Improving Productivity on a Troubled Bridge Project

Publication: Journal of Construction Engineering and Management
Volume 137, Issue 5

Abstract

This paper presents a case study of a bridge constructed under adverse conditions in rural Florida. The major challenges facing the contractor were clearly identified through analysis. The bridge was constructed by an established, experienced bridge contractor that faced many daunting challenges in the construction of the bridge foundation, ranging from overdesign to the project manager managing his first construction project. However, the biggest challenge was unforeseen site conditions; namely, some of the most difficult clay imaginable through which to drive piles. These challenges forced the contractor into several tactical maneuvers. In sharing both the methods adapted by the contractor and the results of the adaptations, this paper quantifies for researchers and practitioners how a good contractor made sound, fundamental decisions to overcome severe challenges, improve productivity rates midproject, and eventually make the project a success. A seeming disaster early on, the project was eventually completed in less than the contract duration and at a sizable profit for the contractor.

Get full access to this article

View all available purchase options and get full access to this article.

References

Borcherding, J. D., Samelson, N. M., and Sebastian, S. M. (1980). “Improving motivation and productivity on large projects.” J. Constr. Eng. Manage., 106(1), 73–89.
Means, R. S. (2007). Heavy construction cost data, 21st Ed., RSMeans Construction Publishers and Consultants, Kingston, MA.
Thomas, H. R. (2000). “Schedule acceleration, work flow, and labor productivity.” J. Constr. Eng. Manage., 126(4), 261–267.
Thomas, H. R., and Kramer, D. F. (1987). “Construction productivity measurement and performance evaluation.” Source Document 35, Construction Industry Institute, Austin, TX.
Thomas, H. R., Minchin, R. E., and Chen, D. (2003). “Role of workforce management in bridge substructure labor productivity.” J. Manage. Eng., 19(1), 9–16.
Thomas, H. R., and Napolitan, C. L. (1995). “Quantitative effects of construction changes on labor productivity.” J. Constr. Eng. Manage., 121(3), 290–296.
Zayed, T. M., and Halpin, D. W. (2005). “Productivity and cost regression models for pile construction.” J. Constr. Eng. Manage., 131(7), 779–789.
Zhou, L. (2007). “Study on elastic modulus and recovery coefficient of cushioning materials in pile driving.” J. Mater. Civ. Eng., 19(4), 313–320.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 137Issue 5May 2011
Pages: 364 - 371

History

Received: Jun 28, 2008
Accepted: Sep 8, 2010
Published online: Sep 10, 2010
Published in print: May 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

R. Edward Minchin Jr., M.ASCE [email protected]
Associate Professor of Construction, Rinker School of Building Construction, Univ. of Florida, 304 Rinker Hall, Gainesville, FL 32611-5703 (corresponding author). E-mail: [email protected]
Don W. Lewis [email protected]
Postdoctoral Research Assistant, Dept. of Civil and Coastal Engineering, Univ. of Florida, 345 Weil Hall, Gainesville, FL 32611-5703. E-mail: [email protected]
Luke McLeod [email protected]
Graduate Research Assistant, Rinker School of Building Construction, Univ. of Florida, 304 Rinker Hall, Gainesville, FL 32611-5703. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share