Experimental Research in Construction
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 1
Abstract
Humans’ unique use of tools originated with their capability to observe, to link causes with effects and to conduct trial and error experiments. Experimental research today is still using these same basic elements albeit augmented by sophisticated tools and methods. Researchers conducting scientific experiments in the construction arena, however, face a “harsh” environment to work in. This paper draws from 20 years of experimental work in construction and engineering education. It provides a short historic background before discussing a framework useful to categorize the various ways researchers conducted experiments that provided meaningful results. Many examples are used to underscore the most important points.
Get full access to this article
View all available purchase options and get full access to this article.
References
Bagheri-Zadeh, S. H., Kim, H. K., Hounsell, S., Wood, C. R., Soleymani, H., and King, M. (2007). “Field study of concrete maturity methodology in cold weather.” J. Constr. Eng. Manage., 133(11), 827–835.
Bernold, L. E. (2005). “A paradigm shift in education is vital for the future of our profession.” J. Constr. Eng. Manage., 131(5), 535–542.
Bernold, L. E. (2007). “Teaching evaluations for construction engineering and management: Opportunity to move us forward.” J. Constr. Eng. Manage., 133(2), 146–156.
Bernold, L. E., Bingham, W. L., McDonald, P. H. and Attia, T. M. (2000). “Influence of learning type oriented teaching on academic success of engineering students.” J. Eng. Educ., ASEE, April, 191–199.
Chu, B., et al. (2008). “GA-based fuzzy controller design for tunnel ventilation systems.” Autom. Constr., 17(2), 130–136.
Clarke, D. (2006). Descartes: A biography, Cambridge University, Cambridge, U.K.
Code of Federal Regulations. (2009). “Title 45-Public Welfare.” Dept. of Health and Human Services, Part 46, Protection of Human Subjects, ⟨http://www.hhs.gov/ohrp/humansubjects/guidance/45cfr46.htm#46.101⟩(Jan 12, 2009).
Dunston, P. S., and Bernold, L. E. (2000). “Adaptive control for safe and quality rebar fabrication.” J. Constr. Eng. Manage., 126(2), 122–129.
Dunston, P. S., Savage, B. M., and Mannering, F. L. (2000). “Weekend closure for construction of asphalt overlay on urban highway.” J. Constr. Eng. Manage., 126(4), 313–319.
Jaselskis, E. J., Gao, A., and Walters, R. C. (2005). “Improving transportation projects using laser scanning.” J. Constr. Eng. Manage., 131(3), 377–384.
Jaselskis, E. J., Han, H. C., Grigas, J., Tan, L., and Fahrion, D. (2001). “Status of roller mountable microwave asphalt pavement.” J. Constr. Eng. Manage., 127(1), 1–46.
Kolera, B. T., and Bernold, L. E. (2006). “Intelligent utility locating tool for excavators.” J. Constr. Eng. Manage., 132(9), 919–927.
Lee, E. B., Lee, H., and Ibbs, C. W. (2007). “Productivity aspects of urban freeway rehabilitation with accelerated construction.” J. Constr. Eng. Manage., 133(10), 798–806.
Lee, J., Lorenc, S. J., and Bernold, L. E. (2003). “A comparative performance evaluation of tele-operated pipe laying.” J. Constr. Eng. Manage., 129(1), 32–40.
Lee, J. H., Yoo, H. S., Kim, Y. S., Lee, J. B., and Cho, M. Y. (2006). “The development of a machine vision-assisted, teleoperated pavement crack sealer.” Autom. Constr., 15(5), 616–626.
Miller, M. L., and Bernold, L. E. (1991). “Sensor-integrated nailing for building construction.” J. Constr. Eng. Manage., 117(2), 213–225.
Moon, S., and Bernold, L. E. (1998). “Graphic-based human-machine interface for construction manipulator control.” J. Constr. Eng. Manage., 124(4), 305–311.
National Institute of Standards and Technology (NIST). (2009). “e-Handbook of statistical methods.” ⟨http://www.itl.nist.gov/div898/handbook/index.htm⟩ (Jan 12, 2009).
Peng, J. L. (2002). “Stability analyses and design recommendations for practical shoring systems during construction.” J. Constr. Eng. Manage., 128(6), 536–544.
Rinehart, R. V., and Mooney, M. A. (2008). “Instrumentation of a roller compactor to monitor vibration behavior during earthwork compaction.” Autom. Constr., 17(2), 144–150.
Salim, Md., and Bernold, L. E. (1994). “Effects of design-integrated process planning on productivity in rebar placement.” J. Constr. Eng. Manage., 120(4), 720–737.
Shin, D. H., and Dunston, P. S. (2009). “Evaluation of augmented reality in steel column inspection.” Autom. Constr., 18(1), 118–129.
Simon, H. B. (2002). The Harvard medical school guide to men's health, Free Press, New York, 31.
Tang, J., Wang, Q., and Zhong, T. (2009). “Automatic monitoring and control of cutter suction dredger.” Autom. Constr., 18(1), 194–203.
Information & Authors
Information
Published In
Copyright
© 2010 ASCE.
History
Received: Aug 6, 2008
Accepted: Apr 30, 2009
Published online: May 4, 2009
Published in print: Jan 2010
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.