DISCUSSIONS AND CLOSURES
Jul 15, 2011

Closure to “Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search” by Zong Woo Geem

This article is a reply.
VIEW THE ORIGINAL ARTICLE
Publication: Journal of Construction Engineering and Management
Volume 137, Issue 8
First page of PDF

Get full access to this article

View all available purchase options and get full access to this article.

References

Deeg, H. J., et al. (2010). “A transiting giant planet with a temperature between 250 K and 430 K.” Nature, 464, 384–387.
Dorigo, M., Maniezzo, V., and Colorni, A. (1996). “The Ant System: Optimization by a colony of cooperating agents.” IEEE Trans. Syst. Man Cybern. Part B Cybern., 26(1), 29–41.
Feng, C.-W., Liu, L., and Burns, S. A. (1997). “Using genetic algorithms to solve construction time-cost trade-off problems.” J. Comput. Civ. Eng., 11(3), 184–189.
Geem, Z. W. (2005). “Harmony search in water pump switching problem.” Lect. Notes Comput. Sci., 3612, 751–760.
Geem, Z. W. (2008). “Novel derivative of harmony search algorithm for discrete design variables.” Appl. Math. Comput., 199(1), 223–230.
Geem, Z. W. (2009). “Particle-swarm harmony search for water network design.” Eng. Optim., 41(4), 297–311.
Geem, Z. W., Kim, J. H., and Loganathan, G. V. (2001). “A new heuristic optimization algorithm: harmony search.” Simulation, 76(2), 60–68.
Geem, Z. W., and Sim, K.-B. (2010). “Parameter-setting-free harmony search algorithm.” Appl. Math. Comput., 217(8), 3881–3889.
Goldberg, D. E. (1989). Genetic algorithms in search optimization and machine learning, Addison-Wesley, Reading, MA.
Hasancebi, O., Erdal, F., and Saka, M. P. (2010). “Adaptive harmony search method for structural optimization.” J. Struct. Eng., 136(4), 419–431.
Xiong, Y., and Kuang, Y. (2008). “Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off.” J. Constr. Eng. Manage., 134(2), 153–156.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 137Issue 8August 2011
Pages: 630 - 631

History

Received: Dec 20, 2010
Accepted: Mar 17, 2011
Published online: Jul 15, 2011
Published in print: Aug 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

Zong Woo Geem [email protected]
Environmental Planning and Management Program, Johns Hopkins Univ., 11833 Skylark Road, Clarksburg, MD 20871. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share