Improving Productivity on a Troubled Bridge Project
Publication: Journal of Construction Engineering and Management
Volume 137, Issue 5
Abstract
This paper presents a case study of a bridge constructed under adverse conditions in rural Florida. The major challenges facing the contractor were clearly identified through analysis. The bridge was constructed by an established, experienced bridge contractor that faced many daunting challenges in the construction of the bridge foundation, ranging from overdesign to the project manager managing his first construction project. However, the biggest challenge was unforeseen site conditions; namely, some of the most difficult clay imaginable through which to drive piles. These challenges forced the contractor into several tactical maneuvers. In sharing both the methods adapted by the contractor and the results of the adaptations, this paper quantifies for researchers and practitioners how a good contractor made sound, fundamental decisions to overcome severe challenges, improve productivity rates midproject, and eventually make the project a success. A seeming disaster early on, the project was eventually completed in less than the contract duration and at a sizable profit for the contractor.
Get full access to this article
View all available purchase options and get full access to this article.
References
Borcherding, J. D., Samelson, N. M., and Sebastian, S. M. (1980). “Improving motivation and productivity on large projects.” J. Constr. Eng. Manage., 106(1), 73–89.
Means, R. S. (2007). Heavy construction cost data, 21st Ed., RSMeans Construction Publishers and Consultants, Kingston, MA.
Thomas, H. R. (2000). “Schedule acceleration, work flow, and labor productivity.” J. Constr. Eng. Manage., 126(4), 261–267.
Thomas, H. R., and Kramer, D. F. (1987). “Construction productivity measurement and performance evaluation.” Source Document 35, Construction Industry Institute, Austin, TX.
Thomas, H. R., Minchin, R. E., and Chen, D. (2003). “Role of workforce management in bridge substructure labor productivity.” J. Manage. Eng., 19(1), 9–16.
Thomas, H. R., and Napolitan, C. L. (1995). “Quantitative effects of construction changes on labor productivity.” J. Constr. Eng. Manage., 121(3), 290–296.
Zayed, T. M., and Halpin, D. W. (2005). “Productivity and cost regression models for pile construction.” J. Constr. Eng. Manage., 131(7), 779–789.
Zhou, L. (2007). “Study on elastic modulus and recovery coefficient of cushioning materials in pile driving.” J. Mater. Civ. Eng., 19(4), 313–320.
Information & Authors
Information
Published In
Copyright
© 2011 American Society of Civil Engineers.
History
Received: Jun 28, 2008
Accepted: Sep 8, 2010
Published online: Sep 10, 2010
Published in print: May 1, 2011
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.