Mitigation of Karst Tunnel Water Inrush during Operation in Seasonal Variation Zone: Case Study in Nanshibi Tunnel
Publication: Journal of Performance of Constructed Facilities
Volume 35, Issue 3
Abstract
A discrimination method with drainage or plugging that mitigates the karst tunnel water inrush during operation in a seasonal variation zone is proposed to cope with repeated water inrush disasters. This method identifies the critical-water-pressure working state of the tunnel lining by analyzing the water inrush mechanism during the karst operation period. Based on the working state of the tunnel’s critical water pressure, a more accurate method for calculating the equivalent permeability coefficient of the surrounding rock in the karst tunnel is proposed, and then the treatment principles of plugging and drainage can be distinguished theoretically. By taking the Nanshibi operating tunnel as an example, a field test of water inrush disaster treatment was carried out to testify the effectiveness of the proposed approach. Results indicate that: (1) the discrimination method of drainage or plugging can effectively guide the management of water inrush disasters in operating tunnels, and (2) the grouting plugging plan and grouting treatment effect inspection method proposed for operating tunnels have high applicability.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
Acknowledgments
The research reported in this manuscript is funded by the Natural Science Foundation of China (Grant No. U1706223).
References
Alija, S., F. J. Torrijo, and M. Quinta-Ferreira. 2013. “Geological engineering problems associated with tunnel construction in Karst rock masses: The case of Gavarres tunnel (Spain).” Eng. Geol. 157 (4): 103–111. https://doi.org/10.1016/j.enggeo.2013.02.010.
Bear, J. 1979. Hydraulics of groundwater. New York: Mcgraw-Hill.
Chen, J. Q., M. B. Song, S. F. Wu, and X. J. Zhang. 2009. “Characteristics of spatial-temporal variability of mean ground temperature in Yangtze River Basin in 40 years.” J. Changjiang Eng. Vocational Coll. 30 (01): 56–64. https://doi.org/10.14042/j.cnki.32.1309.2019.01.006.
Cheng, P., L. Zhao, Q. Li, L. Li, and S. Zhang. 2019. “Water inflow prediction and grouting design for tunnel considering nonlinear hydraulic conductivity.” KSCE J. Civ. Eng. 23 (9): 4132–4140. https://doi.org/10.1007/s12205-019-0306-9.
China Communications Press. 2004. Code for design of road tunnel. JTG D70-2004. Beijing: China Communications Press.
China Communications Press. 2010. Guidelines for design of highway tunnel. JTG/T D70-2010. Beijing: China Communications Press.
Dammyr, Ø., B. Nilsen, and J. Gollegger. 2017. “Feasibility of tunnel boring through weakness zones in deep Norwegian subsea tunnels.” Tunnelling Underground Space Technol. 69 (10): 133–146. https://doi.org/10.1016/j.tust.2017.06.012.
Domingue, C., J. M. Lemieux, M. Grenon, J. Molson, R. Therrien, P. L. Lajoie, and D. Blessent. 2019. “Numerical evaluation of grouting scenarios for reducing water inflows from major faults in underground excavations.” Mine Water Environ. 38 (3): 497–506. https://doi.org/10.1007/s10230-019-00589-2.
Guo, X., J. R. Chai, Y. Qin, Z. G. Xu, Y. N. Fan, and X. W. Zhang. 2019. “Mechanism and treatment technology of three water inrush events in the Jiaoxi River Tunnel in Shaanxi, China.” J. Perform. Constr. Facil. 33 (1). https://doi.org/10.1061/(ASCE)CF.1943-5509.0001251.
He, J., S. X. Fang, F. H. Hou, R. H. Yan, J. Yao, X. J. Tang, and G. Wu. 2013. “Vertical zonation of weathered crust ancient Karst and reservoir evaluation and prediction—A case study of M55–M51 sub-members of Majiagou Formation in gas fields, central Ordos Basin, NW China.” Pet. Explor. Dev. 40 (5): 572–581. https://doi.org/10.1016/S1876-3804(13)60075-0.
Kan, P. 2018. “Cause analysis and countermeasure research on the influence of stratified injection well test.” AIP Conf. Proc. 2036 (1): 030045. https://doi.org/10.1063/1.5075698.
Li, W. U., W. Jun-Wei, C. Gang, and Z. Lu. 2009. “Cause of the ‘8.5’ water burst incident at Yesanguan tunnel along the Yi-Wan railway.” Carsologica Sin. 28 (2): 212–218. https://doi.org/10.3969/j.issn.1001-4810.2009.02.018.
Li, X., P. Zhang, Z. He, Z. Huang, M. Cheng, and L. Guo. 2017. “Identification of geological structure which induced heavy water and mud inrush in tunnel excavation: A case study on Lingjiao tunnel.” Tunnelling Underground Space Technol. 69 (10): 203–208. https://doi.org/10.1016/j.tust.2017.06.014.
Li, X. H., Q. S. Zhang, X. Zhang, X. D. Lan, C. H. Duan, and J. G. Liu. 2018. “Detection and treatment of water inflow in Karst tunnel: A case study in Daba tunnel.” J. Mountain Sci. 15 (7): 1585–1596. https://doi.org/10.1007/s11629-018-4919-0.
Sedat, T. 2010. “Water leakage from the power tunnel of Gezende Dam, southern Turkey: A case study.” Environ. Earth Sci. 61 (2): 419–427. https://doi.org/10.1007/s12665-009-0354-4.
Shen, C. Y. 2015. Investigation and treatment of karst in water conservancy and hydropower projects. Beijing: China Water Conservancy and Hydropower Press.
Song, K.-I., G. C. Cho, S. B. Chang, and I. M. Lee. 2013. “Beam- spring structural analysis for the design of a tunnel pre-reinforcement support system.” Int. J. Rock Mech. Mining Sci. 59 (5): 139–150. https://doi.org/10.1016/j.ijrmms.2012.12.017.
Wang, X., M. Wang, and M. Zhang. 2005. “Research on regulating water pressure acting on mountain tunnels by blocking ground water and limiting discharge.” Chin. J. Geotech. Eng. 27 (1): 125–127. https://doi.org/10.3321/j.issn:1000-4548.2005.01.022.
Wang, Y., X. Yin, H. Jing, R. Liu, and H. Su. 2016. “A novel cloud model for risk analysis of water inrush in Karst tunnels.” Environ. Earth Sci. 75 (22): 1450. https://doi.org/10.1007/s12665-016-6260-7.
Xiong, D., and R. Fu. 2005. “Vertical Zonation method for intensity of Karst development.” Geotech. Eng. Tech. 19 (003): 113–117. https://doi.org/10.3969/j.issn.1007-2993.2005.03.002.
Zhang, C., D. Zhang, M. Wang, and Y. Xiang. 2007. “Study on appropriate parameters of grouting circle for tunnels with limiting discharge lining in high water pressure and water-enriched region.” Yanshilixue Yu Gongcheng Xuebao/Chin. J. Rock Mech. Eng. 26 (11): 2270–2276. https://doi.org/10.3321/j.issn:1000-6915.2007.11.013.
Zhang, Q., P. Li, G. Wang, S. Li, X. Zhang, Q. Zhang, Q. Wang, and J. Liu. 2015. “Parameters optimization of curtain grouting reinforcement cycle in Yonglian tunnel and its application.” Math. Prob. Eng. PT (7): 1–15. https://doi.org/10.1155/2015/615736.
Zheng, K., X. Pei, D. Zhu, S. Wu, and W. Guo. 2019. “Thoughts on tunnel water inrush in changing zones of groundwater level in Karst areas.” Carsologica Sinica 38 (4): 473–479. https://doi.org/10.11932/karst20190401.
Zhu, Y. W. S., and T. Zhang. 2018. “Permeability of the coal seam floor rock mass in a deep mine based on in-situ water injection tests.” Mine Water Environ. 37 (4): 724–733. https://doi.org/10.1007/s10230-018-0524-2.
Zuo, C., S. Ding, D. Liu, J. Sun, and Y. Xu. 2014. “Failure characteristics and the mechanical effect of mica schist in an anchored tunnel.” Modern Tunnelling Technol. 51 (4): 39–45. https://doi.org/10.13807/j.cnki.mtt.2014.04.006.
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Received: Aug 7, 2020
Accepted: Nov 25, 2020
Published online: Mar 19, 2021
Published in print: Jun 1, 2021
Discussion open until: Aug 19, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.