Technical Papers
Feb 26, 2014

Lean Design Process

Publication: Journal of Construction Engineering and Management
Volume 140, Issue 6

Abstract

Improper design in the construction industry leads to change orders, rework, decreased constructability, cost overruns, and delays, making it one of the biggest causes of waste. The writers aim to develop a lean design process to enhance design reliability by creating a learning environment using the design correctness ratio. Waste is first identified by analyzing the planning and design processes. A new design workflow is then proposed using lean concepts to smooth design work, reduce unnecessary design errors, and increase design reliability. The proposed process can provide team members with feedback on design status and thus allow for continuous improvement. The lean process is conceptualized using system dynamics to validate applicability. Analysis shows that the proposed lean design process can enhance design completeness and reliability, thus increasing design correctness. Waste due to improper design could be reduced accordingly. The proposed process is one of the first to apply the lean approach to construction-project design.

Get full access to this article

View all available purchase options and get full access to this article.

References

Abdelsalam, S. S., Sritharan, S., and Suleiman, M. T. (2010). “Current design and construction practices of bridge pile foundations with emphasis on implementation of LRFD.” J. Bridge Eng., 749–758.
Azhar, S. (2011). “Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry.” Leadership Manage. Eng., 241–252.
Barber, K. S., Graser, T., and Holt, J. (2003). “Evaluating dynamic correctness properties of domain reference architectures.” J. Syst. Softw., 68(3), 217–231.
Barrow, H. G. (1984). “Verify: A program for proving correctness of digital hardware designs.” Artif. Intell., 24(1), 437–491.
Breit, M., Vogel, M., Häubi, F., Märki, F., and Raps, M. (2008). “4D design and simulation technologies and process design patterns to support lean construction methods.” Tsinghua Sci. Technol., 13(1), 179–184.
Bynum, P., Issa, R. R. A., and Olbina, S. (2013). “Building information modeling in support of sustainable design and construction.” J. Constr. Eng. Manage., 24–34.
Chen, H. Y. (2009). “First time correctness ratio–A quality measure applied on engineering design”, M.S. thesis, National Cheng Kung Univ., Tainan City, Taiwan (in Chinese).
Ekenberg, L., and Johannesson, P. (2004). “A framework for determining design correctness.” Knowl.-Based Syst., 17(7), 249–262.
Forrester, J. W. (1961). Industrial dynamics, Pegasus Communications, New York.
Freire, J., and Alarcón, L. F. (2002). “Achieving lean design process: Improvement methodology.” J. Constr. Eng. Manage., 248–256.
Gould, F., and Joyce, N. (2009). Construction project management, 3rd Ed., Prentice Hall, Upper Saddle River, NJ.
Grilo, A., and Jardim-Goncalves, R. (2010). “Value proposition on interoperability of BIM and collaborative working environments.” Autom. Constr., 19(5), 522–530.
Günhan, S., Arditi, D., and Doyle, J. (2007). “Avoiding change orders in public school construction.” J. Prof. Issues Eng. Educ. Pract., 67–73.
Hino, S. (2005). Inside the mind of Toyota: Management principles for enduring growth, Productivity Press, New York.
Josephson, P. E., Larsson, B., and Li, H. (2002). “Illustrative benchmarking rework and rework costs in Swedish construction industry.” J. Manage. Eng., 76–83.
Karnopp, D. C., Margolis, D. L., and Rosenberg, R. C. (2012). System dynamics: Modeling, simulation, and control of mechatronic systems, Wiley, Hoboken, NJ.
Kawamura, S. (2000). Integrated design and operation of water treatment facilities, Wiley, Hoboken, NJ.
Ko, C. H. (2010a). “An integrated framework for reducing precast fabrication inventory.” J. Civ. Eng. Manage., 16(3), 418–427.
Ko, C. H. (2010b). “Application of lean production system in the construction industry: An empirical study.” J. Eng. Appl. Sci., 5(2), 71–77.
Ko, C. H. (2011). “Production control in precast fabrication: Considering demand variability in production schedules.” Can. J. Civ. Eng., 38(2), 191–199.
Ko, C. H., Wang, W. C., and Kuo, J. D. (2011). “Improving formwork engineering using the Toyota way.” J. Eng. Proj. Prod. Manage., 1(1), 13–27.
Koskela, L. (1992). “Application of the new production philosophy to construction.”, Stanford Univ., Stanford, CA.
Krafcik, J. F. (1988). “Triumph of the lean production system.” Sloan Manage. Rev., 30(1), 41–52.
Li, H., et al. (2008). “Integrating design and construction through virtual prototyping.” Auto. Constr., 17(8), 915–922.
Liker, J. K. (2004). The Toyota way: 14 management principles from the world’s greatest manufacturer, McGraw Hill, New York.
Lin, L. H. (2009). “The impact of integration strategy on organisational innovation and growth in the global automotive industry.” Int. J. Auto. Technol. Manage., 9(1), 54–68.
Mendelsohn, R. (1997). “The constructability review process: A contractor’s perspective.” J. Manage. Eng., 13(3), 17–19.
Motawa, I. A., Anumba, C. J., Lee, S., and Peña-Mora, F. (2007). “An integrated system for change management in construction.” Automat. Constr., 16(3), 368–377.
Nylen, K. O. (1996). “Cost of failure in a major civil engineering project.” Licentiate thesis, Royal Institute of Technology, Stockholm, Sweden.
Ohno, T. (1988). Toyota production system, Productivity Press, New York.
Palm, W. J. (2009). System dynamics, McGraw-Hill, New York.
Pulaski, M. H., and Horman, M. J. (2005). “Organizing constructability knowledge for design.” J. Constr. Eng. Manage., 911–919.
Riet, R. P. (2008). “Twenty-five years of Mokum: For 25 years of data and knowledge engineering: Correctness by design in relation to MDE and correct protocols in cyberspace.” Data Knowl. Eng., 67(2), 293–329.
Riley, D. R., Diller, B. E., and Kerr, D. (2005). “Effects of delivery systems on change order size and frequency in mechanical construction.” J. Constr. Eng. Manage., 953–962.
Sandecki, T. (1998). “Innovative approaches to highway geometric design in Poland.” Transportation Research Circular E-C003, Transportation Research Board, Washington, DC, 1–7.
Senge, P. M. (1990). The fifth discipline: The art and practice of the learning organization, Bantam Dell, New York.
Soibelman, L., Liu, L. Y., Kirby, J. G., East, E. W., Caldas, C. H., and Andlin, K. Y. (2003). “Design review checking system with corporate lessons learned.” J. Constr. Eng. Manage., 475–484.
Womack, J. P., and Jones, D. T. (2003). Lean thinking: Banish waste and create wealth in your corporation, Revised and updated, Free Press.
Womack, J. P., Jones, D. T., Ross, D., and Carpenter, D. S. (1990). The machine that changed the world: The story of Lean production, McGraw Hill, New York.
Wu, S., Blos, M. F., Wee, H. M., and Chen, Y. L. (2010). “Can the Toyota way overcome the recent Toyota setback? A study based on the theory of constraints.” J. Adv. Manuf. Syst., 9(2), 145–156.
Yeh, M. H. (2004). “A study on the combination of the interface between design and construction.” M.S. thesis, National Yunlin Univ. of Science and Technology (in Chinese).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 6June 2014

History

Received: Nov 11, 2012
Accepted: Nov 21, 2013
Published online: Feb 26, 2014
Published in print: Jun 1, 2014
Discussion open until: Jul 26, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Chien-Ho Ko [email protected]
Professor, Dept. of Civil Engineering, National Pingtung Univ. of Science and Technology, 1 Shuefu Rd., Neipu, Pingtung 91201, Taiwan (corresponding author). E-mail: [email protected]
Neng-Fu Chung [email protected]
Research Assistant, Dept. of Civil Engineering, National Pingtung Univ. of Science and Technology, 1 Shuefu Rd., Neipu, Pingtung 91201, Taiwan. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share