Simulating Construction Duration for Multistory Buildings with Controlling Activities

Publication: Journal of Construction Engineering and Management
Volume 139, Issue 8

Abstract

Construction schedules are uncertain in nature; therefore, predicting construction duration is a difficult task. Extensive research has proposed mathematical models to predict construction duration based on regression analysis, Monte Carlo method (MCM), and so on. Yet regression analysis cannot capture duration uncertainties. Studies normally use Monte Carlo methods to simulate hundreds to thousands of activities in a project schedule. This can be complicated, time-consuming, and unrealistic because the statistical properties of all the activities cannot be readily determined in practice. Typical construction sequences in condominium building construction were first identified, and then the statistical distributions of controlling activities on the sequences were surveyed. Two-stage questionnaire surveys and goodness-of-fit statistical tests were conducted to achieve the mentioned objectives. Subsequently, a model for predicting the duration of building construction was proposed and applied to a high-rise building project. The results showed that the proposed model reasonably predicted the construction duration for this apartment building. The model fills the gap in knowledge of construction time forecast by introducing the concept of controlling activities to simplify the evaluation of the schedule uncertainty in multistory building construction. This research is beneficial for practitioners to estimate an overall construction schedule of building projects, especially in preconstruction phases.

Get full access to this article

View all available purchase options and get full access to this article.

References

AbouRizk, S. M., and Halpin, D. W. (1992). “Statistical properties of construction duration data.” J. Constr. Eng. Manage., 118(3), 525–544.
Ahuja, H. N., and Nandakumar, V. (1985). “Simulation model to forecast project completion time.” J. Constr. Eng. Manage., 111(4), 325–342.
American Association of Cost Engineers (AACE). (2011). “Integrated cost and schedule risk analysis using Monte Carlo simulation of a CPM model.”, Morgantown, WV.
American Association of Cost Engineers (AACE). (2012). “CPM schedule risk modeling and analysis: Special considerations.”, Morgantown, WV.
Besner, C., and Hobbs, B. (2006). “The perceived value and potential contribution of project management practices to project success.” Proj. Manage. J., 37(3), 37–48.
Blyth, K., Lewis, J., and Kaka, A. (2004). “Predicting project and activity duration for buildings in the UK.” J. Constr. Res., 5(2), 329–347.
Bromilow, F. J. (1969). “Contract time performance expectations and reality.” Build. Forum, 1(3), 70–80.
Chan, A. P. C. (1999). “Modelling building durations in Hong Kong.” Constr. Manage. Econ., 17(2), 189–196.
Chan, A. P. C. (2001). “Time-cost relationship of public sector projects in Malaysia.” Int. J. Proj. Manage., 19(4), 223–229.
Chan, A. P. C., and Chan, D. W. M. (2004). “Developing a benchmark model for project construction time performance in Hong Kong.” Build. Environ., 39(3), 339–349.
Chan, D. W. M., and Kumaraswamy, M. M. (1999). “Forecasting construction durations for public housing projects: A Hong Kong perspective.” Build. Environ., 34(5), 633–646.
Choudhury, I., and Rajan, S. S. (2003). “Time-cost relationship for residential construction in Texas.” Proc., 20th CIB W78 Conf. on Information Technology in Construction, Univ. of Auckland, Auckland, NZ.
Dursun, O., and Stoy, C. (2011). “Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location.” Constr. Manage. Econ., 29(1), 97–106.
Fente, J., Schexnayder, C., and Knutson, K. (2000). “Defining a probability distribution function for construction simulation.” J. Constr. Eng. Manage., 126(3), 234–241.
Herroelen, W., and Leus, R. (2005). “Project scheduling under uncertainty: Survey and research potentials.” Eur. J. Oper. Res., 165(2), 289–306.
Hoffman, G. J., Thal, A. E., Webb, T. S., and Weir, J. D. (2007). “Estimating performance time for construction projects.” J. Manage. Eng., 23(4), 193–199.
Hong, T., Cho, K., Hyun, C., and Han, S. (2011). “Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building.” J. Constr. Eng. Manage., 137(6), 393–402.
Irfan, M., Khurshid, M. B., Anastasopoulos, P., Labi, S., and Moavenzadeh, F. (2011). “Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type.” Int. J. Proj. Manage., 29(1), 78–92.
Kaka, A., and Price, A. D. F. (1991). “Relationships between value and duration of construction projects.” Constr. Manage. Econ., 9(4), 383–400.
Khosrowshahi, F., and Kaka, A. P. (1996). “Estimation of project total cost and duration for housing projects in the UK.” Build. Environ., 31(4), 373–383.
Le-Hoai, L., and Lee, Y. D. (2009). “Time-cost relationships of building construction project in Korea.” Facilities, 27(13/14), 549–559.
Leach, L. (2003). “Schedule and cost buffer sizing: How to account for the bias between project performance and your model.” Proj. Manage. J., 34(2), 34–47.
Lee, D. (2005). “Probability of project completion using stochastic project scheduling simulation.” J. Constr. Eng. Manage., 131(3), 310–318.
Liberatore, M. J. (2002). “Project schedule uncertainty analysis using fuzzy logic.” Proj. Manage. J., 33(4), 15–22.
Love, P. E. D., Tse, R. Y. C., and Edwards, D. J. (2005). “Time-cost relationships in Australian building construction projects.” J. Constr. Eng. Manage., 131(2), 187–194.
McCrary, S. W., Leslie, D., Roberts, F. L., and Corley, M. R. (2007). “Validation of project time decision-support tools and processes.” J. Ind. Technol., 23(2), 2–14.
Nkado, R. N. (1992). “Construction time information system for the building industry.” Constr. Manage. Econ., 10(6), 489–509.
Ng, S. T., Mak, M. M. Y., Skitmore, R. M., Lam, K. C., and Varnam, M. (2001). “The predictive ability of Bromilow’s time-cost model.” Constr. Manage. Econ., 19(2), 165–173.
Ogunsemi, D. R., and Jagboro, G. O. (2006). “Time-cost model for building projects in Nigeria.” Constr. Manage. Econ., 24(3), 253–258.
Skitmore, R. M., and Ng, S. T. (2003). “Forecast models for actual construction time and cost.” Build. Environ., 38(8), 1075–1083.
Stoy, C., Pollalis, S., and Schalcher, H.-R. (2007). “Early estimation of building construction speed in Germany.” Int. J. Proj. Manage., 25(3), 283–289.
Woolery, J. C., and Crandall, K. C. (1983). “Stochastic network model for planning scheduling.” J. Constr. Eng. Manage., 109(3), 342–354.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 8August 2013
Pages: 951 - 959

History

Received: Jul 12, 2012
Accepted: Jan 7, 2013
Published online: Jan 9, 2013
Discussion open until: Jun 9, 2013
Published in print: Aug 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Long D. Nguyen [email protected]
M.ASCE
Assistant Professor, Dept. of Environmental and Civil Engineering, Florida Gulf Coast Univ., 10501 FGCU Blvd. S., Fort Myers, FL 33965 (corresponding author). E-mail: [email protected]
Duc H. Phan [email protected]
Planning Engineer, Sino-Pacific Construction Consultant Co. Ltd., 801 Nguyen Van Linh Parkway, Dist. 7, Ho Chi Minh City, Vietnam. E-mail: [email protected]
Llewellyn C. M. Tang [email protected]
Associate Professor, Construction Management, Univ. of Nottingham Ningbo, 199 Taikang East Rd., Ningbo 315100 China. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share