Boosting Public Construction Project Outcomes through Relational Transactions
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 1
Abstract
Drawing upon relational contract (RC) theory and network embeddedness theory, this study investigates how relational transactions (i.e., RC norms and network strategies) affect relationship quality and outcomes of public construction projects. The results of a questionnaire survey of 104 public projects in Singapore show that relationship quality and relational transactions have a positive impact on public project outcomes (i.e., time, cost, quality performance, and client satisfaction). The empirical results show that effective information sharing gives rise to better relationship quality, and good relationships further enhance time performance, quality performance, and client satisfaction. The findings show that adoption of these RC norms affects outcomes in the following ways: (1) propriety of means contributes significantly to cost performance, (2) flexibility and contractual solidarity have a significant impact on time performance, and (3) harmonization within the social matrix and propriety of means allow for a significantly higher level of satisfaction. This study contributes to the body of knowledge by empirically showing that good relationship quality can contribute to better outcomes in public construction projects. It also identifies RC norms that have a positive effect on public project outcomes and relationship quality. Recommendations of relational transaction practices that could improve public project outcomes are offered.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research was supported by the Singapore Ministry of Education’s Academic Research Fund Tier 2 funding (Grant MOE2009-T2-2-067) for the project “Boosting Public Construction Project Outcomes through Relational Transactions.” Dr. Yongjian Ke’s assistance in the questionnaire design is gratefully acknowledged.
References
Akintoye, A., and Main, J. (2007). “Collaborative relationships in construction: The UK contractors’ perception.” Eng. Construct. Architect. Manage., 14(6), 597–617.
Azoulay, P., Repenning, N. P., and Zuckerman, E. W. (2010). “Nasty, brutish, and short: Embeddedness failure in the pharmaceutical industry.” Admin. Sci. Q., 55(3), 472–507.
Bagozzi, R. P., and Yi, Y. (1988). “On the evaluation of structural equation models.” J. Acad. Market. Sci., 16(1), 74–94.
Baker, G., Gibbons, R., and Murphy, K. J. (2002). “Relational contracts and the theory of the firm.” Q. J. Econ., 117(1), 39–84.
Bird, R. C. (2005). “Employment as a relational contract.” J. Labor Employ. Law, 8(1), 149–217.
Black, C., Akintoye, A., and Fitzgerald, E. (2000). “An analysis of success factors and benefits of partnering in construction.” Int. J. Project Manage., 18(6), 423–434.
Blois, K. J. (2002). “Business to business exchanges: A rich descriptive apparatus derived from Macneil’s and Menger’s analyses.” J. Manage. Stud., 39(4), 523–551.
Bresnen, M., and Marshall, N. (2000). “Partnering in construction: A critical review of issues, problems and dilemmas.” Constr. Manage. Econ., 18(2), 229–237.
Chan, A. P. C., Chan, D. W. M., Chiang, Y. H., Tang, B. S., Chan, E. H. W., and Ho, K. S. K. (2004). “Exploring critical success factors for partnering in construction projects.” J. Constr. Eng. Manage., 130(2), 188–198.
Chan, A. P. C., Chan, D. W. M., Fan, L. C. N., Lam, P. T. I., and Yeung, J. F. Y. (2008). “Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong.” J. Manage. Eng., 24(3), 128–137.
Chen, C. T., and Chen, T. T. (2007). “Critical success factors for construction partnering in Taiwan.” Int. J. Project Manage., 25(5), 475–484.
Cheng, E. W. L., and Li, H. (2001). “Development of a conceptual model of construction partnering.” Eng. Construct. Architect. Manage., 8(4), 292–303.
Cheng, E. W. L., Li, H., and Love, P. E. D. (2000). “Establishment of critical success factors for construction partnering.” J. Manage. Eng., 16(2), 84–92.
Chinowsky, P. S., Diekmann, J., and Galotti, V. (2008). “Social network model of construction.” J. Constr. Eng. Manage., 134(10), 804–812.
Chinowsky, P. S., Diekmann, J., and O’Brien, J. (2010). “Project organizations as social networks.” J. Constr. Eng. Manage., 136(4), 452–458.
Chowdhury, A. N., Chen, P. H., and Tiong, R. L. K. (2011). “Analysing the structure of public-private partnership projects using network theory.” Constr. Manage. Econ., 29(3), 247–260.
Dekker, H. C., and Abbeele, A. V. (2010). “Organizational learning and interfirm control: The effects of partner search and prior exchange experiences.” Organiz. Sci., 21(6), 1233–1250.
Ebbers, J. J., and Wijnberg, N. M. (2009). “Latent organizations in the film industry: Contracts, rewards and resources.” Hum. Relat., 62(7), 987–1009.
Eisenhardt, K. M. (1985). “Control: Organizational and economic approaches.” Manage. Sci., 31(2), 134–149.
Ei-Sheikh, A., and Pryke, S. D. (2010). “Network gaps and project success.” Constr. Manage. Econ., 28(12), 1205–1217.
Fornell, C. G., and Larcker, D. F. (1981). “Evaluating structural equation models with unobservable variables and measurement error.” J. Market. Res., 18(1), 39–50.
Granovetter, M. S. (1985). “Economic action and social structure: The problem of embeddedness.” Am. J. Sociol., 91(3), 481–510.
Granovetter, M. S. (1992). “Economic institutions as social constructions: A framework for analysis.” Acta Sociologica, 35(1), 3–11.
Gulati, R. (1999). “Network location and learning: The influence of network resources and firm capabilities on alliance formation.” Strategic Manage. J., 20(5), 397–420.
Hair, J. F., Ringle, C. M., and Sarstedt, M. (2011). “PLS-SEM: Indeed a silver bullet.” J. Market. Theory Pract., 19(2), 139–151.
Halman, J. I. M., and Braks, B. F. M. (1999). “Project alliancing in the offshore industry.” Int. J. Project Manage., 17(2), 71–76.
Henseler, J., Ringle, C. M., and Sinkovics, R. R. (2009). “The use of partial least squares path modeling in international marketing.” New challenges to international marketing (advances in international marketing), R. R., Sinkovics and P. N., Ghauri, eds., Vol. 20, Emerald Group, Bradford, UK, 277–319.
Hulland, J. (1999). “Use of partial least squares (PLS) in strategic management research: A review of four recent studies.” Strategic Manage. J., 20(2), 195–204.
Jap, S. D., and Ganesan, S. (2000). “Control mechanisms and the relationship life cycle: Implications for safeguarding specific investments and developing commitment.” J. Market. Res., 37(2), 227–245.
Jones, C., Hesterly, W. S., and Borgatti, S. P. (1997). “A general theory of network governance: Exchange conditions and social mechanisms.” Acad. Manage. Rev., 22(4), 911–945.
Kumaraswamy, M. M., Ling, F. Y. Y., Rahman, M. M., and Phng, S. T. (2005). “Constructing relationally integrated teams.” J. Constr. Eng. Manage., 131(10), 1076–1086.
Kumaraswamy, M. M., and Matthews, J. D. (2000). “Improved subcontractor selection employing partnering principles.” J. Manage. Eng., 16(3), 47–57.
Ling, F. Y. Y., and Li, S. (2012). “Using social network strategy to manage construction projects in China.” Int. J. Proj. Manage., 30(2), 398–406.
Ling, F. Y. Y., Low, S. P., Wang, S. Q., and Egbelakin, T. (2008). “Models for predicting project performance in China using project management practices adopted by foreign AEC firms.” J. Constr. Eng. Manage., 134(12), 983–990.
Ling, F. Y. Y., Low, S. P., Wang, S. Q., and Lim, H. H. (2009). “Key project management practices affecting Singaporean firms’ project performance in China.” Int. J. Project Manage., 27(1), 59–71.
Ling, F. Y. Y., Rahman, M. M., and Ng, T. L. (2006). “Incorporating contractual incentives to facilitate relational contracting.” J. Prof. Issues Eng. Educ. Pract., 132(1), 57–66.
Ling, F. Y. Y., and Tran, P. Q. (2012). “Effects of interpersonal relations on public construction contracts in Vietnam.” Constr. Manage. Econ., 30(12), 1087–1101.
Love, P. E. D., Mistry, D., and Davis, P. R. (2010). “Price competitive alliance projects: identification of success factors for public clients.” J. Constr. Eng. Manage., 136(9), 947–956.
Macneil, I. R. (1978). “Contracts: Adjustments of long-term economic relations under classical, neoclassical and relational contract law.” Northwestern Univ. Law Rev., 72(6), 854–906.
Macneil, I. R. (1985). “Relational contract: what we do and do not know.” Wisconsin Law Rev., 31(4), 483–526.
Macneil, I. R. (1986a). “Exchange revisited: Individual utility and social solidarity.” Ethics, 96(3), 567–593.
Macneil, I. R. (2000). “Contracting worlds and essential contract theory.” Soc. Leg. Stud., 9(3), 431–438.
Macneil, R. W. (1986b). “Contract in China: Law, practice, and dispute resolution.” Stanford Law Rev., 38(2), 303–397.
Malhotra, D., and Lumineau, F. (2011). “Trust and collaboration in the aftermath of conflict: The effects of contract structure.” Acad. Manage. J., 54(5), 981–998.
Mariotti, F., and Delbridge, R. (2011). “Overcoming network overload and redundancy in inter-organizational networks: The roles of potential and latent ties.” Organiz. Sci., 23(2), 511–530.
Mellewigt, T., Madhok, A., and Weibel, A. (2007). “Trust and formal contracts in inter-organizational relationships—Substitutes and complements.” Managerial Decis. Econ., 28(8), 833–847.
Powell, W. W. (1990). “Neither market nor hierarchy: Network forms of organization.” Research in organizational behavior, B. M., Staw, and L. L., Cummings, eds., 12, JAI Press, Greenwich, CT, 295–336.
Rahman, M. M., and Kumaraswamy, M. M. (2002). “Joint risk management through transactionally efficient relational contracting.” Constr. Manage. Econ., 20(1), 45–54.
Rahman, M. M., and Kumaraswamy, M. M. (2004a). “Potential for implementing relational contracting and joint risk management.” J. Manage. Eng., 20(4), 178–189.
Rahman, M. M., and Kumaraswamy, M. M. (2004b). “Contracting relationship trends and transitions.” J. Manage. Eng., 20(4), 147–161.
Rahman, M. M., and Kumaraswamy, M. M. (2005). “Assembling integrated project teams for joint risk management.” Constr. Manage. Econ., 23(4), 365–375.
Rahman, M. M., and Kumaraswamy, M. M. (2008). “Relational contracting and teambuilding: Assessing potential contractual and non-contractual incentives.” J. Manage. Eng., 24(1), 48–63.
Reinartz, W., Haenlein, M., and Henseler, J. (2009). “An empirical comparison of the efficacy of covariance-based and variance-based SEM.” Int. J. Res. Market., 26(4), 332–344.
Ringle, C. M., Sarstedt, M., and Straub, D. W. (2012). “A critical look at the use of PLS-SEM in MIS quarterly.” MIS Q., 36(1), 3–14.
Ringle, C. M., Wende, S., and Will, A. (2005). Smart-Pls 2.0 (beta), TUHH-Hamburg University of Technology, Hamburg, Germany.
Rowley, T., Behrens, D., and Krackhardt, D. (2000). “Redundant governance structures: an analysis of structural and relational embeddedness in the steel and semiconductor industries.” Strategic Manage. J., 21(3), 369–386.
Sydow, J., and Windeler, A. (1998). “Organizing and evaluating inter-firm networks: A structurationist perspective on network processes and effectiveness.” Organiz. Sci., 9(3), 265–284.
Tang, W. Z., Duffield, C. F., and Young, D. M. (2006). “Partnering mechanism in construction: An empirical study on the Chinese construction industry.” J. Constr. Eng. Manage., 132(3), 217–229.
Tenenhaus, M., Vinzi, V. E., Chatelin, Y., and Lauro, C. (2005). “PLS path modeling.” Comput. Stat. Data Anal., 48(1), 159–205.
Thompson, I., Cox, A., and Anderson, L. (1998). “Contracting strategies for the project environment.” Eur. J. Purchas. Supply Manage., 4(1), 31–41.
Unsal, H. I., and Taylor, J. E. (2011). “Modelling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks.” J. Constr. Eng. Manage., 137(4), 284–293.
Uzzi, B. (1996). “The sources and consequences of embeddedness for the economic performance of organizations: The network effect.” Am. Sociol. Rev., 61(4), 674–698.
Uzzi, B. (1997). “Social structure and competition in inter-firm networks: The paradox of embeddedness.” Admin. Sci. Q., 42(1), 35–67.
Uzzi, B., and Lancaster, R. (2003). “Relational embeddedness and learning: The case of bank loan managers and their clients.” Manage. Sci., 49(4), 383–399.
Wetzels, M., Odekerken-Schroder, G., and van Oppen, C. (2009). “Using PLS path modeling for assessing hierarchical construct models: Guidelines and empirical illustration.” MIS Q., 33(1), 177–195.
Williamson, O. E. (1985). The Economic Institutions of Capitalism, Free Press, New York.
Wong, P. C. P., and Cheung, S. O. (2005). “Structural equation model of trust and partnering success.” J. Manage. Eng., 21(2), 70–80.
Woolthuis, R. K., Hillebrand, B., and Nooteboom, B. (2005). “Trust, contract and relationship development.” Organiz. Stud., 26(6), 813–840.
Zaheer, A., and Soda, G. (2009). “Network evolution: The origins of structural holes.” Admin. Sci. Q., 54(1), 1–31.
Zou, P. X. W., and Lim, B. T. H. (2006). “An empirical study in subcontractor selection and long-term alliance relationship between main-contractor and subcontractor.” Int. J. Constr. Manage., 6(1), 1–13.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Received: Dec 16, 2012
Accepted: Jul 23, 2013
Published online: Sep 9, 2013
Published in print: Jan 1, 2014
Discussion open until: Feb 9, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.