Technical Papers
Feb 21, 2012

Web-Based Risk Assessment Tool Using Integrated Duration–Cost Influence Network Model

Publication: Journal of Construction Engineering and Management
Volume 138, Issue 9

Abstract

The major challenges of project risk assessment may be attributed to the knowledge requirements for determining the level of uncertainty and the development of complex models to predict project outcomes. The duration–cost influence network is an adequate model that can be used for activity-based risk modeling. In this study, a scenario analysis feature is added to this model and a Web-based tool is developed that can be used to calculate risk-adjusted duration and cost, considering the risks affecting cost and duration of individual activities. Monte Carlo simulation is used to create scenarios, and the output of these scenarios is calculated by using the cost–duration influence system that simulates the vulnerability of the project to the identified risk factors. The Web-based tool can be used by decision makers during the preplanning stage of construction projects to estimate the cost and duration implications of various risk occurrence scenarios, determine contingencies, and prepare risk-management plans.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This study is sponsored by the Turkish Academy of Sciences. The authors would like to express their gratitude to the anonymous reviewers for their excellent comments, which helped to improve the paper significantly.

References

Aven, T., and Renn, O. (2009). “The role of quantitative risk assessments for characterizing risk and uncertainty and delineating appropriate risk management options, with special emphasis on terrorism risk.” Risk Anal., 29(4), 587–600.
Bhargava, A., Anastasopoulos, P. C., Labi, S., Sinha, K. C., and Mannering, F. L. (2010). “Three-stage least-squares analysis of time and cost overruns in construction contracts.” J. Constr. Eng. Manage., 136(11), 1207–1218.
Chen, P. H. (2008). “Integration of cost and schedule using extensive matrix method and spreadsheets.” Autom. Constr., 18(1), 32–41.
Choi, H. H., and Mahadevan, S. (2008). “Construction project risk assessment using existing database and project-specific information.” J. Constr. Eng. Manage., 134(11), 894–903.
Clayton, M., Kunz, J., and Fischer, M. (1998). The charrette test method, Center for Integrated Facility Engineering, Stanford Univ., Stanford, CA.
Dikmen, I., Birgonul, M. T., Anac, C., Tah, J. H. M., and Aouad, G. (2008). “Learning from risks: A tool for post-project risk assessment.” Autom. Constr., 18(1), 42–50.
Feng, C. W., Chen, Y. J., and Huang, J. R. (2010). “Using the MD CAD model to develop the time-cost integrated schedule for construction projects.” Autom. Constr., 19(3), 347–356.
Haimes, Y. Y. (2009). “On the complex definition of risk: A systems based approach.” Risk Anal., 29(12), 1647–1654.
Han, S. H., Kim, D. Y., Kim, H., and Jang, W. S. (2008). “A web-based integrated system for international project risk management.” Autom. Constr., 17(3), 342–356.
Isidore, L. J., and Back, W. E. (2002). “Multiple simulation analysis for probabilistic cost and schedule integration.” J. Constr. Eng. Manage., 128(3), 211–219.
Jaafari, A. (2001). “Management of risks, uncertainties and opportunities on projects: Time for a fundamental shift.” Int. J. Project Manage., 19(2), 89–101.
Kaplan, S., and Garrick, B. J. (1981). “On the quantitative definition of risk.” Risk Anal., 1(1), 11–27.
North, W. D. (2010). “Probability theory and consistent reasoning.” Risk Anal., 30(3), 377–380.
Poh, Y. P., and Tah, J. H. M. (2006). “Integrated duration–cost influence network for modelling risk impacts on construction tasks.” Constr. Manage. Econ., 24(8), 861–868.
Vose, D. (1996). Quantitative risk analysis: A guide to Monte Carlo simulation modelling, Wiley, Chichester, UK.
Zhang, H. (2007). “A redefinition of the project risk process: Using vulnerability to open up the event-consequence link.” Int. J. Project Manage., 25(7), 694–701.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 138Issue 9September 2012
Pages: 1023 - 1034

History

Received: May 26, 2011
Accepted: Feb 16, 2012
Published online: Feb 21, 2012
Published in print: Sep 1, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Irem Dikmen [email protected]
Ph.D.
Professor, Middle East Technical Univ., Dept. of Civil Engineering, Ankara, Turkey (corresponding author). E-mail: [email protected]
M. Talat Birgonul
Ph.D.
Professor, Middle East Technical Univ., Dept. of Civil Engineering, Ankara, Turkey.
Joseph H. M. Tah
Ph.D.
Professor, Oxford Brookes Univ., Dept. of Real Estate and Construction, Oxford, U.K.
Ahmet Hamdi Ozer
Civil and Mechanical Engineer, Aydeniz Group, Ankara, Turkey.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share