Validation Methodologies and Their Impact in Construction Productivity Research
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 10
Abstract
Choosing validation methods in construction research is challenging. This study explores trends in the use of validation methods and their impacts based on a statistical analysis of a sample set of 365 research articles on construction productivity. This sample set provides a balance of the breadth and cohesion required for significant comparisons and the temporal depth required for longitudinal analysis. The contributions of this research include (1) a critical review of the validation methodologies that can be used for research projects in construction engineering and management, (2) an investigation of the statistical relationship between validation methods and the impact in terms of citations of research over time in different source categories, and (3) statistically significant observations over the preceding thirty years of the increased use of functional demonstration as a validation methodology and the decreased existence of unclear validation. These results may be used in the future to influence the choice of validation methods to increase the impact of construction productivity research.
Get full access to this article
View all available purchase options and get full access to this article.
References
Abowitz, D., and Toole, T. (2010). “Mixed method research: Fundamental issues of design, validity, and reliability in construction research.” J. Constr. Eng. Manage., 108–116.
Azhar, S., Ahmad, I., and Sein, M. (2010). “Action research as a proactive research method for construction engineering and management.” J. Constr. Eng. Manage., 87–98.
Babbie, E. R. (1973). Survey research methods, Wadsworth, Belmont, CA.
Bernold, L. E., and Lee, T. S. (2010). “Experimental research in construction.” J. Constr. Eng. Manage., 26–35.
Burbank, J., Kasch, W., and Ward, J. (2011). An introduction to network modeling and simulation for the practicing engineer, Wiley, Hoboken, NJ.
CII Research Team 252. (2009). Craft productivity program, Phase I Research Rep., Construction Industry Institute, Univ. of Texas at Austin, Austin, TX.
CII Research Team 252. (2011). Craft productivity program, Phase III Research Rep., Construction Industry Institute, Univ. of Texas at Austin, Austin, TX.
CII Research Team 252. (2013). The productivity handbook, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX.
Dai, J., Goodrum, P. M., Maloney, W. F., and Srinivasan, C. (2009). “Latent structures of the factors affecting construction labor productivity.” J. Constr. Eng. Manage., 397–406.
Denzin, N. K., and Lincoln, Y. S. (1944). Handbook of qualitative research, Sage, Thousand Oaks, CA.
DiNardo, J. (2008). The new Palgrave dictionary of economics, Palgrave Macmillan, Basingstoke, Hampshire, U.K.
European Medicines Agency. (2006). Validation of analytical procedures, London.
Fellows, R., and Liu, A. (2008). Research methods for construction, Wiley-Blackwell, Oxford, U.K.
Flood, I., and Issa, R. R. (2010). “Empirical modeling methodologies for construction.” J. Constr. Eng. Manage., 36–48.
Gibson, G., and Whittington, D. (2010). “Charrettes as a method for engaging industry in best practices research.” J. Constr. Eng. Manage., 66–75.
Green, S., Kao, C., and Larsen, G. (2010). “Contextualist research: Iterating between methods while following an empirically grounded approach.” J. Constr. Eng. Manage., 117–126.
Groves, R. M. (1989). Survey errors and survey costs, Wiley-Interscience, Hoboken, NJ.
Hallowell, M., and Gambatese, J. (2010). “Qualitative research: Application of the Delphi method to CEM research.” J. Constr. Eng. Manage., 99–107.
Hammersly, M., and Gomm, R. (1997). “Bias in social research.” Soc. Res. Online, 〈http://socresonline.org.uk/2/1/2.html〉.
Hornby, A. S., Gatenby, E. V., and Wakefield, H. (1963). Advanced learner’s dictionary of current English, Oxford University Press, London.
Leedy, P. D. (1980). Practical research: Planning and design, Macmillan, New York.
Leicht, R. M., Hunter, S. T., Saluja, C., and Messner, J. I. (2010). “Implementing observational research methods to study team performance in construction management.” J. Constr. Eng. Manage., 76–86.
Liu, J. (2013). “Validation methodologies for construction engineering and management research.” Master of Applied Science thesis rep. in Civil Engineering, Univ. of Waterloo, Waterloo, ON.
Lucko, G., and Mitchell, Z. W. (2010). “Quantitative research: Preparation of incongruous economic data sets for archival data analysis.” J. Constr. Eng. Manage., 49–57.
Lucko, G., and Rojas, E. M. (2010). “Research validation: Challenges and opportunities in the construction domain.” J. Constr. Eng. Manage., 127–135.
Martinez, J. (2010). “Methodology for conducting discrete-event simulation studies in construction engineering and management.” J. Constr. Eng. Manage., 3–16.
Mitchell, Z. W. (1998). “Statistical analysis of construction equipment repair costs using field data and the cumulative cost model.” Ph.D. thesis, Civil Engineering, Virginia Polytechnic Institute, Blacksburg, VA, 〈http://scholar.lib.vt.edu/theses/public/etd-32998-134834/materials/zmitchel.pdf〉.
Petty, M. D. (2009). “Verification and validation.” J. A. Sokolowski and C. M. Banks, eds., Principles of modeling and simulation, Wiley, Hoboken, NJ, 121–149.
Phelps, A., and Horman, M. (2010). “Ethnographic theory-building research in construction.” J. Constr. Eng. Manage., 58–65.
Popper, K. R. (1965). Conjectures and refutations: The growth of scientific knowledge, Basic Books, New York.
Sapsford, R. (2007). Survey research, Sage, London, Thousand Oaks, CA.
Sen, R., and Patel, P. (2012). “Citation rates of award-winning ASCE papers.” J. Prof. Issues Eng. Educ. Pract., 107–113.
Shahi, A., Haas, C., West, J., and Akinci, B. (2014). “Workflow-based construction research data management and dissemination.” J. Comput. Civ. Eng., 244–252.
Stake, R. E. (1995). The art of case study research, Sage, Thousand Oaks, CA.
Taylor, J. E., and Jaselskis, E. J. (2010). “Introduction to the special issue on research methodologies in construction engineering and management.” J. Constr. Eng. Manage., 1–2.
Thompson, J. R. (1989). Empirical model building, Wiley, New York.
Wang, Y., Goodrum, P. M., Haas, C. T., and Glover, R. W. (2008). “Craft training issues in American industrial and commercial construction.” J. Constr. Eng. Manage., 795–803.
Yin, R. K. (1989). Case study research: Design and methods, Sage, Newbury Park, CA.
Yin, R. K. (2003). Case study research: Design and methods, 3rd Ed., Sage, Thousand Oaks, CA.
Zhai, D., Goodrum, P. M., Haas, C. T., and Caldas, C. H. (2009). “Relationship between automation and integration of construction information systems and labor productivity.” J. Constr. Eng. Manage., 746–753.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Aug 20, 2013
Accepted: Apr 17, 2014
Published online: Jun 19, 2014
Published in print: Oct 1, 2014
Discussion open until: Nov 19, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.