Web-Based Risk Assessment Tool Using Integrated Duration–Cost Influence Network Model
Publication: Journal of Construction Engineering and Management
Volume 138, Issue 9
Abstract
The major challenges of project risk assessment may be attributed to the knowledge requirements for determining the level of uncertainty and the development of complex models to predict project outcomes. The duration–cost influence network is an adequate model that can be used for activity-based risk modeling. In this study, a scenario analysis feature is added to this model and a Web-based tool is developed that can be used to calculate risk-adjusted duration and cost, considering the risks affecting cost and duration of individual activities. Monte Carlo simulation is used to create scenarios, and the output of these scenarios is calculated by using the cost–duration influence system that simulates the vulnerability of the project to the identified risk factors. The Web-based tool can be used by decision makers during the preplanning stage of construction projects to estimate the cost and duration implications of various risk occurrence scenarios, determine contingencies, and prepare risk-management plans.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This study is sponsored by the Turkish Academy of Sciences. The authors would like to express their gratitude to the anonymous reviewers for their excellent comments, which helped to improve the paper significantly.
References
Aven, T., and Renn, O. (2009). “The role of quantitative risk assessments for characterizing risk and uncertainty and delineating appropriate risk management options, with special emphasis on terrorism risk.” Risk Anal., 29(4), 587–600.
Bhargava, A., Anastasopoulos, P. C., Labi, S., Sinha, K. C., and Mannering, F. L. (2010). “Three-stage least-squares analysis of time and cost overruns in construction contracts.” J. Constr. Eng. Manage., 136(11), 1207–1218.
Chen, P. H. (2008). “Integration of cost and schedule using extensive matrix method and spreadsheets.” Autom. Constr., 18(1), 32–41.
Choi, H. H., and Mahadevan, S. (2008). “Construction project risk assessment using existing database and project-specific information.” J. Constr. Eng. Manage., 134(11), 894–903.
Clayton, M., Kunz, J., and Fischer, M. (1998). The charrette test method, Center for Integrated Facility Engineering, Stanford Univ., Stanford, CA.
Dikmen, I., Birgonul, M. T., Anac, C., Tah, J. H. M., and Aouad, G. (2008). “Learning from risks: A tool for post-project risk assessment.” Autom. Constr., 18(1), 42–50.
Feng, C. W., Chen, Y. J., and Huang, J. R. (2010). “Using the MD CAD model to develop the time-cost integrated schedule for construction projects.” Autom. Constr., 19(3), 347–356.
Haimes, Y. Y. (2009). “On the complex definition of risk: A systems based approach.” Risk Anal., 29(12), 1647–1654.
Han, S. H., Kim, D. Y., Kim, H., and Jang, W. S. (2008). “A web-based integrated system for international project risk management.” Autom. Constr., 17(3), 342–356.
Isidore, L. J., and Back, W. E. (2002). “Multiple simulation analysis for probabilistic cost and schedule integration.” J. Constr. Eng. Manage., 128(3), 211–219.
Jaafari, A. (2001). “Management of risks, uncertainties and opportunities on projects: Time for a fundamental shift.” Int. J. Project Manage., 19(2), 89–101.
Kaplan, S., and Garrick, B. J. (1981). “On the quantitative definition of risk.” Risk Anal., 1(1), 11–27.
North, W. D. (2010). “Probability theory and consistent reasoning.” Risk Anal., 30(3), 377–380.
Poh, Y. P., and Tah, J. H. M. (2006). “Integrated duration–cost influence network for modelling risk impacts on construction tasks.” Constr. Manage. Econ., 24(8), 861–868.
Vose, D. (1996). Quantitative risk analysis: A guide to Monte Carlo simulation modelling, Wiley, Chichester, UK.
Zhang, H. (2007). “A redefinition of the project risk process: Using vulnerability to open up the event-consequence link.” Int. J. Project Manage., 25(7), 694–701.
Information & Authors
Information
Published In
Copyright
© 2012 American Society of Civil Engineers.
History
Received: May 26, 2011
Accepted: Feb 16, 2012
Published online: Feb 21, 2012
Published in print: Sep 1, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.