Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling

Publication: Journal of Construction Engineering and Management
Volume 137, Issue 12

Abstract

Construction scheduling techniques often generate schedules that cause undesirable resource fluctuations that are inefficient and costly to implement on site. This paper presents the development of a novel multiobjective optimization model that is capable of measuring and minimizing these undesirable resource fluctuations to maximize resource utilization efficiency and minimize project duration while complying with all precedence relationships and resource availability constraints. The model incorporates three main modules: (1) a startup module that calculates lower and upper bounds for the model decision variables; (2) a scheduling module that generates practical schedules and evaluates their performance; and (3) a multiobjective genetic algorithm module that searches for and identifies optimal schedules. The model is integrated in a commercially available software system to facilitate its use and adoption by construction planners. An application example is analyzed to illustrate the use of the model and demonstrate its new and unique capabilities in generating optimal trade-offs between maximizing resource utilization efficiency and minimizing the duration of construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

References

Bandelloni, M., Tucci, M., and Rinaldi, R. (1994). “Optimal resource leveling using non-serial dynamic programming.” Eur. J. Oper. Res., 78(2), 162–177.
Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). “Construction resource scheduling with genetic algorithms.” J. Constr. Eng. Manage., 122(2), 125–132.
Chen, P., and Shahandashti, S. M. (2009). “Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints.” Autom. Constr., 18(4), 434–443.
Chua, D. K. H., Chan, W. T., and Kannan, G. (1996). “Scheduling with co-evolving resource availability profiles.” J. Civ. Eng. Environ. Sys., 13(4), 311–329.
Deb, K., Pratap, A., Agrawal, S., and Meyarivan, T. (2001). “A fast and elitist multi-objective genetic algorithm: NSGA-II.” KANGAL Rep. 200001, Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India.
Easa, S. M. (1989). “Resource leveling in construction by optimization.” J. Constr. Eng. Manage., 115(2), 302–316.
El-Rayes, K., and Jun, D. H. (2009). “Optimizing resource leveling in construction projects.” J. Constr. Eng. Manage., 135(11), 1172–1180.
Harris, R. B. (1978). Precedence and arrow networking techniques for Construction, Wiley, New York.
Hegazy, T. (1999). “Optimization of resource allocation and leveling using genetic algorithms.” J. Constr. Eng. Manage., 125(3), 167–175.
Kelly, J. E. (1963). The critical-path method: Resource planning and scheduling, J. F. Muth, and G. L. Thompson, eds., Industrial Scheduling, Prentice Hall, Englewood Cliffs, NJ.
Kim, J., and Ellis, J. (2008). “Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling.” J. Constr. Eng. Manage., 134(11), 904–913.
Lee, J., and Kim, Y. (1996). “Search heuristics for resource constrained project scheduling.” J. Oper. Res. Soc., 47(5), 678–689.
Leu, S., and Yang, C. (1999). “A genetic-algorithm-based resource-constrained construction scheduling system.” Constr. Manage. Econ., 17(6), 767–776.
Mattila, K. G., and Abraham, D. M. (1998). “Resource leveling of linear schedules using integer linear programming.” J. Constr. Eng. Manage., 124(3), 232–244.
Mingozzi, A., Maniezzo, V., Ricciardelli, S., and Bianco, L. (1998). “An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation.” Manage. Sci., 44(5), 714–729.
Popescu, C., and Charoenngam, C. (1995). Project planning, scheduling, and control in construction: An encyclopedia of terms and applications, Wiley-Interscience, New York.
Senouci, A. B., and Eldin, N. N. (2004). “Use of genetic algorithms in resource scheduling of construction projects.” J. Constr. Eng. Manage., 130(6), 869–877.
Son, J., and Mattila, K. G. (2004). “Binary resource leveling model: Activity splitting allowed.” J. Constr. Eng. Manage., 130(6), 887–894.
Son, J., and Skibniewski, M. J. (1999). “Multiheuristic approach for resource leveling problem in construction engineering: hybrid approach.” J. Constr. Eng. Manage., 125(1), 23–31.
Stevens, J. (1990). Techniques for construction network scheduling, McGraw-Hill, New York.
Zhang, H., Li, H., and Tam, C. M. (2006). “Permutation-based particle swarm optimization for resource-constrained project scheduling.” J. Comput. Civ. Eng., 20(2), 141–149.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 137Issue 12December 2011
Pages: 1080 - 1088

History

Received: Jul 25, 2010
Accepted: Feb 8, 2011
Published online: Feb 10, 2011
Published in print: Dec 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

Dho Heon Jun, Ph.D.
Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign, Urbana, IL.
Khaled El-Rayes, M.ASCE [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign, Urbana, IL (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share