Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 6
Abstract
This paper further develops the models proposed by prior research in the field of workspace conflict using four-dimensional computer-aided design. The approach developed here analyzes spatial demand and supply from the perspective of construction operators, and a modeling methodology based on spatiotemporal utilization is proposed. The utilization factor model is developed to show that the criticality of the operator’s spatiotemporal demand leads to worksite congestion and that congestion is a form of worksite conflict. The interference of other space entities increases the space demand, and this increment is quantified with a “dynamic space interference” index This indicator is developed to identify activity spaces which suffer congestion. A decision making tool, the “congestion penalty indicator,” is developed which obtains a schedule-level value for analysis, evaluation, and comparison. Finally, a case study on the refurbishment of an oil refinery column is used to demonstrate the application of the above concepts in successfully identifying a better schedule with respect to on-site congestion.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The writers thank Mr. Peter Ho, Mr. Eric Har, Mr. Neo Chee Keong, and Mr. Wong Pinyan of JGC Singapore Pte., Ltd. for their assistance in providing the case study.
References
Akinci, B., Fischen, M., Levitt, R., and Carlson, R. (2002a). “Formalization and automation of time-space conflict analysis.” J. Comput. Civ. Eng., 16(2), 124–134.
Akinci, B., Fischer, M., and Kunz, J. (2002b). “Automated generation of work spaces required by construction activities.” J. Constr. Eng. Manage., 128(4), 306–315.
Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2002c). “Representing work spaces generically in construction method models.” J. Constr. Eng. Manage., 128(4), 296–305.
Dawood, N., and Mallasi, Z. (2006). “Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies.” Comput. Aided Civ. Infrastruct. Eng., 21(7), 498–513.
Guo, S. -J. (2002). “Identification and resolution of work space conflicts in building construction.” J. Constr. Eng. Manage., 128(4), 287–295.
Koo, B., and Fischer, M. (2000). “Feasibility study of 4D CAD in commercial construction.” J. Constr. Eng. Manage., 126(4), 251–260.
Mallasi, Z. (2006). “Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation.” Autom. Constr., 15(5), 640–655.
McKinney, K., and Fischer, M. (1998). “Generating, evaluating and visualizing construction schedules with CAD tools.” Autom. Constr., 7(6), 433–447.
Riley, D. R., and Sanvido, V. E. (1995). “Patterns of construction-space use in multistory buildings.” J. Constr. Eng. Manage., 121(4), 464–473.
Riley, D. R., and Sanvido, V. E. (1997). “Space planning method for multistory building construction.” J. Constr. Eng. Manage., 123(2), 171–180.
Song, Y., and Chua, D. K. H. (2005). “Detection of spatio-temporal conflicts on a temporal 3D space system.” Adv. Eng. Software, 36(11–12), 814–826.
Thabet, W. Y., and Beliveau, Y. J. (1994a). “HVLS: Horizontal and vertical logic scheduling for multistory projects.” J. Constr. Eng. Manage., 120(4), 875–892.
Thabet, W. Y., and Beliveau, Y. J. (1994b). “Modeling work space to schedule repetitive floors in multistory buildings.” J. Constr. Eng. Manage., 120(1), 96–116.
Winch, G. M., and North, S. (2006). “Critical space analysis.” J. Constr. Eng. Manage., 132(5), 473–481.
Zouein, P. P., and Tommelein, I. D. (2001). “Improvement algorithm for limited space scheduling.” J. Constr. Eng. Manage., 127(2), 116–124.
Information & Authors
Information
Published In
Copyright
© 2010 ASCE.
History
Received: Jun 17, 2008
Accepted: Oct 26, 2009
Published online: May 14, 2010
Published in print: Jun 2010
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.