Characterization of Process Variability in Construction
This article has been corrected.
VIEW CORRECTIONPublication: Journal of Construction Engineering and Management
Volume 140, Issue 11
Abstract
Variability is a major problem in construction projects. It can negatively affect performance and disrupt production. In the past two decades, a considerable amount of research has been undertaken to select a suitable statistical model that can accurately model this variability. Although the beta distribution has achieved extensive acceptance to model process durations in construction, certain production situations can constrain its modeling capabilities. The limitations are apparent when a coefficient of variation associated with the process variability is higher than 100%. The aim of this research is to explore a reliable probability distribution function that can model the situations in which the beta distribution is not suitable. Data from 73 construction samples corresponding to 25 projects from three different countries were analyzed as a case study by using statistical inference techniques and stochastic simulation. The main finding from this research shows that the Burr distribution was a more accurate statistical function for modeling processes with variability levels between 100 and 150% in comparison to other commonly used distributions. The results enable construction modelers to represent and simulate the process variability with an increased accuracy in a wider range of variability. Accordingly, suitable production strategies can be designed to cope with variability in construction.
Get full access to this article
View all available purchase options and get full access to this article.
References
AbouRizk, S., Hijazi, A., and Halpin, D. (1989). “Effect of input modeling on simulation output.” Proc., American Society of Civil Engineers, Atlanta, GA, 605–612.
AbouRizk, S. M., and Halpin, D. W. (1990). “Probabilistic simulation studies for repetitive construction processes.” J. Constr. Eng. Manage., 575–594.
AbouRizk, S. M., and Halpin, D. W. (1992). “Statistical properties of construction duration data.” J. Constr. Eng. Manage., 525–544.
AbouRizk, S. M., Halpin, D. W., and Wilson, J. R. (1991). “Visual interactive fitting of beta distributions.” J. Constr. Eng. Manage., 589–605.
Abramowitz, M., and Stegun, I. A. (1965). Handbook of mathematical functions: With formulas, graphs, and mathematical tables, Dover Publications, New York.
Ambrozy, A. (1977). “Variance of simulated 1/f noise.” Electron. Lett., 13(8), 224–225.
Anderson, C. (2008). The long tail: Why the future of business is selling less of more, Hyperion, New York.
Anderson, T. W., and Darling, D. A. (1954). “A test of goodness of fit.” J. Am. Stat. Assoc., 49(268), 765–769.
Arashpour, M., Wakefield, R., and Blismas, N. (2013). “A new approach for modelling variability in residential construction projects.” Australas. J. Constr. Econ. Build., 13(2), 83–92.
Ben-Haim, Y., and Laufer, A. (1998). “Robust reliability of projects with activity-duration uncertainty.” J. Constr. Eng. Manage., 125–132.
Birnbaum, Z., and Saunders, S. C. (1969). “A new family of life distributions.” J. Appl. Probab., 6(2), 319–327.
Box, G. E. P., and Cox, D. R. (1964). “An analysis of transformations.” J. R. Stat. Soc. Ser. B, 26(2), 211–252.
Bruederl, J., and Diekmann, A. (1995). “The log-logistic rate model two generalizations with an application to demographic data.” Soc. Methods Res., 24(2), 158–186.
Carmichael, D. G. (1986). “Erlang loading models in earthmoving.” Civ. Eng. Syst., 3(3), 118–124.
Čížek, P., Härdle, W., and Weron, R. (2005). Statistical tools for finance and insurance, Springer, Heidelberg, Germany.
Clemmens, J. P., and Willenbrock, J. H. (1978). “The SCRAPESIM computer simulation.” J. Constr. Div., 104(4), 419–435.
Cochran, W. G. (2007). Sampling techniques, Wiley, New York.
Dhanasekar, M. (2000). “Identification of optimal size resources for a repetitive housing construction.” Eng. Constr. Archit. Manage., 7(4), 347–361.
Dukic, D., Marie, T., and Babic, D. (2007). “Analysis of duration and cost estimate of construction projects through computer simulation.” 29th Int. Conf. on Information Technology Interfaces, IEEE, Piscataway, NJ, 107–112.
EasyFit version 5.5 [Computer software]. MathWave Technologies, MN.
ExtendSim version 8 [Computer software]. Imagine That, San Jose.
Farid, F., and Koning, T. L. (1994). “Simulation verifies queuing program for selecting loader-truck fleets.” J. Constr. Eng. Manage., 386–404.
Fei, X., and Jin, Y. (2013). “Reduce cycle time at semiconductor assembly test manufacturing with factory physics methodology.” Adv. Mater. Res., 753, 3166–3168.
Fente, J., Knutson, K., and Schexnayder, C. (1999). “Defining a beta distribution function for construction simulation.” Winter Simulation Conf., IEEE, Piscataway, NJ, 1010–1015.
Fisher, R. (1925). “Applications of ‘student’s’ distribution.” Metron, 5(1), 90–104.
Fletcher, S., and Ponnambalam, K. (1996). “Estimation of reservoir yield and storage distribution using moments analysis.” J. Hydrol., 182(1), 259–275.
Folks, J. L., and Chhikara, R. S. (2005). The inverse Gaussian distribution, theory, methodology and applications, Marcel Dekker, New York.
Garthwaite, P. H., Kadane, J. B., and O’Hagan, A. (2005). “Statistical methods for eliciting probability distributions.” J. Am. Stat. Assoc., 100(470), 680–701.
González, V., and Alarcón, L. F. (2010). Uncertainty management in repetitive projects using WIP buffers, Editorial LAMBERT Academic Publishing AG & Co. KG, Germany.
González, V., Alarcón, L. F., Maturana, S., Mundaca, F., and Bustamante, J. (2010). “Improving planning reliability and project performance using the reliable commitment model.” J. Constr. Eng. Manage., 1129–1139.
Graham, L. D., Smith, S. D., and Dunlop, P. (2005). “Lognormal distribution provides an optimum representation of the concrete delivery and placement process.” J. Constr. Eng. Manage., 230–238.
Grubbs, F. E. (1969). “Procedures for detecting outlying observations in samples.” Technometrics, 11(1), 1–21.
Hogg, R. V., McKean, J. W., and Craig, A. T. (2012). Introduction to mathematical statistics, Prentice Hall, Upper Saddle River, NJ.
Hopp, W. J., and Spearman, M. L. (2008). Factory physics, McGraw-Hill, New York.
Houghton, J. C. (1978). “Birth of a parent: The Wakeby distribution for modeling flood flows.” Water Resour. Res., 14(6), 1105–1109.
Howell, D. C. (2012). Statistical methods for psychology, Wadsworth, Belmont, CA.
Jacobs, J. H., Van Bakel, P. P., Etman, L. F. P., and Rooda, J. E. (2006). “Quantifying variability of batching equipment using effective process times.” IEEE Trans. Semicond. Manuf., 19(2), 269–275.
Jodlbauer, H., and Huber, A. (2008). “Service-level performance of MRP, Kanban, CONWIP and DBR due to parameter stability and environmental robustness.” Int. J. Prod. Res., 46(8), 2179–2195.
Johnson, N. L., and Kotz, S. (1970). Continuous univariate distributions, Houghton-Mifflin, Boston, MA.
Kleiber, C., and Kotz, S. (2003). Statistical size distributions in economics and actuarial sciences, Wiley-Interscience, Hoboken, NJ.
Klein, R. W., and Baris, P. M. (1991). “Selecting and generating variates for modeling service times.” Comput. Ind. Eng., 20(1), 27–33.
Kotz, S., Kozubowski, T. J., and Podgorski, K. (2001). The Laplace distribution and generalizations: A revisit with applications to communications, economics, engineering, and finance, Birkhauser, Boston, MA.
Kozubowski, T. J., and Podgórski, K. (2003). “Log-Laplace distributions.” Int. J. Math., 3(4), 467–495.
Lange, F., Herrmann, F., and Claus, T. (2013). “Simulation based clearing functions for a model of order release planning.” The European Conf. on Modelling and Simulation, European Council for Modeling and Simulation, Nottingham, U.K.
Laurendeau, N. M. (2005). Statistical thermodynamics: Fundamentals and applications, Cambridge University Press, Cambridge, U.K.
Law, A. M. (2007). Simulation modeling and analysis, McGraw-Hill, Boston, MA.
Liebsch, C. M. (2003). “Simulation input modeling in the absence of data.” Master of Science, North Carolina State Univ., Raleigh, NC.
MacCrimmon, K. R., and Ryavec, C. A. (1964). “An analytical study of the PERT assumptions.” Oper. Res., 12(1), 16–37.
Maio, C., and Schexnayder, C. (1999). “Simulation model probability distribution functions—Relationships between input data and goodness-of-fit tests.” Autom. Rob. Constr., 1(1), 103–108.
Maio, C., Schexnayder, C., Knutson, K., and Weber, S. (2000). “Probability distribution functions for construction simulation.” J. Constr. Eng. Manage., 285–292.
Martinez, J. C. (2010). “Methodology for conducting discrete-event simulation studies in construction engineering and management.” J. Constr. Eng. Manage., 3–16.
McFarland, J. W., Pettit, R. R., and Sung, S. K. (1982). “The distribution of foreign exchange price changes: Trading day effects and risk measurement.” J. Finance, 37(3), 693–715.
McShane, B., Adrian, M., Bradlow, E. T., and Fader, P. S. (2008). “Count models based on Weibull interarrival times.” J. Bus. Econ. Stat., 26(3), 369–378.
Mosleh, A., and Apostolakis, G. (1984). Models for the use of expert opinions. Low-probability high-consequence risk analysis: Issues, methods, and case studies, Plenum, New York.
Oosterbaan, R. J., and Ritzema, H. P. (1994). Frequency and regression analysis. Drainage principles and applications, 2nd Ed., ILRI, Wageningen, Netherlands, 175–223.
Patil, R., Dey, T., and Shah, J. (2013). “Pricing and lead time competition in the presence of process variability.” Indian Institute of Management Udiapur Research Paper Series, Udaipur, Rajasthan, India.
Pettersen, J.-A., and Segerstedt, A. (2009). “Restricted work-in-process: A study of differences between Kanban and CONWIP.” Int. J. Prod. Econ., 118(1), 199–207.
Pisarenko, V., and Rodkin, M. (2010). Heavy-tailed distributions in disaster analysis, Springer, New York.
Rao, A. R., and Hamed, K. H. (1999). The Wakeby distribution. Flood frequency analysis, CRC Press, Boca Raton, FL.
Rice, J. A. (2007). Mathematical statistics and data analysis, Duxbury Press, Pacific Grove, CA.
Shewhart, W. A. (1939). Statistical method from the viewpoint of quality control, Princeton University Press, Princeton, NJ.
Smith, S. D. (1998). “Concrete placing analysis using discrete-event simulation.” Inst. Civ. Eng. Struct. Build., 128(4), 351–358.
Smith, S. D., Osborne, J. R., and Forde, M. C. (1996). “The use of a discrete-event simulation model with Erlang probability distributions in the estimation of earthmoving production.” Civ. Eng. Syst., 13(1), 25–44.
Stephens, M. A. (1974). “EDF statistics for goodness of fit and some comparisons.” J. Am. Stat. Assoc., 69(347), 730–737.
Synge, J. L. (1957). The relativistic gas, North-Holland Publishing, Amsterdam, Netherlands.
Szu, H., and Hartley, R. (1987). “Fast simulated annealing.” Phys. Lett. A, 122(3–4), 157–162.
Tayfun, M. A. (1980). “Narrow-band nonlinear sea waves.” J. Geophys. Res., 85(C3), 1548–1552.
Thunnissen, D. P. (2003). “Uncertainty classification for the design and development of complex systems.” Third Annual Predictive Methods Conf., Veros Software, Santa Ana, CA.
Touran, A. (1981). “Construction operations data acquisition and processing via time lapse photography interfaced to a minicomputer.” Ph.D. thesis, Stanford Univ., Stanford, CA.
Vose, D. (2008). Risk analysis: A quantitative guide. Wiley, NJ.
Zokaei, K., Seddon, J., and O’Donovan, B. (2011). Systems thinking: From heresy to practice: Public and private sector studies, Palgrave Macmillan, Basingstoke, U.K.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Sep 11, 2013
Accepted: May 27, 2014
Published online: Jul 7, 2014
Published in print: Nov 1, 2014
Discussion open until: Dec 7, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.