Proving and quantifying lost productivity due to cumulative impacts of multiple changes are difficult tasks. This paper presents the most acceptable methods from case law and demonstrates their applications for analyzing the loss of productivity. These methods include earned value analysis, measured mile analysis, and combinations of these two. They are either well established or drawn from recent court and board decisions. A case study is used to illustrate and compare the use of these methods. These methods result in considerably different loss of productivity values though the actual amount (i.e., inefficiency in labor hours) is unique for a particular case and though these methods are often thought to be similar or even the same. How a measured mile analysis and its variants are employed affects the amount of lost productivity estimated. The variants can avoid some drawbacks of measured mile and earned value studies. Nevertheless, which method is more accurate and reliable is difficult to provide for a particular claim. Practitioners should choose between them based on the availability of project records and the nature of changes and cumulative impacts. Practitioners may also employ two or more methods to perform a “sensitivity analysis” of the chosen methods and persuade the other party and/or the jury that their estimate of lost productivity is sufficiently certain.

Get full access to this article

View all available purchase options and get full access to this article.

References

Amelco Electric v. City of Thousand Oaks, 27 Cal. 4th 228, 115 Cal. Rptr. 2d 900, 38 P.3d 1120, rehearing denied by 2002 Cal. LEXIS 1689 (March 13, 2002).
The Appeal of Coates Industrial Piping, Inc., VABCA No. 5412 (July 26, 1999).
The Appeal of Gulf Coast Trading Co., ENGBCA No. 5795 (1994).
The Appeal of P. J. Dick, Inc., VABCA Nos. 6080–6082, 01-2 BCA (CCH) (September 27, 2001).
Association for the Advancement of Cost Engineering (AACE) International, Inc. (2004). “Estimating lost labor productivity in construction claims.” AACE International Recommended Practice No. 25R-03, Morgantown, W.Va.
Atlas Constr. Co., Inc., GSBCA No. 8593, 90-1 B.C.A (CCH) (1990).
Bell BCI Co. v. United States, No. 03-1613C, 81 Fed. Cl. 617 (April 21, 2008).
C. Norman Peterson Co. v. Container Corp., 172 Cal. App. 3d 628, 218 Cal. Rptr. 592 (1985).
Centex Bateson Construction Co., VABCA No. 4613, 99-1 BCA 30,153, at 149,259 (1998).
Central Mechanical Constr., ASBCA No. 29434, 86-3 BCA (CCH) (1986).
Charles G. Williams Constr., Inc., ASBCA No. 33766, 89-2 B.C.A, CCH (1989).
Clark Concrete Contractors, Inc. v. General Services Administration, GSBCA No. 14340, 99-1 BCA (CCH) (1999).
The Clark Construction Group, Inc., VABCA No. 5674, 00-1 B.C.A (April 5, 2000).
Coley Properties Corp. v. United States, 593 F.2d 380 (1979).
David J. Tiernay, GSBCA Nos. 7107, 6198, 88-2 BCA. (CCH) (1988).
Dawson Constr. Co., VABCA Nos. 3306–3310, 93-3 BCA. (CCH) (1993), affirmed, 34 F.3d 1080 (Fed. Cir. 1994).
Dyson & Co., ASBCA No. 21673, 78-2 BCA, CCH (1978).
Electronics & Missile Facilities v. United States, 416 F.2d 1345 (Ct. Cl. 1969).
Freeman-Darling, Inc., GSBCA No. 7112 (April 27, 1989).
Fru-Con Constr. Corp. v. United States, 43 Fed. Cl. 306 (Ct. Cl. 1999).
Gulezian, R., and Samelian, F. (2003). “Baseline determination in construction labor productivity-loss claims.” J. Manage. Eng., 19(4), 160–165.
Hanna, A. S. (2001). “Quantifying the cumulative impact of change orders or electrical and mechanical contractors.” Research Report 158–11, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Ibbs, C. W., and Allen, W. E. (1995). “Quantitative impacts of project change.” Source Document 108, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Ibbs, W., and Liu, M. (2005). “Improved measured mile analysis technique.” J. Constr. Eng. Manage., 131(12), 1249–1256.
Ibbs, W., Nguyen, L. D., and Lee, S. (2007). “Quantified impacts of project change.” J. Profl. Issues Eng. Educ. Pract., 133(1), 45–52.
James Corporation d/b/a James Construction v. North Allegheny School District, et al., No. 1268 C.D. 2007 (Pa. Comwlth. November 30, 2007).
Jones, R. M. (2003). “Update on proving and pricing inefficiency claims.” Constr. Lawyer, 23(Summer), 3–11.
Leonard, C. (1988). “The effect of change orders on productivity.” MS thesis, Concordia Univ., Montreal, Quebec.
Litton Systems, Inc., Ingalls Shipbuilding Division, ASBCA No. 17578, 78-1 B.C.A, CCH (1978).
Loulakis, M. C., and Santiago, S. J. (1999). “Getting the most out of your ‘measured mile’ approach.” Civ. Eng. (N.Y.), 69(11), 69.
McConnell, H. H. (1997). “Distinguishing quantum meruit and unjust enrichment in the construction setting.” The Florida Bar Journal, 71(3), 88.
Pittman Constr. Co. v. United States, 2 Cl. Ct. 211 (1983).
Rice v. United States, 317 U.S. 61, 64-65 (1942).
Southwest Marine, Inc., DOT BCA No. 1663, 94-3 BCA, CCH (1994).
State ex rel. Dept. of Transp. v. Guy F. Atkinson Co., 187 Cal. App. 3d 25, 231 Cal. Rptr. 382 (1986).
Thomas, H. R., and Sanvido, V. E. (2000). “Quantification of losses caused by labor inefficiencies: Where is the elusive measured mile?” Constr. Law Bus., 1(3), 1–14.
Thomas, H. R., and Završki, I. (1999). “Construction baseline productivity: Theory and practice.” J. Constr. Eng. Manage., 125(5), 295–303.
Triax Co. v. United States, 28 Fed. Cl. 733 (1993).
Watt Plumbing, Air Conditioning & Elec., Inc. v. Tulsa Rig, Reel & Mfg. Co., 533 P.2d 980, 983 (Sup. Ct. Okla. 1975).
Zink, D. A. (1986). “The measured mile: Proving construction inefficiency costs.” Coastal Eng., 28(4), 19–21.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 8August 2010
Pages: 826 - 833

History

Received: May 7, 2009
Accepted: Jan 25, 2010
Published online: Jan 28, 2010
Published in print: Aug 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Long D. Nguyen [email protected]
Lecturer, Faculty of Civil Engineering, Ho Chi Minh City Univ. of Technology, Vietnam; formerly, Construction Consultant, Jax Kneppers Associates, Inc. (JKA), Walnut Creek, CA 94598. E-mail: [email protected]
William Ibbs, M.ASCE [email protected]
Professor of Construction Management, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720; and, President, The Ibbs Consulting Group, Inc., Oakland, CA 94618. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share