Win–Win Concession Period Determination Methodology
This article has a reply.
VIEW THE REPLYThis article has a reply.
VIEW THE REPLYPublication: Journal of Construction Engineering and Management
Volume 135, Issue 6
Abstract
In infrastructure development through public-private partnerships (PPPs), governments worldwide often preset the concession period to a fixed length and then invite the private sector to bid on other aspects of the project. This practice has potential economic, financial, and social problems as shown in a case study of Hong Kong tunnel projects. To overcome these problems, this paper has proposed a win–win concession period determination methodology, in which PPPs are addressed as a principal-agent maximization problem. Both deterministic and simulation-based methods are provided to determine the concession period, with detailed step-by-step procedures. These methods take into consideration the financial characteristics of PPPs and the construction and operation requirements. In particular, the simulation-based approach combines the critical path method and Monte Carlo simulation technique in an effort to quantify construction and market risks for informed decision making. Furthermore, some issues related to the proposed methodology also have been discussed. These issues include (1) factors in determining a reasonable rate of return to the concessionaire’s equity investment; (2) advantages and disadvantages of rate of return regulation; (3) concession period as a tender evaluation criterion; (4) efficiency check of the concessionaire’s cost performance; (5) workable pricing mechanism; and (6) a practical approach to establishing statistical construction cost/duration distributions.
Get full access to this article
View all available purchase options and get full access to this article.
References
Averch, H., and Johnson, L. (1962). “The behavior of the firm under regulatory constraint.” Am. Econ. Rev., 52, 1053–1069.
Burns, P., and Estache, A. (1999). “Infrastructure concessions, information flows, and regulatory risk.” Public policy for the private sector, Note No. 203, World Bank Group, Washington, D.C.
Curran, M. W. (1989). “Range estimating.” Cost Eng., 31(3), 18–26.
Engel, E., Fisher, R., and Galetovic, A. (2001). “Least-present-value-of-revenue actions and highway franchising.” J. Polit. Econ., 109(5), 993–1020.
Gustavo, N., and Rus, G. (2004). “Flexible-term contracts for road franchising.” Transp. Res., Part A: Policy Pract., 38(3), 163–179.
Halpin, D. W. (2006). Construction management, 3rd Ed., Wiley, New York.
Haschenburger, J. K., and Spinelli, J. J. (2005). “Assessing the goodness-of-fit of statistical distributions when data are grouped.” Math. Geol., 37(3), 261–276.
Highways Agency. (1997). DBFO—Value in roads: A case study of the first eight DBFO road contracts and their development, London.
Laffont, J. J., and Martimort, D. (2001). The theory of incentives: The principal-agent model, Princeton University Press, Princeton, N.J.
Legislative Council Panel on Transport. (2007). Measures to rationalize utilization of the three road harbor crossings, Hong Kong.
New Hong Kong Tunnel Company Ltd. (2006). Annual Rep. 2005, Hong Kong.
New Hong Kong Tunnel Company Ltd. (2007). Annual Rep. 2006, Hong Kong.
Ng, D. (2005). “Toll hike ignites call for government to take control.” The Standard, ⟨http://www.thestandard.com.hk/news_detail.asp?pp_cat=&art_id=7381&sid=&con_type=1&d_str=20050504&sear_year=2005⟩.
Project Management Institute. (2000). A guide to the project management body of knowledge, Project Management Institute, Newtown Square, Pa.
Smith, N. I. (1995). Engineering project management, Blackwell Science, Boston.
Treasury Taskforce (Private Finance). (2000). “How to construct a public sector comparator,” Technical Note No. 5, London.
United States General Accounting Office (USGAO). (1999). Public-private partnerships: Terms related to building and facility partnerships, Washington, D.C.
Western Harbor Tunnel Company Ltd. (2007). “Company’s background brief.” LC Paper No. CB(1)533/07-08(02), Hong Kong.
Ye, S. D., and Tiong, R. L. K. (2003). “The effect of concession period design on completion risk management of BOT projects.” Constr. Manage. Econom., 21(5), 471–482.
Zhang, X. Q. (2005). “Financial viability analysis and capital structure optimization in privatized infrastructure projects.” J. Constr. Eng. Manage., 131(6), 656–668.
Zhang, X. Q., and Kumaraswamy, M. M. (2001). “Hong Kong experience in managing BOT projects.” J. Constr. Eng. Manage., 127(2), 154–162.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: May 28, 2008
Accepted: Sep 16, 2008
Published online: May 15, 2009
Published in print: Jun 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.