Artificial Neural Network Model for Cost Estimation: City of Edmonton’s Water and Sewer Installation Services
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 7
Abstract
Over the years of the study (1999–2004) presented in this paper, the City of Edmonton, Canada’s Drainage and Maintenance Department has experienced an annual increase of about 12% in the installation of water and sewer services for residential facilities. According to the current estimating procedure, a discrepancy of up to 60% exists between the estimated and actual costs of these projects. A detailed analysis of all activities involved in the installation of the water and sewer services has been carried out and is presented in this paper. The proposed methodology, which is based upon the analysis of past data obtained from the City of Edmonton’s drainage division for the period of 1999–2004, is also presented. The methodology has been incorporated into a computer module, which integrates the concept of artificial neural network (ANN) with the current estimating system used by the City of Edmonton. The following research includes a description of the algorithm used in ANN, as well as an assessment of past data obtained from the city record for over 800 jobs (cases) performed over the period of the study.
Get full access to this article
View all available purchase options and get full access to this article.
References
AbouRizk, S., Knowles, P., and Hermann, U. (2001). “Estimating labor productivity for industrial construction activities.” J. Constr. Eng. Manage., 127(6), 502–511.
Duff, R., Emsley, M., Gregory, M., Lowe, D., and Masterman, J. (1998). “Development of a model of total building procurement costs for construction clients.” Proc., ARCOM 14th Annual Conf., Univ. of Reading, Reading, U.K., 210–218.
Environment Canada. (2005). “Edmonton temperature data 2005.” ⟨http://www.climate.weatheroffice.ec.gc.ca/climateData⟩ (Mar. 6, 2005).
Harding, A., Lowe, D., Emsley, M., Hickson, A., and Duff, R. (1999). The role of neural networks in early stages of cost estimation in the 21st century, RICS Research Foundation, London, U.K.
Kung, D. (2005). “Process and productivity improvement study for the sewer and water service installation by the City of Edmonton construction crews.” M. Eng. report, Univ. of Alberta, Canada.
NeuroShell 2; release 4.0. (1998). Ward Systems Group® Inc., Frederick, Md. ⟨http://www.wardsystems.com⟩ (March 2006).
Portas, J., and AbouRizk, S. (1997). “A neural network model for estimating construction productivity.” J. Constr. Eng. Manage., 123(4), 399–410.
Schexnayder, C. J., and Mayo, R. E. (2003). Construction management fundamentals, McGraw-Hill, Boston, Mass.
Sodikov, J. (2005). “Cost estimation of highway projects in developing countries: Artificial neural network approach.” J. East. Asia Soc. Transp. Stud., 6, 1036–1047.
Tsoukalas, L. H., and Uhrig, R. E. (1996). Fuzzy and neural approaches in engineering.
Information & Authors
Information
Published In
Copyright
© 2010 ASCE.
History
Received: Apr 9, 2008
Accepted: Dec 17, 2009
Published online: Dec 19, 2009
Published in print: Jul 2010
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.