Failure Analysis of Arch Centering
Publication: Journal of Performance of Constructed Facilities
Volume 34, Issue 1
Abstract
In recent decades, a large number of arch bridges have been built in China using a variety of construction methods. The arch-centering construction method without terrain restriction is widely used. The current research is mainly focused on the number of arch ring segments, the concrete pouring sequence, and the pouring method in arch-centering construction. However, little attention has been given to the gap of the arch centering. This paper introduces an arch centering with a span of 115 m that failed during a preloading experiment. The failure process of the arch centering is addressed and the cause is analyzed. Based on the principle of virtual work, the truss element with a gap is proposed to simulate the arch centering. The calculated result correlates well with monitoring data. The results indicate that the main cause of the failure is the inelastic deformation induced by gaps between the pin and hole of the splicing members. To eliminate the impact of gaps and maintain safety, the chords in arch centering must be kept under pressure.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This work is supported by the Liaoning Provincial Doctoral Scientific Foundation Projects (20170520138) and the Liaoning Provincial Natural Science Foundation Guidance Projects (2019-ZD-0006).
References
Au, F. T. K., J. J. Wang, and G. D. Liu. 2003. “Construction control of reinforced concrete arch bridges.” J. Bridge Eng. 8 (1): 39–45. https://doi.org/10.1061/(ASCE)1084-0702(2003)8:1(39).
Chen, B. C., and T. L. Wang. 2009. “Overview of concrete filled steel tube arch bridges in China.” Pract. Period. Struct. Des. Constr. 14 (2): 70–80. https://doi.org/10.1061/(ASCE)1084-0680(2009)14:2(70).
Choi, C. K., and G. T. Chung. 1996. “Refined three-dimensional finite element model for end-plate connections.” J. Struct. Eng. 122 (11): 1307–1316. https://doi.org/10.1061/(ASCE)0733-9445(1996)122:11(1307).
Cook, R. D. 2007. Concepts and applications of finite element analysis. New York: Wiley.
Hu, C.-W., and L.-C. Fan. 2005. “Research on coaction of arch ring and arch centering of Danhe River Bridge.” [In Chinese.] Highway 2005 (4): 50–53.
Huang, Z. Q., G. W. Mei, and X. Yang. 2009. “Optimization design of loading procedure of trestle construction of Arch Bridge.” [In Chinese.] J. Chongqing Jiaotong Univ. 28 (1): 23–25.
Kim, S.-H., and M. Shinozuka. 2003. “Effects of seismically induced pounding at expansion joints of concrete bridges.” J. Eng. Mech. 129 (11): 1225–1234. https://doi.org/10.1061/(ASCE)0733-9399(2003)129:11(1225).
Lavan, O. 2010. “Dynamic analysis of gap closing and contact in the mixed Lagrangian framework: Toward progressive collapse prediction.” J. Eng. Mech. 136 (8): 979–986. https://doi.org/10.1061/(ASCE)EM.1943-7889.0000146.
Li, W. 2011. “Mechanical behavior of nonlinear gap truss element and its iterative calculation method.” J. Eng. Mech. 28 (1): 65–69.
Li, W., C. Huang, and C. Tang. 2018. “Negative angle vertical rotating construction method of reinforced concrete arch bridge.” Struct. Eng. Int. 27 (4): 558–562. https://doi.org/10.2749/222137917X14881937844847.
Liu, S. H., Y. H. Cui, and Y. Liu. 2008. “Design and analysis of arch centering of Zengjiagou Bridge.” [In Chinese.] Supplement, J. Chongqing Jiaotong Univ. 27 (S1): 867–870.
MOT (Ministry of Transport of the People’s Republic of China). 2011. Technical specification for construction of highway bridge and culverts. [In Chinese.] JTG/TF50. Beijing: MOT.
Troyano, L. F. 2004. “Procedures for the construction of large concrete arches.” In Proc., Advances in Assessment, Structural Design and Construction, 55–66. Barcelona, Spain: International Center for Numerical Methods in Engineering.
Tzou, H. S., and A. J. Schiff. 1989. “Dynamics and control of elevators with large gaps and rubber dampers.” J. Struct. Eng. 115 (11): 2753–2771. https://doi.org/10.1061/(ASCE)0733-9445(1989)115:11(2753).
Wait, R., and A. R. Mitchell. 1985. Finite element analysis and applications. New York: Wiley.
Wu, D. 1997. “Investigation on collapse accident of Baiqiaokeng Bridge in Shaoguan City.” [In Chinese.] J. Labor Prot. 15 (10): 34–36.
Xie, W., T. Zhao, J. Tang, and Y. Zhang. 2017. “Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge.” J. Constr. Eng. Manage. 143 (8): 04017059. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001356.
Xu, Y., Z. Zhou, and H. Wu. 2010. “Design of arch bridge with variable steel-concrete composite section based on vertical erection-rotation method.” In Proc., 2010 Int. Conf. on E-Product E-Service and E-Entertainment, 1–4. Red Hook, NY: IEEE.
Zhang, Y., B. Peng, C. Li, and C. Dong. 2016. “Reasonable construction procedure and method of the cast irrplace RC arch rib with arch centering.” [In Chinese.] J. Civ. Archit. Environ. Eng. 38 (06): 83–90. https://doi.org/10.11835/j.issn.1674-4764.2016.06.011.
Zhao, J. F. 2015. “Comparison of erection schemes for steel tube arch of main bridge of Huanghe River Bridge on Zhungeer-Shuozhou Railway.” [In Chinese.] Bridge Constr. 22 (1): 285–286.
Zhou, S. X., M. Zhang, B. Liu, and X. Jun. 2011. “Determination of cast-in situ section lengths of reinforced concrete arch bridge in arch centering method.” Adv. Mater. Res. 243–249 (May): 1935–1940. https://doi.org/10.4028/www.scientific.net/AMR.243-249.1935.
Zhu, W., Z. Zhang, and C. Huang. 2008. “Study on project design of arch centering for construction of long span arch bridge.” [In Chinese.] Ind. Constr. 38 (01): 903–906.
Information & Authors
Information
Published In
Copyright
©2019 American Society of Civil Engineers.
History
Received: Dec 12, 2018
Accepted: May 10, 2019
Published online: Oct 28, 2019
Published in print: Feb 1, 2020
Discussion open until: Mar 28, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.