TECHNICAL PAPERS
Mar 27, 2009

Examining the Relationship between Organizational Learning Styles and Project Performance

Publication: Journal of Construction Engineering and Management
Volume 135, Issue 6

Abstract

A review of literature on organizational learning suggested that organizations mainly exhibit three types of learning styles: single-loop learning (SLL), double-loop learning (DLL), and deutero learning (DeuL). SLL refers to the detection and correction of errors without adjusting one’s underpinning assumptions about performance requirements. DLL refers to improvement actions which are undertaken in response to the change of one’s underpinning assumptions. DeuL refers to the establishment of a system which propels continuous learning. It has been advocated that effectuating these learning styles are critical for attaining continuous project performance improvement. This paper reports a study that aimed to examine the relationship between organizational learning styles and performance improvement in construction projects. A conceptual model for the same was first developed. Data about the contracting organizations’ practice of learning styles and project performance were collected through a questionnaire survey. Structural equation modeling was used to examine the significance of the relationship between organizational learning styles and project performance improvement. It was found that the attainment of project performance improvement was positively related to the practice of DLL. Further, DeuL was found essential for facilitating the practice of SLL and DLL.

Get full access to this article

View all available purchase options and get full access to this article.

References

Al-JiBouri, S. H. (2003). “Monitoring systems and their effectiveness for project cost control in construction.” Int. J. Proj. Manage., 21(3), 145–154.
Arbukle, J. L., and Wothke, W. (1999). Amos 4.0 user’s guide, Small Waters Corporation, SPSS Inc., Chicago.
Argyris, C., and Schön, D. (1978). Organisational learning: A theory of action perspective, Addison-Wesley, Reading, Mass.
Bennis, W., and Nanus, B. (1985). Strategy IV: Deployment of self, leaders: Strategies for taking charge, Harper & Row, New York, 187–214.
Chaaya, M., and Jaafari, A. (2001). “Cognizance of visual design management in life-cycle project management.” J. Manage. Eng., 17(1), 49–57.
Cheung, S. O., Suen, C. H. H., and Cheung, K. W. K. (2004). “PPMS: A web-based construction project performance monitoring system.” Autom. Constr., 13(3), 361–376.
Construction Industry Review Committee of Hong Kong (CIRC). (2001). Construct for excellence, Hong Kong.
Crawford, P., and Bryne, P. (2003). “Project monitoring and evaluation: A method for enhancing the efficiency and effectiveness of aid project implementation.” Int. J. Proj. Manage., 21(5), 363–373.
Drucker, P. F. (1974). Management—Tasks, responsibilities, practices, Heinemann, London.
Duncan, R., and Weiss, A. (1979). “Organizational learning: Implication for organization design.” Res. Organ. Behav., 1, 75–123.
Easterby-Smith, M., Thorpe, R., and Lowe, A. (1991). Management research: An introduction, Sage, London.
Egan, J. (1998). “Rethinking construction: The report of the construction task force.” Dept. of the Environment, Transport and the Regions, London.
Far East Trade. (2003). Hong Kong builder directory, Far East Trade Press (No. 35), Hong Kong.
Fiol, C. M., and Lyles, M. A. (1985). “Organisational learning.” Acad. Manage. Rev., 10(4), 803–813.
Francis, S. (1997). “A time for reflection: Learning about organizational learning.” Learn. Organ. Int. J., 4(4), 168–179.
Franco, L. A., Cushman, M., and Rosenhead, J. (2004). “Project review and leaning in construction industry: Embedding a problem structuring method within a partnership context.” Eur. J. Oper. Res., 152(6), 586–601.
Hair, J. F., Anderson, R. E., Tatham, R. L. and Black, W. C. (1998). Multivariate data analysis, 5th Ed., Prentice-Hall, N.J., 88–92.
Hayes, J., and Allinson, C. W. (1998). “Cognitive style and the theory and practice of individual and collective learning in organisations.” Human Relations, 51(7), 847–871.
Holt, G. D., Proverbs, D., and Love, P. E. D. (2000). “Survey findings on UK construction procurement: Is it achieving lowest cost, or value?” Asia-Pacific Build. Constr. Manage. J., 5(2), 13–20.
Huemer, L., and Östergren, K. (2000). “Strategic change and organizational learning in two Swedish construction firms.” Constr. Manage. Econom., 18(6), 635–642.
Jashapara, A. (2003). “Cognition, culture and competition: An empirical test of the learning organization.” Learn. Organ. Int. J., 10(1), 31–50.
Jöreskog, K., and Sörbom, D. (1996). LISREL 8: Users reference guide, Lawrence Erlbaum Associates, Hillsdale, N.J.
Kippenberger, T. (1997). “The value chain: The original breakthrough.” The Antidote, 2(5), 7–10.
Kline, R. B. (1998). Principles and practice of structural equation modeling, Guilford Press, New York, 190–244.
Kululanga, G. K., McCaffer, R., Price, A. D. F., and Edum-Fotwe, F. (1999). “Learning mechanisms employed by construction contractors.” J. Constr. Eng. Manage., 125(4), 215–233.
Kululanga, G. K., Price, A. D. F., and McCaffer, R. (2002). “Empirical investigation of construction contractors’ organizational learning.” J. Constr. Eng. Manage., 128(5), 385–391.
Kurtyka, J. (2003). “Implementing business intelligence systems: An organizational learning approach.” DM Review Magazine, November, 2003, ⟨http://www.dmereview.com/editorial/dmreview/print_action.cfm?articleId=7610⟩.
Law, K. M. Y., and Chuah, K. B. (2004). “Project-based action learning as learning approach in learning organization: The theory and framework.” Team Performance Management, 10(7/8), 178–186.
Love, P. E. D., Huang, J. C., Edwards, D. J., and Irani, Z. (2004). “Nurturing a learning organization in construction: A focus on strategic shift, organizational transformation, customer orientation and quality centred learning.” Constr. Innovation, 4(2), 113–126.
Love, P. E. D., and Josephson, P.-E. (2004). “Role of error-recovery process in projects.” J. Manage. Eng., 20(2), 70–79.
Love, P. E. D., Li, H., Irani, Z., and Faniran, O. (2000). “Total quality management and the learning organization: A dialogue for change in construction.” Constr. Manage. Econom., 18(3), 321–331.
Mintzberg, H. (1989). Mintzberg on management: Inside our strange world of organizations, The Free Press, New York, 330–334.
Molenaar, K., Washington, S., and Diekmann, J. (2000). “Structural equation model of construction contract dispute potential.” J. Constr. Eng. Manage., 126(4), 268–277.
Murray, P., and Chapman, R. (2003). “From continuous improvement to organizational learning: Developmental theory.” Learn. Organ. Int. J., 10(5), 272–282.
Norušis, M. J. (1999). SPSS 9.0 guide to data analysis, Prentice-Hall, Englewood Cliffs, N.J., 373–430.
Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M. T. (2008). “Implications of culture in the performance of international construction joint venture.” J. Constr. Eng. Manage., 134(5), 361–370.
Ozorhon, B., Dikmen, I., and Birgonul, M. T. (2005). “Organizational memory formation and its use in construction.” Build. Res. Inf., 33(1), 67–79.
Paiva, E. L., Roth, A. V., and Fensterseifer, J. E. (2008). “Organizational knowledge and manufacturing strategy process: A resource-based review analysis.” J. Operations Manage., 26(1) 115–132.
Pedler, M., Burgoyne, J., and Boydell, T. (1997). The learning company: Strategies for sustainable development, McGraw-Hill, London.
Petersen, K. J., Frayer, D. J., and Scannell, T. V. (2000). “An empirical investigation of global sourcing strategy effectiveness.” J. Supply Chain Manag., 36(2), 29–38.
Redding, J. C., and Catalanello, R. F. (1994). Strategic readiness: The making of learning organizations, Jossey-Bass, San Francisco.
Sarker, M. B., Aulakh, P. S., and Cavusgil, S. T. (1998). “The strategic role of relational bonding in inter-organizational collaborations: An empirical study of the global construction industry.” J. Int. Manag., 4(2), 415–421.
Sharma, S. (1996). Applied multivariate techniques, Wiley, New York, 116–123.
Tam, C. M., Tam, V. W. Y., and Tsui, W. S. (2004). “Green construction assessment for environmental management in the construction industry of Hong Kong.” Int. J. Proj. Manage., 22, 563–571.
Tosey, P. (2005). “The hunting of the learning organization: A paradoxical journey.” Manage. Learn., 36(3), 335–352.
Wong, P. S. P., and Cheung, S. O. (2005a). “From monitoring to learning: A conceptual framework.” Proc., 21st Annual Conf. of the Association of Researchers in Construction Management, SOAS, London, 1037–1051.
Wong, P. S. P., and Cheung, S. O. (2005b). “A structural equation model on trust and partnering success.” J. Manage. Eng., 21(2), 70–80.
Wong, P. S. P., and Cheung, S. O. (2008). “An analysis of the relationship between learning behaviour and performance improvement of the contracting organizations.” Int. J. Proj. Manage., 26(2), 112–123.
Zipf, P. J. (1998). “An integrated project management system.” J. Manage. Eng., 14(1), 38–41.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 6June 2009
Pages: 497 - 507

History

Received: Feb 13, 2008
Accepted: Sep 16, 2008
Published online: Mar 27, 2009
Published in print: Jun 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Peter Shek Wong [email protected]
Construction Dispute Resolution Research Unit, Dept. of Building and Construction, City Univ. of Hong Kong, 83 Tat Chee Ave., Hong Kong (corresponding author). E-mail: [email protected]
Sai On Cheung
Construction Dispute Resolution Research Unit, Dept. of Building and Construction, City Univ. of Hong Kong, 83 Tat Chee Ave., Hong Kong.
Ka Lam Fan
Construction Dispute Resolution Research Unit, Dept. of Building and Construction, City Univ. of Hong Kong, 83 Tat Chee Ave., Hong Kong.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share