CASE STUDIES
Oct 22, 2009

Empire State Building Project: Archetype of “Mass Construction”

Publication: Journal of Construction Engineering and Management
Volume 136, Issue 6

Abstract

Analysis of historical projects, with the dual benefits of hindsight and modern concepts of construction systems, can help fill the gaps in our theoretical understanding of production in construction, which have increasingly been identified as a barrier to progress in improving construction project management. The richness of the historical record describing construction of the Empire State Building provides a unique opportunity to analyze and compare it with the paradigms of craft, industrialized, and lean construction. Its size and its record rate of construction, which has not been broken since for tall buildings, make it of prime interest. The project progress was reconstructed using line-of-balance software and its different flows were assessed. The results lead to the conclusion that it is an archetypal example of what we propose be called “mass construction.” This enables a richer understanding of the taxonomy of production systems in construction, and should aid theoreticians and practitioners alike to devise better production systems for construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers thank Sven Bertelsen for posing the initial question regarding the comparison of the Empire State Building project to modern projects, and for the productive discussions and collaboration that ensued.

References

Akinci, B., Fischer, M., and Kunz, J. (2002). “Automated generation of work spaces required by construction activities.” J. Constr. Eng. Manage., 128(4), 306–315.
Ballard, G. (2000a). “Lean project delivery system.” ⟨http://www.leanconstruction.org/⟩ (April 2010).
Ballard, G. (2000b). “The last planner system of production control.” Ph.D. dissertation, Univ. of Birmingham, Birmingham, U.K.
Ballard, G., and Howell, G. (1998). “Shielding production: Essential step in production control.” J. Constr. Eng. Manage., 124(1), 11–17.
Bertelsen, S., Henrich, G., Koskela, L., and Rooke, J. (2007). “Construction physics.” Proc., 15th Conf. of the Int. Group for Lean Construction, C. Pasquire and P. Tzortzopoulous, eds., Michigan State Univ., East Lansing, Mich., 13–26.
Bertelsen, S., and Sacks, R. (2007). “Towards a new understanding of the construction industry and the nature of its production.” Proc., 15th Conf. of the Int. Group for Lean Construction, C. Pasquire and P. Tzortzopoulous, eds., Michigan State Univ., East Lansing, Mich., 46–56.
Census. (2009). “The 2009 statistical abstract: Selected economic indicators.” HS-40, U.S. Census Bureau, ⟨http://www.census.gov/compendia/statab/hist_stats.html⟩ (April 2010).
Emporis. (2009). “Official world’s 200 tallest high-rise buildings.” Emporis Corporation, ⟨http://www.emporis.com/en/bu/sk/st/tp/wo/⟩ (April 2010).
Freire, J., and Alarcon, L. F. (2002). “Achieving lean design process: Improvement methodology.” J. Constr. Eng. Manage., 128(3), 248–256.
Gann, D. (2000). Building innovation: Complex constructs in a changing world, Thomas Telford, London.
Gann, D. M. (1996). “Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan.” Constr. Manage. Econom., 14(5), 437–450.
Henrich, G., Tilley, P., and Koskela, L. (2005). “Context of production control in construction.” Proc., 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., UNSW, Sydney, Australia, 189–198.
Hopp, W. J., and Spearman, M. L. (1996). Factory physics, IRWIN, Chicago.
Koskela, L. (1992). “Application of the new production philosophy to construction.” Technical Rep. No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
Koskela, L. (2000). “An exploration towards a production theory and its application to construction.” D.Tech. thesis, Helsinki Univ. of Technology, Espoo, Finland.
Koskela, L., and Howell, G. (2002). “The underlying theory of project management is obsolete.” Proc., PMI Research Conf., D. P. Slevin, D. I. Cleveland, and J. K. Pinto, eds., Project Management Institute, Seattle, 293–302.
Liker, J. E. (2003). The Toyota way, McGraw-Hill, New York.
Mossman, A. (2007). “Lean logistics: Helping to create value by bringing people, information, plant, equipment and materials together at the workface.” Proc., 15th Conf. of the Int. Group for Lean Construction, C. Pasquire and P. Tzortzopoulous, eds., Michigan State Univ., East Lansing, Mich., 198–211.
Ohno, T. (1988). Toyota production system: Beyond large-scale production, Productivity Press, Cambridge, Mass.
Partouche, R. (2009). “A lean model for construction management of tall office/commercial buildings.” MS thesis, Technion–Israel Institute of Technology, Haifa, Israel.
Sacks, R., and Goldin, M. (2007). “Lean management model for construction of high-rise apartment buildings.” J. Constr. Eng. Manage., 133(5), 374–384.
SkyscraperPage. (2008). “SkyscraperPage.com.” Skyscraper Source Media, ⟨http://skyscraperpage.com/⟩ (April 2010).
Tauranac, J. (1995). The Empire State Building: The making of a landmark, Charles Scribner’s Sons, New York.
Taylor, F. W. (1911). The principles of scientific management, W.W. Norton & Company, New York.
Trebilcock, P. (2004). “Managing design and construction.” Designing better buildings, Vol. 220, S. Macmillan, ed., Taylor and Francis, London.
Warszawski, A. (1990). Industrialization and robotics in building: A managerial approach, HarperCollins, New York.
Willis, C. (2005). “Virtual index virtual archive. 2.” The Skyscraper Museum, ⟨http://www.skyscraper.org/viva2/viva2.html/⟩ (April 2010).
Willis, C., and Friedman, D. (1998). Building the Empire State Building, W.W. Norton & Company, New York.
Womack, J. P., Jones, D. T., and Roos, D. (1991). The machine that changed the world, Harper Business, New York.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 6June 2010
Pages: 702 - 710

History

Received: Feb 9, 2009
Accepted: Oct 13, 2009
Published online: Oct 22, 2009
Published in print: Jun 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Associate Professor, Faculty of Civil and Environmental Engineering, Technion–Israel Institute of Technology, Haifa 32000, Israel (corresponding author). E-mail: [email protected]
R. Partouche [email protected]
Graduate Student, Faculty of Civil and Environmental Engineering, Technion–Israel Institute of Technology, Haifa 32000, Israel. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share