” Int. J. Project Manage., 26(4), 431–438.
ENR (Engineering News-Record). (2014). “The top 250 international contractors.” 〈http://enr.construction.com/toplists/top-international-contractors/001-100.asp〉 (Sep. 3, 2014).
Eybpoosh, M., Dikmen, I., and Birgonul, M. T. (2011). “Identification of risk paths in international construction projects using structural equation modeling.” J. Constr. Eng. Manage., 1164–1175.
Flyvbjerg, B., Bruzelius, N., and Rothengatter, W. (2003). Megaprojects and risk: An anatomy of ambition, Cambridge University Press, Cambridge, U.K.
Fornell, C., and Larcker, D. F. (1981). “Evaluating structural equation models with unobservable variables and measurement error.” J. Market. Res., 18(1), 39–50.
Hair, J. F., Anderson, R. E., Tatham, R. L., and Black, W. C. (1998). Multivariate data analysis with readings, Prentice Hall, Englewood Cliffs, NJ.
Hair, J. F., Ringle, C. M., and Sarstedt, M. (2011). “PLS-SEM: Indeed a silver bullet.” J. Market. Theory Pract., 19(2), 139–152.
Hair, J. F., Ringle, C. M., and Sarstedt, M. (2012). “Partial least squares: The better approach to structural equation modeling?” Long Range Plann., 45(5–6), 312–319.
Han, S. H., and Diekmann, J. E. (2001a). “Approaches for making risk-based go/no-go decision for international projects.” J. Constr. Eng. Manage., 300–308.
Han, S. H., and Diekmann, J. E. (2001b). “Making a risk-based bid decision for overseas construction projects.” Constr. Manage. Econ., 19(8), 765–776.
Han, S. H., Diekmann, J. E., Lee, Y., and Ock, J. H. (2004). “Multicriteria financial portfolio risk management for international projects.” J. Constr. Eng. Manage., 346–356.
Han, S. H., Park, H. K., Yeom, S. M., Chae, M. J., and Kim, D. Y. (2014). “Risk-integrated cash flow forecasting for overseas construction projects.” KSCE J. Civ. Eng., 18(4), 875–886.
Han, S. H., Park, S. H., Kim, D. Y., Kim, H., and Kang, Y. W. (2007). “Causes of bad profit in overseas construction projects.” J. Constr. Eng. Manage., 932–943.
Hastak, M., and Shaked, A. (2000). “ICRAM-1: Model for international construction risk assessment.” J. Manage. Eng., 59–69.
Hillson, D. (2009). Managing risk in projects, Gower, Surrey, U.K.
Hwang, B. G., Zhao, X., and Do, T. H. V. (2014a). “Influence of trade-level coordination problems on project productivity.” Project Manage. J., 45(5), 5–14.
Hwang, B. G., Zhao, X., and Goh, K. J. (2014b). “Investigating the client-related rework in building projects: The case of Singapore.” Int. J. Project Manage., 32(4), 698–708.
Hwang, B. G., Zhao, X., and Ong, S. (2015a). “Value management in Singaporean building projects: Implementation status, critical success factors, and risk factors.” J. Manage. Eng., 04014094.
Hwang, B. G., Zhao, X., See, Y. L., and Zhong, Y. (2015b). “Addressing risks in green retrofit projects: The case of Singapore.” Project Manage. J., 46(4), 76–89.
Jensen, C., Johansson, S., and Löfström, M. (2006). “Project relationships—A model for analyzing interactional uncertainty.” Int. J. Project Manage., 24(1), 4–12.
Jha, K. N., and Devaya, M. N. (2008). “Modelling the risks faced by Indian construction companies assessing international projects.” Constr. Manage. Econ., 26(4), 337–348.
Kim, D. Y., Han, S. H., and Kim, H. (2008). “Discriminant analysis for predicting ranges of cost variance in international construction projects.” J. Constr. Eng. Manage., 398–410.
Kim, D. Y., Han, S. H., Kim, H., and Park, H. (2009). “Structuring the prediction model of project performance for international construction projects: A comparative analysis.” Expert Syst. Appl., 36(2), 1961–1971.
Kuo, Y.-C., and Lu, S.-T. (2013). “Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects.” Int. J. Project Manage., 31(4), 602–614.
Le, Y., Shan, M., Chan, A. P. C., and Hu, Y. (2014). “Investigating the causal relationships between causes of and vulnerabilities to corruption in the Chinese public construction sector.” J. Constr. Eng. Manage., 05014007.
Li, H. X., Al-Hussein, M., Lei, Z., and Ajweh, Z. (2013). “Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation.” Can. J. Civ. Eng., 40(12), 1184–1195.
Ling, F., and Lim, H. L. (2007). “Foreign firms’ financial and economic risk in China.” Eng. Constr. Archit. Manage., 14(4), 346–362.
Ling, F. Y. Y. (2004). “Key determinants of performance of design-bid-build projects in Singapore.” Build. Res. Inf., 32(2), 128–139.
Ling, F. Y. Y., and Hoang, V. T. P. (2010). “Political, economic, and legal risks faced in international projects: case study of Vietnam.” J. Prof. Issues Eng. Educ. Pract., 156–164.
Ling, F. Y. Y., and Low, S. P. (2007). “Legal risks faced by foreign architectural, engineering, and construction firms in China.” J. Prof. Issues Eng. Educ. Pract., 238–245.
Löfgren, P., and Eriksson, P. E. (2009). “Effects of collaboration in projects on construction project performance.” Proc., 25th Annual ARCOM Conf., Association of Researchers in Construction Management, Nottingham, U.K., 595–604.
Low, S. P., Liu, J. Y., and He, S. Q. (2008). “Management of external risks: Case study of a Chinese construction firm at infancy stage in Singapore.” Int. J. Constr. Manage., 8(2), 1–15.
Low, S. P., Liu, J. Y., and He, S. Q. (2009). “External risk management practices of Chinese construction firms in Singapore.” KSCE J. Civ. Eng., 13(2), 85–95.
Mahalingam, A., and Levitt, R. E. (2007). “Safety issues on global projects.” J. Constr. Eng. Manage., 506–516.
Matsunaga, M. (2010). “How to factor-analyze your data right: Do’s, don’ts, and how-to’s.” Int. J. Psychol. Res., 3(1), 97–110.
Nasirzadeh, F., Afshar, A., Khanzadi, M., and Howick, S. (2008). “Integrating system dynamics and fuzzy logic modelling for construction risk management.” Constr. Manage. Econ., 26(11), 1197–1212.
NBSC (National Bureau of Statistics of China). (2014). China statistical yearbook 2014, China Statistics Press, Beijing.
Nieto-Morote, A., and Ruz-Vila, F. (2011). “A fuzzy approach to construction project risk assessment.” Int. J. Project Manage., 29(2), 220–231.
Ning, Y. (2014). “Quantitative effects of drivers and barriers on networking strategies in public construction projects.” Int. J. Project Manage., 32(2), 286–297.
Ning, Y., and Ling, F. Y. Y. (2013). “Boosting public construction project outcomes through relational transactions.” J. Constr. Eng. Manage., 04013037.
Odeyinka, H. A., Lowe, J., and Kaka, A. P. (2013). “Artificial neural network cost flow risk assessment model.” Constr. Manage. Econ., 31(5), 423–439.
Patton, M. Q. (2001). Qualitative research & evaluation components, Sage, Thousand Oaks, CA.
Sambasivan, M., and Soon, Y. W. (2007). “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Manage., 25(5), 517–526.
Shane, J. S., Molenaar, K. R., Anderson, S., and Schexnayder, C. (2009). “Construction project cost escalation factors.” J. Manage. Eng., 221–229.
Steffey, R. W., and Anantatmula, V. S. (2011). “International projects proposal analysis: Risk assessment using radial maps.” Project Manage. J., 42(3), 62–74.
Subramanyan, H., Sawant, P. H., and Bhatt, V. (2012). “Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India.” J. Constr. Eng. Manage., 409–421.
Sun, M., and Meng, X. (2009). “Taxonomy for change causes and effects in construction projects.” Int. J. Project Manage., 27(6), 560–572.
Wang, S. Q., Dulaimi, M. F., and Aguria, M. Y. (2004). “Risk management framework for construction projects in developing countries.” Constr. Manage. Econ., 22(3), 237–252.
Wilkins, J. R. (2011). “Construction workers’ perceptions of health and safety training programmes.” Constr. Manage. Econ., 29(10), 1017–1026.
Xiong, B., Skitmore, M., Xia, B., Masrom, M. A., Ye, K., and Bridge, A. (2014). “Examining the influence of participant performance factors on contractor satisfaction: A structural equation model”. Int. J. Project Manage., 32(3), 482–491.
Zhao, X., Hwang, B. G., and Low, S. P. (2013). “Critical success factors for enterprise risk management in Chinese construction companies.” Constr. Manage. Econ., 31(12), 1199–1214.
Zhao, X., Hwang, B. G., and Low, S. P. (2014a). “Investigating enterprise risk management maturity in construction firms.” J. Constr. Eng. Manage., 05014006.
Zhao, X., Hwang, B. G., Low, S. P., and Wu, P. (2015). “Reducing hindrances to enterprise risk management implementation in construction firms.” J. Constr. Eng. Manage., 04014083.
Zhao, X., Hwang, B. G., and Phng, W. (2014c). “Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding.” KSCE J. Civ. Eng., 18(1), 27–36.
Zhi, H. (1995). “Risk management for overseas construction projects.” Int. J. Project Manage., 13(4), 231–237.
Zou, P. X., Zhang, G., and Wang, J.-Y. (2006). “Identifying key risks in construction projects: Life cycle and stakeholder perspectives.” Pacific Rim Real Estate Society Conf., Univ. of Auckland Business School, Auckland, New Zealand.
Zou, P. X. W., Zhang, G., and Wang, J. (2007). “Understanding the key risks in construction projects in China.” Int. J. Project Manage., 25(6), 601–614.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 6June 2016

History

Received: Jul 19, 2015
Accepted: Oct 29, 2015
Published online: Jan 13, 2016
Published in print: Jun 1, 2016
Discussion open until: Jun 13, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Junying Liu
Professor, Dept. of Construction Management, College of Management and Economics, Tianjin Univ., 92 Weijin Rd., Tianjin 300072, China.
Xianbo Zhao
Lecturer, School of Engineering and Technology, Central Queensland Univ., 400 Kent St., Sydney, NSW 2000, Australia.
Ph.D. Candidate, Dept. of Construction Management, College of Management and Economics, Tianjin Univ., 92 Weijin Rd., Tianjin 300072, China (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share