Estimation of Time for Wenchuan Earthquake Reconstruction in China
Publication: Journal of Construction Engineering and Management
Volume 137, Issue 3
Abstract
Time is considered extremely urgent in China’s Wenchuan earthquake reconstruction. However, little research has been undertaken on estimating the time needed for reconstruction in China, especially for this specific reconstruction. Therefore, this paper aims to explore the time-cost relationship for the Wenchuan earthquake reconstruction. Both the Bromilow’s time-cost (BTC) model and the Elman network (EN) model have been developed to predict the time of Wenchuan earthquake reconstruction projects. Data have been obtained from 72 completed construction projects in the six cities that were seriously affected by the major Wenchuan earthquake. The result from the BTC model has been compared with that from the EN model to determine which one is more accurate. The results show that the EN model provides a more accurate time prediction for Wenchuan earthquake reconstruction than the BTC model does, though the BTC model is more suitable for application in practice. It is also shown that the proposed models are both useful for estimating the duration of reconstruction projects.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research was supported by the emergency research program of the National Natural Science Foundation of China (NSFC Grant No. 70841011), the Key Program of NSFC (Grant No. NSFC70831005) and the National Science Foundation for Distinguished Young Scholars, P. R. China (Grant No. UNSPECIFIED70425005). The writers wish to thank the anonymous reviewers for their helpful and constructive comments and suggestions in improving the quality of this paper.
References
Adela, H., and Wu, M. (1998). “Regularization neural network for construction cost estimation.” J. Constr. Eng. Manage., 124(1), 18–24.
Attalla, M., and Hegazy, T. (2003). “Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.” J. Constr. Eng. Manage., 129(4), 405–411.
Boussabaine, A. H. (1996). “The use of artificial neural networks in construction management: A review.” Constr. Manage. Econ., 14(5), 427–436.
Bromilow, F. J. (1969). “Contract time performance expectations and the reality.” Build. Forum, 1(3), 70–80.
Bromilow, F. J., and Henderson, J. A. (1976). “Procedures for reckoning and valuing the performance of building contracts.” Rep. B3.1-4.2.2nd, Division of Building Research Special, Melbourne, Australia.
Bromilow, F. J., Hinds, M. F., and Moody, N. F. (1980). “AIQS survey of building contract time performance.” Build. Econ., 19(2), 79–82.
Chan, A. P. C. (1999). “Modelling building durations in Hong Kong.” Constr. Manage. Econ., 17(2), 189–196.
Chan, A. P. C. (2001). “Time-cost relationship of public sector projects in Malaysia.” Int. J. Project Manage., 19(4), 223–229.
Chan, D. W. M., and Kumaraswamy, M. M. (1995). “A study of the factors affecting construction durations in Hong Kong.” Constr. Manage. Econ., 13(4), 319–333.
Chan, D. W. M., and Kumaraswamy, M. M. (2002). “Compressing construction durations: Lessons learned from Hong Kong building projects.” Int. J. Project Manage., 20(1), 23–35.
Chen, W. T., and Huang, Y. H. (2006). “Approximately predicting the cost and duration of school reconstruction projects in Taiwan.” Constr. Manage. Econ., 24, 1231–1239.
Choudhury, I., and Rajan, S. S. (2003). “Time-cost relationship for residential construction in Texas.” Construction Informatics Digital Library, 〈http://itc.scix.net/〉 (Jan. 6, 2009).
Chua, D. K. H., Kog, Y. C., Loh, P. K., and Jaselskis, E. J. (1997). “Model for construction budget performance—Neural network approach.” J. Constr. Eng. Manage., 123(3), 214–222.
Department of Construction of Sichuan Province (DCS). (2000). “Pricing norm of construction works in Sichuan.” Sichuan Science and Technology Press, Chengdu, China.
Elhag, T. M. S., and Wang, Y. M. (2007). “Risk assessment for bridge maintenance projects: Neural networks versus regression techniques.” J. Comput. Civ. Eng., 21(6), 402–409.
Elman, J. L. (1990). “Finding structure in time.” Cognitive Sci., 14(2), 179–211.
Emsley, M. W., Lowe, D. J., Duff, A. R., Harding, A., and Hickson, A. (2002). “Data modelling and the application of a neural network approach to the prediction of total construction costs.” Constr. Manage. Econ., 20(6), 465–473.
Ekici, S., Yildirim, S., and Poyraz, M. (2009). “A transmission line fault locator based on Elman recurrent networks.” Appl. Soft Comput., 9(1), 341–347.
Garza, J. M., Prateapusanond, A., and Ambani, N. (2007). “Preallocation of total float in the application of a critical path method based construction contract.” J. Constr. Eng. Manage., 133(11), 836–845.
Hoffman, G. J., Thal, A. E., Jr, Webb, T. S., and Weir, J. D. (2007). “Estimating performance time for construction projects.” J. Manage. Eng., 23(4), 193–199.
Ireland, V. (1983). “The role of managerial actions in the cost, time, and high rise commercial building projects.” Ph.D. thesis, Univ. of Sydney, NSW, Australia.
Kaka, A., and Price, A. D. F. (1991). “Relationship between value and duration of construction projects.” Constr. Manage. Econ., 9(4), 383–400.
Liou, C. Y., Huang, J. C., and Yang, W. C. (2008). “Modeling word perception using the Elman network.” Neurocomputing; Variable Star Bulletin, 71(16-18), 3150–3157.
Love, P. E. D., Tse, R. Y. C., and Edwards, D. J. (2005). “Time-cost relationships in Australian building construction projects.” J. Constr. Eng. Manage., 131(2), 187–194.
Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD). (2000). “Quota for construction duration.” China Planning Press, Bejing, P. R. China.
Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD). (2001). “Standards for construction enterprise qualification levels.” CC(2001) 82 (Jul. 1, 2001).
Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD). (2003). “Code of valuation with bill quantity of construction works.” China Planning Press, Bejing, China
Moselhi, O., Hegazy, T., and Fazio, P. (1991). “Neural networks as tools in construction.” J. Constr. Eng. Manage., 117(4), 606–625.
Nasir, D., McCabe, B., and Hartono, L. (2003). “Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model.” J. Constr. Eng. Manage., 129(5), 518–527.
National Development and Reform Commission (NDRC). (2008). Special plans for post-Wenchuan earthquake infrastructure restoration and reconstruction, NDRC People’s Republic of China, 〈http://www.sdpc.gov.cn/xwfb/t20081107_245074.htm〉 (Jan. 6, 2009).
Ng, S. T., Mak, M. M. Y., Skitmore, R. M., Lam, K. C., and Varnam, M. (2001). “The predictive ability of Bromilow’s time-cost model.” Constr. Manage. Econ., 19(2), 165–173.
Ng, S. T., Wong, T. C. Y., Cheung, S. O., and Skitmore, M. (2004). “An integrated regression analysis and time series model for construction tender price index forecasting.” Constr. Manage. Econ., 22(5), 483–492.
Ogunsemi, D. R., and Jagboro, G. O. (2006). “Time-cost model for building projects in Nigeria.” Constr. Manage. Econ., 24(3), 253–258.
Sukumaran, P., Bayraktar, M. E., Hong, T., and Hastak, M. (2006). “Model for analysis of factors affecting construction schedule in highway work zones.” J. Transp. Eng., 132(6), 508–517.
Sungmin, Y., and Carlos, C. (2009). “Analysing decision variables that influence preliminary feasibility studies using data mining techniques.” Constr. Manage. Econ., 27(1), 73–87.
Tah, J. H. M., and Carr, V. (2001). “Knowledge-based approach to construction project risk management.” J. Comput. Civ. Eng., 15(3), 170–177.
Übeylï, M., and Übeylï, E. D. (2010). “Using recurrent neural networks for estimation of minor actinides’ transmutation in a high power density fusion reactor.” Expert Syst. Appl., 37(4), 2742–2746.
Walker, D. H. T. (1995). “An investigation into construction time performance.” Constr. Manage. Econ., 13(3), 263–274.
Williams, T. P. (1994). “Predicting changes in construction cost indexes using neural networks.” J. Constr. Eng. Manage., 120(2), 306–320.
Xu, J. P., and Sun, C. Y. (2008). “Analysis of the factors affecting durations of post-Wenchuan earthquake reconstruction.” World Sci-Tech R & D, 30(4), 509–515 (in Chinese).
Yeong, C. M. (1994). “Time and cost performance of building contracts in Australia and Malaysia.” M.Sc. thesis, Univ. of South Australia.
Information & Authors
Information
Published In
Copyright
© 2011 American Society of Civil Engineers.
History
Received: Apr 26, 2009
Accepted: Aug 25, 2010
Published online: Aug 31, 2010
Published in print: Mar 1, 2011
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.