Occupational Risk Index for Assessment of Risk in Construction Work by Activity
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 1
Abstract
The concern for occupational health and safety in construction work is reflected in the many preventive measures taken. However, examples of the systematic assessment of project alternatives aimed at minimizing occupational hazards are rare. This paper proposes a measure of occupational safety [occupational risk index (ORI)] that is based solely on the project design and resulting construction process, and is a function of the activities carried out and their specific occupational risk (probability and consequences of occurrence). The ORI can thus be used as an indicator to feed multicriteria decision-analysis tools. The proposal is illustrated with a simple example in which two alternatives (one precast and the other constructed in situ) are prioritized in terms of occupational safety, and certain aspects related to redesign are briefly addressed. With the ORI, occupational safety goes from having a passive influence (application to projects that have already been designed) to an active one (influence on the design concept itself) in the design stage of construction projects. The research is based on an analysis of the applicable legislation and interviews with experts.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors gratefully acknowledge the financial support received from the Spanish Ministry of Economy and Competitiveness; one of the authors also benefited from a research staff training grant under the BIA2006-15471-C02-01 project. The authors would further like to express their gratitude to the Spanish Civil Engineer Association and the Bosch Potensà Private Foundation for supporting this research. Finally, the authors would like to thank the health and safety experts María Ángeles Horna, Mónica Pérez and, especially, José Hernández Paterna for their invaluable contribution.
References
Ahmed, A., Kayis, B., and Amornsawadwatana, S. (2007). “A review of techniques for risk management in projects.” Benchmark. Int. J., 14(1), 22–36.
Akintoye, A. S., and MacLeod, M. J. (1997). “Risk analysis and management in construction.” Int. J. Proj. Manage., 15(1), 31–38.
Armengou, J., Aguado, A., and Ormazábal, G. (2012). “Sistema integrado para toma de decisiones en el diseño de estructuras de hormigón.” Inf. Constr., 64(527), 391–400.
Cooper, D., and Chapman, C. (1987). Risk analysis for large projects: Models, methods and cases, Wiley, New York.
Fine, W. T. (1971). “Mathematical evaluation for controlling hazards.” J. Saf. Res., 3(4), 157–166.
Hallowell, M., and Gambatese, J. (2010). “Qualitative research: Application of the Delphi method to CEM research.” J. Constr. Eng. Manage., 136(1), 99–107.
Instituto Nacional de Seguridad e Higiene en el Trabajo. (2009). Guía técnica para la evaluación y prevención del riesgo eléctrico: Real Decreto 614/2001, de 8 de junio, BOE nº148, de 21 de junio, Instituto Nacional de Seguridad e Higiene en el Trabajo, Madrid, Spain.
Jaselskis, E. J., Anderson, S. D., and Russel, J. S. (1996). “Strategies for achieving excellence in construction safety performance.” J. Constr. Eng. Manage., 122(1), 61–70.
Ministerio de la Presidencia. (2001). “Real Decreto 614/2001, de 8 de junio, sobre disposiciones mínimas para la protección de la salud y seguridad de los trabajadores frente al riesgo eléctrico.” Boletín Oficial del Estado, 148, 21970–21977.
Ormazabal, G., Viñolas, B., and Aguado, A. (2008). “Enhancing value in crucial decisions: Line 9 of the Barcelona subway.” J. Manage. Eng., 24(4), 265–272.
Perry, J. G., and Hayes, R. W. (1985). “Risk and its management in construction projects.” ICE Proc., 78(3), 499–521.
Pons, O., and Aguado, A. (2012). “Integrated value model for sustainable assessment applied to technologies used to build schools in Catalonia, Spain.” Build. Environ., 53, 49–58.
Rajendran, S., and Gambatese, J. A. (2009). “Development and initial validation of sustainable construction safety and health rating system.” J. Constr. Eng. Manage., 135(10), 1067–1075.
Seo, J. W., and Choi, H. H. (2008). “Risk-based safety impact assessment methodology for underground construction projects in Korea.” J. Constr. Eng. Manage., 134(1), 72–81.
Sun, Y., Fang, D., Wang, S., Dai, M., and Lv, X. (2008). “Safety risk identification and assessment for Beijing Olympic venues construction.” J. Manage. Eng., 24(1), 40–47.
Tah, J. H. M., and Carr, V. (2001). “Towards a framework for project risk knowledge management in the construction supply chain.” Adv. Eng. Softw., 32(10–11), 835–846.
Tam, C. M., Tong, T. K. L., Chiu, G. G. W., and Fung, I. W. H. (2002). “Non-structural fuzzy decision support system for evaluation of construction safety management system.” Int. J. Proj. Manage., 20(4), 303–313.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Received: Mar 8, 2013
Accepted: Aug 13, 2013
Published online: Sep 6, 2013
Published in print: Jan 1, 2014
Discussion open until: Feb 6, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation