Abstract

The number of construction project managers initializing the use of the Last Planner System of Production Control (LPS), an operating system for project management designed to optimize work flow and promote rapid learning, is rapidly increasing, motivated by industry trends and testimonials of its perceived benefits. This study, limited to the building sector, is a systematic literature and testimonial search of the perceived motivations and benefits or challenges for choosing LPS. It substantiates the claims of those perceptions through a structured survey of senior and mid-level managers. Quantitative statistical tools infer that practitioners who use LPS experience more reliable planning, better supply chain integration, and less work flow time. However, managers who directly implement LPS are faced with external resistance from clients and subcontractors, and feel that their organization does not offer the necessary incentives for adopting LPS, indicating a possible clash of paradigms. The case studies and testimonials were available in the literature referenced in the paper, but the survey and the method for analysis are new and have not been published elsewhere, either wholly or in part.

Get full access to this article

View all available purchase options and get full access to this article.

References

AlSehaimi, A., Tzortzopoulos, P., and Koskela, L. (2009). “Last Planner System: Experiences from pilot implementation in the Middle East.” Proc., 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), International Group for Lean Construction, Salford, U.K.
Ansell, M., Holmes, M., Evans, R., Pasquire, C., and Price, A. (2007). “Lean construction trial on a highway maintenance project.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group for Lean Construction, Salford, U.K.
Arbulu, R., and Soto, J. (2006). “A design case study: Integrated product and process management.” Proc., 14th Annual Conf. of the Int. Group for Lean Construction (IGLC-14), International Group for Lean Construction, Salford, U.K.
Ballard, G. (1993). “Improving EPC performance.” Proc., 1st Annual Conf. of the Int. Group for Lean Production, International Group for Lean Construction, Salford, U.K.
Ballard, G. (2000). “The Last Planner System of production control.” Ph.D. thesis, Faculty of Engineering, University of Birmingham, Salford, U.K.
Ballard, G., Hammond, J., and Nickerson, R. (2009). “Production control principles.” Proc., 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), International Group for Lean Construction, Salford, U.K.
Ballard, G., and Howell, G. A. (2003). “Lean project management.” Build. Res. Inf., 31(2), 119–133.
Ballard, G., Liu, M., Kim, Y. W., and Jang, J. W. (2007). Roadmap to lean implementation at the project level, Construction Industry Institute (CII), Austin, TX.
Dawes, J. (2008). “Do data characteristics change according to the number of scale points used?—An experiment using 5-point, 7-point and 10-point scales.” Int. J. Market Res., 50(1), 61–77.
Fiallo, C. M., and Revelo, P. V. H. (2002). “Applying the Last Planner System to a construction project- Case study in Quito, Ecuador.” Proc., 10th Annual Conf. of the Int. Group for Lean Construction (IGLC-10), International Group for Lean Construction, Salford, U.K.
Fernandez-Solis, J. L. (2008). “The systemic nature of the construction industry.” Architect. Eng. Des. Manage., 4(1), 31–46.
Garza, J. M., and Leong, M. W. (2000). “Last Planner technique: A case study.” Proc., Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World, ASCE, Reston, VA.
Hamzeh, F. R., Ballard, G., and Tommelein, I. D. (2009). “Is the Last Planner System applicable to design?—A case study.” Proc., 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), International Group for Lean Construction, Salford, U.K.
Huovila P., and Koskela L. (1998). “Contribution of the principles of lean construction to meet the challenges of sustainable development.” Proc., 6th Annual Conf. of the Int. Group for Lean Construction (IGLC-6), International Group for Lean Construction, Salford, U.K.
Jang, J. W., Kim, Y. W., Park, C. J., and Jang, W. S. (2007). “Importance of partners in a challenging lean journey.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group for Lean Construction, Salford, U.K.
Johansen, E., and Walter, L. (2007). “Lean construction—Prospects for the German construction industry.” Lean Constr. J., 3(1), 19–32.
JØrgensen, B., Emmitt, S., and Bonke, S. (2004). “Integrating design and construction: Basic coordination issues.” Proc., of the CIB World Building Congress, Salford, U.K.
Kemmer, S. L., Heineck, L. F. M., Novaes, M. V., Alexandre, C., Mourão, M. A., and Alves, T. C. L. (2007). “Medium term planning—Contribution based on field application.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group for Lean Construction, Salford, U.K.
Khanzode, A., Fischer, M., and Reed, D. (2008). “Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project.” J. Inform. Tech. Construct., 13, 324–342.
Kim, Y. W., and Jang, J. W. (2005). “Case study—An application of Last Planner to heavy civil construction in Korea.” Proc., 13th Annual Conf. of the Int. Group for Lean Construction (IGLC-13), International Group for Lean Construction, Salford, U.K.
Kim, Y. W., Park, C., and Ballard, G. (2007). “A case study on rebar supply chain management by GS E&C.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group for Lean Construction, Salford, U.K.
Koskela, L. (1992). “Application of the new production philosophy to construction.” Center for Integrated Facility Engineering (CIFE), Stanford, CA, 〈http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.15.9598&rep=rep1&type=pdf〉 (Jun. 10, 2010).
Lane, R., and Woodman, G. (2000). “Wicked problems, righteous solutions back to the future on large complex projects.” Proc., 8th Annual Conf. of the Int. Group for Lean Construction (IGLC-8), International Group for Lean Construction, Salford, U.K.
Liu, M., and Ballard, G. (2009). “Factors affecting work flow reliability—A case study.” Proc., 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), International Group for Lean Construction, Salford, U.K.
Mikati, S. O., Roller, T. G., Tommelein, I. D., and Khanzode, A. (2007). “Priority conversations: A case study on priority walls.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group of Lean Construction, Salford, U.K., 431–441.
Mohan, S. B., and Iyer, S. (2005). “Effectiveness of lean principles in construction.” Proc., 13th Annual Conf. of the Int. Group for Lean Construction (IGLC-13), International Group for Lean Construction, Salford, U.K.
Mossman, A. (2009). “Why isn’t the UK construction industry going lean with gusto?” Lean Constr. J., 5(1), 24–36.
Nielsen, A. S., and Thomassen, M. A. (2004). “How to reduce batch size.” Proc., 12th Annual Conf. of the Int. Group for Lean Construction (IGLC-12), International Group for Lean Construction, Salford, U.K.
North American Industry Classification System (NAICS). (2007). “2007 NSICS definition.” 〈http://www.census.gov/cgi-bin/sssd/naics/naicsrch?chart=2007〉 (Dec. 10, 2011).
Olano, R. M, Alarcón, L. F., and Razuri, C. (2009). “Understanding the relationship between planning reliability and schedule performance—A case study.” Proc., 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), International Group for Lean Construction, Salford, U.K.
Picchi, F. A., and Granja, A. D. (2004). “Construction site—Using lean principles to seek broader implementations.” Proc., 12th Annual Conf. of the Int. Group for Lean Construction (IGLC-12), International Group of Lean Construction, Salford, U.K., 1–12.
Salem, O., Genaidy, J. S. A., and Luegring, M. (2005). “Site implementation and assessment of lean construction techniques.” Lean Constr. J., 2(2), 1–21.
Salem, O., and Solomon, J. (2006). “Lean construction: From theory to implementation.” J. Manage. Eng., 22(4), 168–175.
Senaratne, S., and Wijesiri, D. (2008). “Lean construction as a strategic option: Testing its suitability and acceptability in Sri Lanka.” Lean Constr. J., 4(1), 34.
Simonsson, P., and Emborg, M. (2007). “Industrialization in Swedish bridge engineering: A case study of lean construction.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group for Lean Construction, Salford, U.K.
Sterzi, M. P., Isatto, E. L., and Formoso, C. T. (2007). “Integrating strategic project supply chain members in production planning and control.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), International Group for Lean Construction, Salford, U.K.
Tsao, C. C. Y., and Tommelein, I. D. (2004). “Work structuring to achieve integrated product-process design.” J. Constr. Eng. Manage., 130(6), 780–789.
Yin, R. K. (2009). Case study research design methods, Vol. 5, Sage Publications, Thousand Oaks, CA.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 4April 2013
Pages: 354 - 360

History

Received: Sep 15, 2011
Accepted: May 17, 2012
Published online: May 22, 2012
Published in print: Apr 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Jose L. Fernandez-Solis, Ph.D. [email protected]
Assistant Professor, Dept. of Construction Science, College of Architecture, 3137 TAMU, Texas A&M Univ., College Station, TX 77843-3137 (corresponding author). E-mail: [email protected]
Vishal Porwal [email protected]
MSCM, Dept. of Construction Science, College of Architecture, 3137 TAMU, Texas A&M Univ., College Station, TX 77843-3137. E-mail: [email protected]
Sarel Lavy, Ph.D. [email protected]
M.ASCE
Associate Professor, Dept. of Construction Science, College of Architecture, 3137 TAMU, Texas A&M Univ., College Station, TX 77843-3137. E-mail: [email protected]
Ali Shafaat [email protected]
MSSE, Dept. of Industrial and Systems Engineering, College of Engineering, 3131 TAMU, Texas A&M Univ., College Station, TX 77843-3131. E-mail: [email protected]
Zofia K. Rybkowski, Ph.D. [email protected]
Assistant Professor, Dept. of Construction Science, College of Architecture, 3137 TAMU, Texas A&M Univ., College Station, TX 77843-3137. E-mail: [email protected]
Kiyoung Son, Ph.D. [email protected]
Dept. of Architecture, College of Architecture, 3137 TAMU, Texas A&M Univ., College Station, TX 77843-3137. E-mail: [email protected]
Nishi Lagoo [email protected]
MSCM Student, Dept. of Construction Science, College of Architecture, 3137 TAMU, Texas A&M Univ., College Station, TX 77843-3137. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share