Discharging Compacted Sediment by Underwater Blasting in Conjunction with a Desilting Tunnel in the Tseng-Wen Reservoir of Taiwan
Publication: Journal of Performance of Constructed Facilities
Volume 34, Issue 3
Abstract
Sediments transported by heavy rainfall result from frequent typhoons in the Tseng-Wen reservoir, which now comprise one-third of the capacity of the reservoir. Yearly increases of deposits are planned for ejection via a newly operational desilting tunnel to extend the serving capacity of this reservoir, which is the most important reservoir in Taiwan. The first worldwide experimentation of cooperative underwater blasting to loosen compacted sediment within a reservoir, then dispelled by a desilting tunnel, is carried out for demonstrating the feasibility and efficiency. Precautionary measurements are very strict for managing underwater explosions in an operating reservoir without jeopardizing its mission and structure safety. When choosing the detonating locations, the sediment thickness is determined by a shot wave spectrum ratio method with a small amount dynamite test shot for avoiding the bed rock fracture affected by the blasting. Vibrations, turbidity, underwater life, and water content affected by the explosion have all been assessed. When applying counter measurements before the detonation, affecting the underwater life could be reduced; the influence of water quality by a water gel dynamite explosion was very minimum and vanished a few hours after the blasting. A distance of 50 m away from the dam is set as a safety perimeter for an underwater explosion, for which the specified amount of dynamite is determined with a consideration of distance and the applied method of blasting. The free drop method can use 10 times the amount of dynamite than in-hole blasting at the same location and where the affected deposit volume is around per kg via free drop blasting. In-hole blasting disturbs more compacted sediment than free drop methods, and the effect of an applied in-hole blasting in combination with a traditional mechanical dredge is shown to lead to a 250% improvement. To achieve the best desilting tunnel efficiency, a deep underwater groove via blasting is recommended. With proper design, half of the existing compact deposits in the Tseng-Wen reservoir could be removed, thus increasing the capacity of the largest reservoir in Taiwan as much as 15%, which is equivalent to . Recompacting the underwater blasting disturbed sediment still could be expelled via desilting tunnel water discharging six months after the blasting operation shown by this experiment. This finding supports the feasibility of operating the blasting work at the dry season and waiting for the rainfall the loosen sediment away via desilting tunnel discharging.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
All data, models, or code generated or used during the study are available from the corresponding author by request.
Acknowledgments
This work is supported by the WRASB, the Water Resources Agency, MOEA, Taiwan. We are also grateful to them for supporting the transportation vessel and helping to confine the safety limit for the blasting operation. All of the explosive designs and operations were conducted by the Taiwan Chung-Ao consulting company under the direction of Dr. S. W. Wang.
References
Annandale, G. W. 2011. “Going full circle.” Int. Water Power Dam. Constr. 2011 (1): 30–34.
Atkinson, E. 1996. The feasibility of flushing sediment from reservoirs. Rep. No. OD137. Wallingford, UK: HR Wallingford.
Brandt, S. A. 2000. “A review of reservoir desiltation.” Int. J. Sediment Res. 15 (3): 321–342.
Carlson, T. J., G. E. Johnson, C. M. Woodley, J. R. Skalski, and A. G. Seaburg. 2011. Compliance monitoring of underwater blasting for rock removal at warrior point, Columbia River channel improvement project, 2009/2010, PNNL-20388. Washington, DC: USACE.
Environmental Protection Agency of ROC. 2019. Surface water standard of environmental quality control. Taipei, Taiwan: Environmental Protection Agency of ROC.
Fan, J., and G. L. Morris. 1992. “Reservoir sedimentation. II: Reservoir desiltation and long-term storage capacity.” J. Hydraul. Eng. 118 (3): 370–384. https://doi.org/10.1061/(ASCE)0733-9429(1992)118:3(370).
Huang, L. X., and Y. B. Chen. 2003 “Rock dynamics in China: Past, present, and future.” [In Chinese.] Chin. J. Rock Mech. Eng. 22 (11): 1887–1891.
Jimeno, C. L., E. L. Jimeno, and F. J. A. Carcedo. 1995. “Underwater blasting.” In Drilling and blasting of rocks, 272–280. Boca Raton, FL: CRC Press.
Kahriman, A., U. Ozer, M. Aksoy, A. Karadogan, and G. Tuncer. 2006. “Environmental impacts of bench blasting at Hisarcik Boron open pit mine in Turkey.” Environ. Geol. 50 (7): 1015–1023. https://doi.org/10.1007/s00254-006-0274-5.
Lee, F. Z., J. S. Lai, Y. C. Tan, and C. C. Sung. 2014. “Turbid density current venting through reservoir outlets.” KSCE J. Civ. Eng. 18 (2): 694. https://doi.org/10.1007/s12205-014-0275-y.
Li, H. B., H. J. Jiang, J. Zhao, L. X. Huang, and J. R. Li. 2003. “Some problems about safety analysis of rock engineering under dynamic load.” [In Chinese.] Chin. J. Rock Mech. Eng. 22 (11): 1887–1891.
Lu, W. B., S. X. Lai, C. Y. Zhu, and D. Q. Shu. 2001 “Safety standards of blast vibrations adopted in rock base excavation of three gorge project.” [In Chinese.] Explos. Shock Waves. 21 (1): 67–71.
Morris, G. L., and J. Fan. 1998. Reservoir sedimentation handbook: Design and management of dams, reservoirs, and watersheds for sustainable use. New York: McGraw-Hill Book.
Ozer, U., A. Kahriman, M. Aksoy, D. Adiguzel, and A. Karadogan. 2008. “The analysis of ground vibrations induced by bench blasting at Akyol quarry and practical blasting charts.” Environ. Geol. 54 (4): 737–743. https://doi.org/10.1007/s00254-007-0859-7.
Van der Baan, M. 2009. “The origin of SH-wave resonance frequencies in sedimentary layers.” Geophys. J. Int. 178 (3): 1587–1596. https://doi.org/10.1111/j.1365-246X.2009.04245.x.
van Rijn, L. C. 2013. “Sedimentation of sand and mud in reservoirs in rivers.” Accessed May 1, 2019. https://www.leovanrijn-sediment.com/papers/Reservoirsiltation2013.pdf.
White, W. R. 2001. Evacuation of sediment from reservoirs. London: Thomas Telford.
WRASB (Southern Region Water Resources Office of Water Resources Agency). 2016. Function of desilting tunnel in Tseng-Wen Reservoir. [In Chinese.] Tainan, Taiwan: Water Resources Agency, Ministry of Economic Affairs, R.O.C.
WRASB (Southern Region Water Resources Office of Water Resources Agency). 2018. Tseng-Wen reservoir yearly report. [In Chinese.] Tainan, Taiwan: Water Resources Agency, Ministry of Economic Affairs, R.O.C.
Information & Authors
Information
Published In
Copyright
©2020 American Society of Civil Engineers.
History
Received: May 6, 2019
Accepted: Nov 6, 2019
Published online: Apr 3, 2020
Published in print: Jun 1, 2020
Discussion open until: Sep 3, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.