Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
Publication: Journal of Construction Engineering and Management
Volume 135, Issue 7
Abstract
Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as contracting to expedite construction. Although many of these contracting methods rely on the RUC to determine incentives or disincentives, no standard method for RUC calculation is available to FDOT district engineers. In addition, existing methods are neither practical nor user-friendly for determining incentives or disincentives. This study intends to develop a RUC calculation procedure for the FDOT that focuses on using data that are easily accessible to FDOT district engineers, such as drawings and maintenance of traffic plans. The procedure is developed based on traffic analysis methods published in the Highway Capacity Manual, previous studies on user benefit analysis and work zones, and empirical data specific to Florida. Case studies are used to illustrate the procedure and to compare it with two other existing models, the Arizona model and the queue and user cost evaluation of work zone model, through correlation analysis, comparison of calculation assumptions, and data input analysis. This study shows that the suggested procedure produces consistent RUC estimates.
Get full access to this article
View all available purchase options and get full access to this article.
References
American Association of State Highway and Transportation Officials (AASHTO). (2003). User benefit analysis for highways manual, National Cooperative Highway Research Program (NCHRP), Transportation Research Board, Washington, D.C.
Arditi, D., Khisty, J., and Yasamis, F. (1997). “Incentive/disincentive provisions in highway contracts.” J. Constr. Eng. Manage., 123(3), 302–307.
Arizona Department of Transportation (ADOT). (2002). A+B bidding guide, Phoenix.
Daniels, G., Ellis, D., and Stockton, W. (1999). Technique for manually estimating road user costs associated with construction projects, Texas Transportation Institute, Texas A&M Univ., College Station, Tex.
Ellis, R., Herbsman, Z., and Ellias, A. M. (1997). Development for improved motorist user cost determinations for FDOT construction projects, Florida Dept. of Transportation, Univ. of Florida, Gainesville, Fla.
Gan, A., Jung, R., Liu, K., Li, X., and Sandoval, D. (2005). Vehicle occupancy data collection methods, Lehman Center for Transportation Research, Florida International Univ., Miami.
Gillespie, J. (1998). “Estimating user costs as a basis for incentive/Disincentive amounts in highway construction contracts.” VTRC 98–12, Virginia Transportation Research Council. Charlotte, Va.
Graham, J., Paulsen, R., and Glennon, J. (1977). “Accident and speed studies in construction zones.” Rep. No. FHWA-RD-77–8, U.S. Department of Transportation, Washington, D.C.
Greenwood, I., Bennett, C., and Rahman, A. (1995). Effects of pavement maintenance on road users, International Study of Highway Development and Management, Univ. of Birmingham, Birmingham, Ala.
Huebschman, C., and Garcia, C. (2003). “Construction work zone safety.” FHWA/IN/JTRP-2002/34, Purdue Univ., West Lafayette, Ind.
Jaraiedi, M., Iskander, W., Martineli, D., and Rajamohan, V. (2000). “Highway user benefit analysis system.” West Virginia Univ., Morgantown, W.Va.
Khattak, A. J., and Council, F. M. (1999). “Analysis of injury and non-injury crashes in California work zones.” 78th Annual Meeting, Transportation Research Board, Washington, D.C.
McFarland, W. F., Memmott, J. L., and Chui, M. K. (1993). “Microcomputer evaluation of highway user benefits.” National Cooperative Highway Research Program, Project No. 7–12, TTI, Texas A&M University, College Station, Tex.
Mitretek Systems. (2005). Quick zone delay estimation program version 2.0 user guide, Federal Highway Administration, Washington, D.C.
National Cooperative Highway Research Program (NCHRP). (1997). “Planning techniques to estimate speeds and service volumes for planning applications.” Transportation Research Board, Washington, D.C.
Rister, B., and Graves, C. (2002). “The cost of construction delays and traffic control for life-cycle cost analysis of pavements.” Univ. of Kentucky, Lexington, Ky.
Texas Transportation Institute (TTI). (1998). “User’s manual for QUEWZ-98.” Rep. No. 1745-2, Texas A&M Univ., College Station, Tex.
Transportation Research Board (TRB). (2000). Highway capacity manual 2000, Washington, D.C.
Wang, L. (2007). “Modeling work zone road user cost for alternative contracting methods.” MS thesis, Florida International Univ., Miami.
Wang, Y., and Goodrum, P. (2005). “Use of conceptual road user costs for a rapid roadway construction decision making system.” Proc., ASCE Congress, ASCE, Reston, Va.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Mar 17, 2008
Accepted: Sep 19, 2008
Published online: Jun 15, 2009
Published in print: Jul 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.