Technical Notes
Nov 3, 2011

Experience in Expert Estimation of Probabilities and Correlations for Rail Line Construction

Publication: Journal of Construction Engineering and Management
Volume 138, Issue 9

Abstract

To counteract cost escalation and delays in infrastructure construction, an estimation model has been developed that simulates project uncertainty with probability distributions, correlations, and disruptive events. When applied to a new rail line project, three model inputs were not available from the designers: time distributions, cost correlations, and probability of occurrence and cost/time impacts of disruptive events. Experts in the field of tunnel-, viaduct-, and earthwork construction were asked to estimate the unavailable information. This paper presents a brief overview of biases that occur when experts estimate probabilities, the calibration steps taken to prevent the experts from being affected by such biases, and example questions from the questionnaire, followed by an in-depth discussion of findings. Unexpectedly, the experts followed radically different estimation techniques: the tunnel expert recalled values from past projects, the viaduct expert calculated the required values, while the earthwork expert estimated the mode value, and from it, the extreme values. Depending on estimation technique, a bias influences or cannot influence an expert. It was also observed that experts not familiar with probability theory encountered major difficulties in correlation estimation, despite concept explanation and visualization. Thus, for a successful correlation estimation it is paramount that experts be acquainted with probability theory in addition to being knowledgeable in their fields.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ayyub, B. M. (2001). Elicitation of expert opinions for uncertainty and risks, CRC, Boca Raton, FL.
Clemen, R. T., Fischer, G. W., and Winkler, R. L. (2000). “Assessing dependence: Some experimental results”. Manage. Sci., 46(8): 1100.
Cooke, R. (1991). “Experts in uncertainty: Opinion and subjective probability in science.” Environmental ethics and science policy series, Oxford University Press, New York.
Hallowell, M. R., and Gambatese, J. A. (2010). “Qualitative research: Application of the delphi method to CEM research.” J. Constr. Eng. Manage., 136(1): 99–107.
Moret, Y. (2011). “Modeling cost and time uncertainty in rail line construction.” Ph.D. thesis, Massachusetts Institute of Technology, Cambridge, MA.
Moret, Y., and Einstein, H. H. (2012). “Modeling correlations in rail line construction.” J. Constr. Eng. Manage., 138(9), 1075–1084.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 138Issue 9September 2012
Pages: 1103 - 1106

History

Received: Dec 16, 2010
Accepted: Nov 1, 2011
Published online: Nov 3, 2011
Published in print: Sep 1, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Yvonne Moret [email protected]
Former Research Assistant, Dept. of Civil and Environmental Engineering, Massachusetts Institute of Technology, 77 Massachusetts Ave., Cambridge, MA 02139 (corresponding author). E-mail: [email protected]
Herbert H. Einstein
F.ASCE
Professor of Civil and Environmental Engineering, Dept. of Civil and Environmental Engineering, Massachusetts Institute of Technology, 77 Massachusetts Ave., Cambridge, MA 02139.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share