Technical Papers
Jan 8, 2014

Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats

Publication: Journal of Construction Engineering and Management
Volume 140, Issue 5

Abstract

Construction project performance is significantly reliant on the effective communication of the project’s design to the end construction worker. Spatial design is frequently represented in two-dimensional (2D) drawings of various views. These views must be combined and decoded by the end user to effectively understand all orientations of a building element and can lead to errors. Advances in three-dimensional computer-aided design (3D CAD) and 3D printing have provided promising advancements in the presentation of spatial engineering information. This research investigates cognitive-workload demands of each information format. Cognitive workload is the amount of mental resources required to complete a task from the total available mental resources. Asking subjects to complete a reconstructing task of a simple structure using 2D drawings, a 3D CAD interface, and a 3D printed model introduces the individuals to alternative forms of information presentation. After completing the task, the subjects were surveyed on their perceptions of mental workload in six main factors using the NASA Task Load Index (TLX). Through a statistical analysis, there was no difference in mental workload between the three types of information presentation, indicating that the cognitive demands of the mediums are similar. However, there were statistically significant differences in workload factors due to demographic influences, such as occupation and CAD experience levels. In addition, mental workload affected the subject’s productivity in task completion. The primary contribution to the overall body of knowledge is the investigation of mental workload as a factor in spatial understanding, and more specifically, identifying cognitive demands of individuals when presented with spatial engineering information in various formats.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors acknowledge the University of Kentucky Construction Engineering and Project Management Advisory Board for the support and input to the study. Furthermore, the study would not have been possible without the time and commitment of the participating construction craft workers and their companies.

References

Byers, J. C., Bittner, A. C., Jr., and Hill, S. G. (1989). “Traditional and raw task load index (TLX) correlations: Are paired comparisons necessary?” Advances in industrial ergonomics and safety, A. Mita, ed., Taylor and Francis, Philadelphia, PA, 481–485.
Carswell, C. M., et al. (2010). “Hands-free administration of subjective workload scales: Acceptability in a surgical training environment.” Appl. Ergonom., 42(1), 138–145.
Carswell, C. M., Clarke, D., and Seales, W. B. (2005). “Assessing mental workload during laparoscopic surgery.” Surg. Innovat., 12(1), 80–90.
Dai, J., Goodrum, P. M., and Maloney, W. F. (2009a). “Construction craft workers’ perceptions of the factors affecting their productivity.” J. Constr. Eng. Manage., 217–226.
Dai, J., Goodrum, P. M., Maloney, W. F., and Srinivasan, C. (2009b). “Latent structures of the factors affecting construction labor productivity.” J. Constr. Eng. Manage., 397–406.
Dielman, T. E. (2005). Applied regression analysis: A second course in business and economic statistics, 4th Ed., South-Western Cengage Learning, Mason, OH.
Ellis, S. R., McGreevy, M. W., and Hitchcock, R. J. (1987). “Perspective traffic display format and airline pilot traffic avoidance.” Hum. Factors, 29(4), 371–382.
Fellows, R., and Liu, A. (2008). Research methods for construction, 3rd Ed., Wiley-Blackwell Publishing, Malden, MA.
Goodrum, P. M., and Dai, J. (2006). “Work force view of construction productivity.” Research Summary 215-1, The Construction Industry Institute, Univ. of Texas, Austin, TX.
Hart, S. G. (2006). “NASA-task load index (NASA-TLX): 20 years later.” Proc., Human Factors and Ergonomics 50th Annual Meeting, Human Factors and Ergonomics Society, Santa Monica, CA, 904–908.
Hart, S. G., and Staveland, L. E. (1988). “Development of the NASA-TLX (Task Load Index): Results of empirical and theoretical research.” Human Mental Workload, 1(3), 139–183.
Knowles, W. B. (1963). “Operator loading tasks.” Hum. Factors, 5(2), 155–161.
Mitropoulos, P., and Memarian, B. (2013). “Task demands in masonry work: Sources, performance implications and management strategies.”J. Constr. Eng. Manage., 581–590.
Moroney, W. F., Biers, D. W., and Eggemeier, F. T. (1995). “Some measurement and methodological considerations in the application of subjective workload measurement techniques.” Int. J. Aviation Psychol., 5(1), 87–106.
Moroney, W. F., Biers, D. W., Eggemeier, F. T., and Mitchell, J. A. (1992). “A comparison of two scoring procedures with the NASA Task Load Index in a simulated flight tasks.” Proc., IEEE 1992 National Aerospace and Electronics Conf. (NAECON), 734–740.
Naiker, N., Skinner, M., Leung, Y., and Pearce, B. (1998). “Technologies for enhancing situation awareness in aviation systems: Perspective display research.”, Air Operations Division, Aeronautical and Maritime Research Laboratory, Defense Science and Technology Organization, Melbourne, Australia.
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
Recarte, M. A., and Nunes, L. M. (2003). “Mental workload while driving: Effects on visual search, discrimination, and decision making.” J. Exp. Psychol. Appl., 9(2), 119–137.
Zacharatos, A., Barling, J., and Iverson, R. D. (2005). “High performance work systems and occupational safety.” J. Appl. Psych., 90(1), 77–93.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 5May 2014

History

Received: Sep 5, 2013
Accepted: Dec 4, 2013
Published online: Jan 8, 2014
Published in print: May 1, 2014
Discussion open until: Jun 8, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Gabriel B. Dadi [email protected]
M.ASCE
Assistant Professor, Dept. of Civil Engineering, 151C Raymond Building, Univ. of Kentucky, Lexington, KY 40506-0281 (corresponding author). E-mail: [email protected]
Paul M. Goodrum
M.ASCE
Nicholas R. Petry Professor, Construction Engineering and Management, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, Boulder, CO 80309-0428.
Timothy R. B. Taylor
M.ASCE
Assistant Professor, Dept. of Civil Engineering, 151A Raymond Building, Univ. of Kentucky, Lexington, KY 40506-0281.
C. Melody Carswell
Professor, Dept. of Psychology and Center for Visualization and Virtual Environments, Univ. of Kentucky, Lexington, KY 40506-0281.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share