Automated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 10
Abstract
In tall-building construction, the equipment-driven table formwork method is a useful alternative for improving productivity of horizontal formwork with less skilled labor. The lifting system significantly affects the productivity and costs of table formwork operation. This study proposes a new system integrated with the construction hoists for automating the lifting process of table formwork. The system targets crane-independent transportation for productivity improvements while overcoming the limitations of the existing independent lifting system, which include high initial cost and extra work for assembly and operation. In a case study, the proposed system showed 49.4% improved productivity over a tower crane, and equipment costs were 73.8% lower than those of the existing independent system. The simplified structure of the system through integration with the hoist could minimize the additional time and cost inputs for its assembly and operation. The proposed system could provide more flexible and stable scheduling at a lower cost in tall-building construction with short cycle times and excessive lifting loads.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research was supported by a grant (Code #09 R&D A01) from the High-Tech Urban Development Program funded by the Ministry of Land, Infrastructure and Transport Affairs of Korea. The authors gratefully acknowledge the support provided to conduct this research from Dong-Joon Jung and Chong-Moon Choi, who are expert engineers in the area of construction hoists.
References
Back, W., Boles, W., and Fry, G. (2000). “Defining triangular probability distributions from historical cost data.” J. Constr. Eng. Manage., 29–37.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations, Wiley, New York.
Hong, T., and Hastak, M. (2007). “Simulation study on construction process of FRP bridge deck panels.” Autom. Constr., 16(5), 620–631.
Huang, R. Y., Chen, J. J., and Sun, K. S. (2004). “Planning gang formwork operations for building construction using simulations.” Autom. Constr., 13(6), 765–779.
Kersting, M., and Girmscheid, G. (2010). “Formwork specific, process oriented geometrical-path-velocity-time-model (GPVT-model).” Proc., 5th Int. Struct. Eng. Constr. Conf., Taylor&Francis Group, London, 635–640.
Kim, K. J., Kim, K., and Lee, S. K. (2009). “Optimization of multiple tower cranes and material stockyards layout.” Kor. J. Constr. Eng. Manage., 10(6), 127–134.
Kim, T. (2013). “Advanced system formwork and construction planning model for tall building construction.” Doctoral dissertation, Korea Univ., Seoul.
Kim, T., Lim, H., Lee, U. K., Cha, M., Cho, H., and Kang, K. I. (2012). “Advanced formwork method integrated with a layout planning model for tall building construction.” Can. J. Civ. Eng., 39(11), 1173–1183.
Kumho E&C. (2009). Starcity Project: ‘A Block’ Construction Rep. (Technical Data), Smart Design, Seoul.
Kwon, J. B., Lim, H. S., Kim, T., Cha, M. S., Cho, H., and Kang, K. I. (2013). “Productivity analysis of the table formwork method for making a cost-efficient equipment input plan.” Proc., 30th Int. Symp. on Automation and Robotics in Construction and Mining, IAARC, Bratislava.
Lee, J. H. (2006). “The development of performance analysis model based on research and development process of automated construction machines.” Doctoral dissertation, Inha Univ., Incheon, Korea.
Lim, H., Kim, T., Cho, H., and Kang, K. I. (2013). “Formwork productivity analysis model for cost-efficient equipment operations.” Proc., 5th Int. Conf. on Construction Engineering and Project Management, KICEM, Seoul.
Ling, Y. Y., and Leo, K. C. (2000). “Reusing timber formwork: Importance of workmen’s efficiency and attitude.” Build. Environ., 35(2), 135–143.
Luo, R. Y., and Najafi, M. (2007). “Productivity study of microtunneling pipe installation using simulation.” J. Infrastruct. Syst., 247–260.
MIDAS Gen 2013 version 1.1 [Computer software]. MIDAS Information Technology, Seongnam-si, Gyeonggi-do.
Ministry of Employment and Labor. (2012). “Safety certificate criteria for dangerous machinery and equipment.” 〈http://www.moel.go.kr/view.jsp?cate=3&sec=1&smenu=4&div_cd=&mode=view&bbs_cd=116&seq=1334713202874&page=1&state=A〉 (Sep. 27, 2013).
Proverbs, D. G., Holt, G. D., and Olomolaiye, P. (1998). “Factors impacting construction project duration: A comparison between France, Germany and the UK.” Build. Environ., 34(2), 197–204.
Ryff, P. F. (1988). Electric machinery, Prentice-Hall, Englewood Cliffs, NJ.
Zhang, P., Harris, F. C., Olomolaiye, P. O., and Holt, G. D. (1999). “Location optimization for a group of tower cranes.” J. Constr. Eng. Manage., 115–122.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Nov 21, 2013
Accepted: Apr 17, 2014
Published online: Jun 24, 2014
Published in print: Oct 1, 2014
Discussion open until: Nov 24, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.