Computerizing ICBF Method for Schedule Delay Analysis

Publication: Journal of Construction Engineering and Management
Volume 137, Issue 8

Abstract

Schedule delay is a common construction dispute. For analyzing schedule delays, a previous study had proposed an academic analysis method, the “isolated collapsed but-for” (ICBF) method. However, because many construction projects involve numerous complex activities, the procedure of using the ICBF method for schedule delay analysis is time-consuming. Therefore, this study used Microsoft Visual Basic for Applications (VBA) language and spreadsheet techniques to develop an Excel-based program for rapid delay analysis rather than manual calculation. A case study confirmed that the program automatically produces analytical results with only common delay documents (as-planned and as-built schedules and identified delay events). Compared with previous studies, schedule analysts can obtain analysis results quickly and correctly. Research results provide not only a convenient tool for schedule delay analysis but also a guide to computerize various academic delay analysis methods in the future.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors would like to thank the National Science Council, Taiwan, ROC, for financially supporting this research under Contract Nos. NSCTNSC 96-2221-E-216-027-MY2 and NSCTNSC 98-2811-E-216-002.

References

Alkass, S., Mazerolle, M., Tribaldos, E., and Harris, F. (1995). “Computer aided construction delay analysis and claims preparation.” Constr. Manage. Econ., 13(4), 335–352.
Alkass, A., Mazerolle, M., Tribaldos, E., and Harris, F. (1996). “Construction delay analysis techniques.” Constr. Manage. Econ., 14(5), 375–394.
Arditi, D., and Pattanakitchamroon, T. (2006). “Selecting a delay analysis method in resolving construction claims.” Int. J. Proj. Manage., 24(2), 145–155.
Bordoli, D. W., and Baldwin, A. N. (1998). “A methodology for assessing construction project delays.” Constr. Manage. Econ., 16(3), 327–337.
Bubshait, A. A., and Cunningham, M. J. (1998). “Comparison of delay analysis methodologies.” J. Constr. Eng. Manage., 124(4), 315–322.
Farrow, T. (2007). “Developments in the analysis of extensions of time.” J. Prof. Issues Eng. Educ. Pract., 133(3), 218–228.
Gothand, K. D. (2003). “Schedule delay analysis: Modified windows approach.” Cost Eng., 45(9), 18–23.
Hegazy, T., and Zhang, K. (2005). “Daily windows delay analysis.” J. Constr. Eng. Manage., 131(5), 505–512.
Kraiem, Z., and Diekmann, J. (1987). “Concurrent delays in construction projects.” J. Constr. Eng. Manage., 113(4), 591–602.
Lucas, E. D. (2002). “Schedule analyzer pro—An aid in the analysis of delay time impact analysis.” Cost Eng., 44(8), 30–36.
Mbabazi, A., Hegazy, T., and Saccomanno, F. (2005). “Modified but-for method for delay analysis.” J. Constr. Eng. Manage., 131(10), 1142–1144.
Microsoft Corporation. (2010a). “Visual Basic for Applications.” 〈http://msdn.microsoft.com/en-us/isv/bb190538.aspx〉 (Apr. 9, 2010).
Microsoft Corporation. (2010b). “Highlights for Office Excel 2007.” 〈http://www.microsoft.com/officebusiness/products/default.aspx?prod=Excel〉 (Apr. 9, 2010).
Mohan, S. B., and Al-Gahtani, K. S. (2006). “Current delay analysis techniques and improvement.” Cost Eng., 48(9), 12–21.
Ng, S. T., Skitmore, M., Deng, M. Z. M., and Nadeem, A. (2004). “Improving existing delay analysis techniques for the establishment of delay liabilities.” Constr. Innovation: Inf., Process, Manage., 4(1), 3–17.
Oracle Corporation. (2010). “Primavera enterprise project portfolio management.” 〈http://www.oracle.com/applications/primavera/index.html〉 (Apr. 9, 2010).
Palaneeswarana, E., and Kumaraswamy, M. M. (2008). “An integrated decision support system for dealing with time extension entitlements.” Autom. Constr., 17(4), 425–438.
Ron Winter Consulting Corporation. (2010). “Schedule analyzer overview.” 〈http://scheduleanalyzer.com/index.htm〉 (Apr. 9, 2010).
Yang, J. B. (2005). “Comparison of delay analysis software for construction projects.” Proc., 33rd Annual Canadian Society for Civil Engineering (CSCE) Conf., CT-115, Toronto, Canada, 1–9.
Yang, J. B., and Kao, C. K. (2007). “A knowledge map for delay analysis development.” Proc., 4th Int. Conf. on Construction in the 21st Century, Gold Coast, Australia.
Yang, J. B., and Kao, C. K. (2009). “Review of delay analysis methods: A process-based comparison.” Open Construct. Build. Technol. J., 3(1), 81–89.
Yang, J. B., Kao, C. K., and Lee, Y. Y. (2006). “System requirement analysis of a construction delay analysis system.” Proc., 23rd Int. Symp. on Automation and Robotics in Construction, Tokyo, 102–106.
Yang, J. B., and Yin, P. C. (2009). “Isolated collapsed but-for delay analysis methodology.” J. Constr. Eng. Manage., 135(7), 570–578.
Zack, J. G. (2001). “But-for schedules—Analysis and defense.” Cost Eng., 43(8), 13–17.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 137Issue 8August 2011
Pages: 583 - 591

History

Received: Apr 8, 2010
Accepted: Dec 8, 2010
Published online: Dec 10, 2010
Published in print: Aug 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

Jyh-Bin Yang [email protected]
Professor, Institute of Construction Engineering and Management, National Central Univ., No. 300, Jhongda Rd., Jhongli City, Taoyuan County 32001, Taiwan (corresponding author). E-mail: [email protected]
Ming-Kuan Tsai [email protected]
Postdoctoral Researcher, GIS Research Center, Feng Chia Univ., No. 100, Wenhwa Rd., Seatwen, Taichung, Taiwan. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share