Nature of Tender Review Meetings

Publication: Journal of Construction Engineering and Management
Volume 139, Issue 8

Abstract

Tender review meetings form a significant part of a contractor’s tendering process. These are instances in a tender process when the members of a bid team come together to coordinate their tender preparation activities, develop their tender strategy, and quality check the output to date of a tender process. Little empirical work exists on this, particularly because of the commercially sensitive data associated with it. Here, access was negotiated into the offices of two major UK contractors, hereafter known as Gamma and Delta, and the whole tender process was shadowed for 6 and 7 weeks, respectively, using participant observation, documentary analysis, and interview. This helped to examine and analyze the various review meetings that take place in the tendering process, and how they connect with the development of a contractor’s tender strategy, program, and price. Out of seven tender review meetings identified, four main ones significantly impacted the final submission. These were tender launch, midtender review, tender clarification with client, and finalization review. The review meetings consumed 6–9% of the tender period—108 working hours in Gamma and 180 in Delta. Although this may have contributed significantly to tendering costs, review meetings provided an essential means for joint risk management and integration of the various parts of a contractor’s bid team. The findings are particularly useful for contractors because they offer a systematic examination of what actually happens in practice and the implications for tendering costs and bid formulation.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The comments from anonymous reviewers helped to improve this paper substantially.

References

Al-Reshaid, K., and Kartam, N. (2005). “Design–build pre-qualification and tendering approach for public projects.” Int. J. Project Manage., 23(4), 309–320.
Arslan, G., Tuncan, M., Birgonul, M. T., and Dikmen, I. (2006). “E-bidding proposal preparation system for construction projects.” Build. Environ., 41(10), 1406–1413.
Ashworth, A. (2008). Pre-contract studies: Development economics, tendering and estimating, Blackwell, Oxford, UK.
Ballesteros-Pérez, P., González-Cruz, M. C., and Cañavate-Grimal, A. (2012). “Mathematical relationships between scoring parameters in capped tendering.” Int. J. Project Manage., 30(7), 850–862.
Berry, C., and McCarthy, S. (2011). Guide to sustainable procurement in construction, CIRIA, London.
Betts, M. (1990). “Methods and data used by large building contractors in preparing tenders.” Constr. Manage. Econ., 8(4), 399–414.
Brook, M. (2008). Estimating and tendering for construction work, 4th Ed., Butterworth Heinemann, Boston.
Buchan, R. D., Fleming, F. W. E., and Grant, F. E. K. (2003). Estimating for builders and surveyors, 2nd Ed., Butterworth-Heinemann, Oxford, UK.
Cabinet Office. (2011). Government construction strategy, United Kingdom Government Cabinet Office, Whitehall, London.
Cagno, E., Caron, F., and Perego, A. (2001). “Multi-criteria assessment of the probability of winning in the competitive bidding process.” Int. J. Project Manage., 19(6), 313–324.
Carr, P. G. (2005). “Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders.” J. Constr. Eng. Manage., 131(11), 1165–1172.
Chan, E. H. W., and Au, M. C. Y. (2009). “Factors influencing building contractors’ pricing for time-related risks in tenders.” J. Constr. Eng. Manage., 135(3), 135–145.
Chapman, C. B., Ward, S. C., and Bennell, J. A. (2000). “Incorporating uncertainty in competitive bidding.” Int. J. Project Manage., 18(5), 337–347.
Chartered Institute of Building (CIOB). (2009). Code of estimating practice, 7th Ed., Wiley-Blackwell, Oxford.
Dalton, M. (1959). “Men who manage.” The sociology of economic life, M. Granovetter and R. Swedberg, eds., Westview, Boulder, CO.
Egemen, M., and Mohamed, A. N. (2007). “A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions.” Build. Environ., 42(3), 1373–1385.
Elhag, T. M. S., Boussabaine, A. H., and Ballal, T. M. A. (2005). “Critical determinants of construction tendering costs: Quantity surveyors’ standpoint.” Int. J. Project Manage., 23(7), 538–545.
European Union (2004). “Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts.” OJ L 134, European Parliament, Council, Brussels, 114–240.
Ferguson, N. S., Langford, D. A., and Chan, W. M. (1995). “Empirical study of tendering practice of Dutch municipalities for the procurement of civil-engineering contracts.” Int. J. Project Manage., 13(3), 157–161.
Gates, M. (1967). “Bidding strategies and probabilities.” J. Constr. Eng. Div., 93(1), 75–107.
Gill, J., and Johnson, P. (2002). Research methods for managers, 3rd Ed., Sage, London.
Green, S. D. (1989). “Tendering: Optimization and rationality.” Constr. Manage. Econ., 7(1), 53–63.
Hackett, M., Robinson, I., and Statam, G. (2007). Procurement, tendering, and contract administration, Blackwell, Oxford, UK.
Harrison, S. (1981). “Estimating and tendering—Some aspects of theory and practice.”, The Chartered Institute of Building, Ascot.
Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1993). “A conceptual alternative to current tendering practice.” Build. Res. Inform., 21(3), 167–172.
Hughes, W. P., Hillebrandt, P., Greenwood, D. G., and Kwawu, W. E. K. (2006). Procurement in the construction industry: The impact and cost of alternative market and supply processes, Taylor and Francis, London.
Hurtado, K. A., and O’Connor, P. J. (2008). “Contract issues in the use of construction building information modeling.”, London.
International Organization for Standardisation (ISO). (2010). “Construction procurement, Part 1: Processes, methods and procedures.”, Geneva.
Laryea, S. (2009). “Subcontract and supply enquiries in the tender process of contractors.” Constr. Manage. Econ., 27 (12), 1219–1230.
Laryea, S. (2011). “Quality of tender documents: Case studies from the UK.” Constr. Manage. Econ., 29(3), 275–286.
Laryea, S., and Hughes, W. (2008). “How contractors price risk in bids: Theory and practice.” Constr. Manage. Econ., 26(9), 911–924.
Laryea, S., and Hughes, W. (2009). “Commercial reviews in the tender process of contractors.” Eng. Construct. Architect. Manage., 16 (6), 558–572.
Laryea, S., and Hughes, W. (2011). “Risk and price in the bidding process of contractors.” J. Constr. Eng. Manage., 137(4), 248–258.
Leung, M., Skitmore, M., and Chan, Y. S. (2007). “Subjective and objective stress in construction cost estimation.” Constr. Manage. Econ., 25(10), 1063–1075.
Lewis, H. (2003). Bids, tenders and proposals, Kogan Page, London.
Lin, C., and Chen, Y. (2004). “Bid/no-bid decision-making—A fuzzy linguistic approach.” Int. J. Project Manage., 22(7), 585–593.
Liu, M., and Ling, Y. Y. (2005). “Modeling a contractor’s markup estimation.” J. Constr. Eng. Manage., 131(4), 391–399.
Mintzberg, H. (1973). The nature of managerial work, Harper and Row, New York.
Mohamed, K. A., Khoury, S. S., and Hafez, S. M. (2011). “Contractor’s decision for bid profit reduction within opportunistic bidding behaviour of claims recovery.” Int. J. Project Manage., 29(1), 93–107.
Murdoch, J., Hughes, W. (2008). Construction contracts, 4th Ed., Taylor & Francis, London.
Neufville, R., and King, D. (1991). “Risk and need-for-work premiums in contractor bidding.” J. Constr. Eng. Manage., 117(4), 659–673.
Ng, S. T., Skitmore, M., and Cheung, S. (2005). “Critical stressors influencing construction estimators in Hong Kong.” Constr. Manage. Econ., 23(1), 33–44.
Oo, B., Drew, D. S., and Lo, H. (2008). “A comparison of contractors’ decision to bid behaviour according to different market environments.” Int. J. Project Manage., 26(4), 439–447.
Ray, R. S., Hornibrook, J., Skitmore, M., and Zakarda-Fraser, A. (1999). “Ethics in tendering: A survey of Australian opinion and practice.” Constr. Manage. Econ., 17(2), 139–153.
Rooke, J., Seymour, D., and Fellows, R. (2004). “Planning for claims: An ethnography of industry culture.” Constr. Manage. Econ., 22(6), 655–662.
Runeson, G., and Skitmore, M. (1999). “Tendering theory revisited.” Constr. Manage. Econ., 17(3), 285–296.
Saunders, M. N. K., Lewis, P., and Thornhill, A. (2007). Research methods for business students, 4th Ed., FT/Prentice Hall, Harlow, England.
Shash, A. A. (1998). “Bidding practices of subcontractors in Colorado.” J. Constr. Eng. Manage., 124(3), 219–225.
Shen, L., and Song, W. (1998). “Competitive tendering practice in Chinese construction.” J. Constr. Eng. Manage., 124(2), 155–161.
Silverman, D. (1997). Qualitative research, Sage, London.
Skitmore, M., and Wilcock, J. (1994). “Estimating processes of smaller builders.” Constr. Manage. Econ., 12(2), 139–154.
Smith, G. R., and Bohn, M. C. (1999). “Small to medium contractor contingency and assumption of risk.” J. Constr. Eng. Manage., 125(2), 101–108.
Tiong, R. L. K., and Alum, J. (1997). “Final negotiation in competitive BOT tender.” J. Constr. Eng. Manage., 123(1), 6–10.
Tzeng, W., Li, J. C., and Chang, T. (2006). “A study on the effectiveness of the most advantageous tendering method in the public works of Taiwan.” Int. J. Project Manage., 24(5), 431–437.
Uher, T. E., and Runeson, G. (1984) “Pre-tender and post-tender negotiations in Australia.” Constr. Manage. Econ., 2(3), 185–192.
Wåhlström, O. (1991) “Simplified tender documents, giving an unambiguous representation of the finished building—Reduction of total cost is possible with a set of appropriate construction tender documents.” Build. Res. Inform., 19(5), 311–314.
Wang, J., Xu, Y., and Li, Z. (2009). “Research on project selection system of pre-evaluation of engineering design project bidding.” Int. J. Project Manage., 27(6), 584–599.
Winch, G. M., and Kelsey, J. (2005). “What do construction project planners do?” Int. J. Project Manage., 23(2), 141–149.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 8August 2013
Pages: 927 - 940

History

Received: Jun 26, 2012
Accepted: Nov 29, 2012
Published online: Dec 1, 2012
Discussion open until: May 1, 2013
Published in print: Aug 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Samuel Laryea [email protected]
Senior Lecturer, School of Construction Economics and Management, Faculty of Engineering and the Built Environment, Univ. of the Witwatersrand, 1 Jan Smut Ave., Braamfontein, Johannesburg, PO Box 20, Wits 2050, South Africa. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share