Novel Technique for Configuration Transformation of 3D Curved Cables of Suspension Bridges: Application to the Dongtiao River Bridge
Publication: Journal of Performance of Constructed Facilities
Volume 32, Issue 4
Abstract
Configuration transformation is an important issue during the construction stage of spatial suspension bridges with three-dimensional (3D) curved cables. Without fully considering this issue, the hangers could rub or interfere due to contact with the cable duct at the connection of the cable and girder, which can cause damage to the hangers and hamper the construction procedure. A novel technique using lateral bracing members (LBMs) was proposed to aid the configuration transformation during the construction stage of suspension bridges. The lateral displacement and rotation angle were investigated to ensure safety during the construction process. Limitations of the conventional configuration transformation techniques were acknowledged. To demonstrate its capability, the proposed technique was applied to a suspension bridge, the Dongtiao River Bridge, located in Huzhou, China. Based on the results, it was concluded that the LBMs can provide an efficient, reliable, and economical solution to aid configuration transformation of 3D curved cables of suspension bridges during the construction stage.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This work was supported by the Natural Science Basic Research Program of Shaanxi Province for Young Scholars (Grant No. 2017JQ5013) and the Fundamental Research Funds for the Central Universities of Ministry of Education of China (Grant No. 310821172006). The first author is also grateful for the information provided by Mr. Chengshu Wang of Traffic Planning and Design Institute of Zhejiang Province and to Mr. Yuanxiao Xu of CCCC Second Harbour Engineering Co. in China.
References
Cho, C.-Y., S.-W. Lee, S.-Y. Park, and M. Lee. 2001. “Yongjong self-anchored suspension bridge.” Struct. Eng. Int. 11 (1): 21–23.
CSCEC-6th-Bureau. 2016. “Songyuan Tianhe bridge completed and opened to traffic.” Accessed November 10, 2016. https://v.qq.com/x/page/w0358s1ud9y.html.
Gil, H. 2001. “Cable erection of spatial self-anchored suspension bridge.” In Proc., IABSE Symp. Rep., Int. Association for Bridge and Structural Engineering, 17–24. Seoul, South Korea: Korean group of IABSE and Korea highway corporation.
Gil, H., and Y. Choi. 2001. “Cable erection test at pylon saddle for spatial suspension bridge.” J. Bridge Eng. 6 (3): 183–188. https://doi.org/10.1061/(ASCE)1084-0702(2001)6:3(183).
Gil, H., and Y. Choi. 2002. “Cable erection test at splay band for spatial suspension bridge.” J. Bridge Eng. 7 (5): 300–307. https://doi.org/10.1061/(ASCE)1084-0702(2002)7:5(300).
Han, Z., P. Yang, R. Zhang, J. Huang, and W. Li. 2008. “Research and development of rotatable cable clamps for Fumin Bridge in Tianjin.” [In Chinese.] Bridge Constr. 2008 (5): 12–14.
Huang, X., W. Wang, and L. Gong. 2017. “Key technology for construction of main structure of North Branch of Tianhe bridge in Songyuan.” [In Chinese.] World Bridge 45 (3): 20–24.
Ke, H., C. Li, Y. Zhang, and C. Dong. 2010. “System transformation program and control principles of suspender tension for a self-anchored suspension bridge with two towers and large transverse inclination spatial cables.” [In Chinese.] China Civ. Eng. J. 11 (3): 94–101.
Kim, H.-K., M.-J. Lee, and S.-P. Chang. 2002. “Non-linear shape-finding analysis of a self-anchored suspension bridge.” Eng. Struct. 24 (12): 1547–1559.
Kim, H.-K., M.-J. Lee, and S.-P. Chang. 2006. “Determination of hanger installation procedure for a self-anchored suspension bridge.” Eng. Struct. 28 (7): 959–976.
Li, C., X. Tang, and G. Xiang. 2010. “Fatigue crack growth of cable steel wires in a suspension bridge: Multiscaling and mesoscopic fracture mechanics.” Theor. Appl. Fract. Mech. 53 (2): 113–126.
Li, J., A. Li, and M. Q. Feng. 2013. “Sensitivity and reliability analysis of a self-anchored suspension bridge.” J. Bridge Eng. 18 (8): 703–711. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000424.
Mei, K., Y. Li, and Z. Lu. 2015. “Application study on the first cable-stayed bridge with CFRP cables in China.” J. Traffic Transp. Eng. (English Edition) 2 (4): 242–248.
MingHao-Technology. 2016. “SongyuanTianhe bridge in Jilin Province.” Accessed December 24, 2016. https://v.qq.com/x/page/w0358s1ud9y.html.
Nader, M., G. Baker, J. Duxbury, and B. Maroney. 2013. “Fabrication and construction of self anchored san francisco oakland bay suspension bridge.” In Proc., Durability of Bridge Structures: Proc., 7th New York City Bridge Conf., 26–27. Leiden, Netherlands: CRC Press/A.A. Balkema.
Nie, J., M. Tao, and J. Fan. 2011. “Research on cable anchorage systems for self-anchored suspension bridges with steel box girders.” J. Bridge Eng. 16 (5): 633–643. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000190.
Sun, J., R. Manzanarez, and M. Nader. 2002. “Design of looping cable anchorage system for new San Francisco-Oakland Bay Bridge main suspension span.” J. Bridge Eng. 7 (6): 315–324. https://doi.org/10.1061/(ASCE)1084-0702(2002)7:6(315).
Sun, J., R. Manzanarez, and M. Nader. 2004. “Suspension cable design of the New San Francisco-Oakland Bay Bridge.” J. Bridge Eng. 9 (1): 101–106. https://doi.org/10.1061/(ASCE)1084-0702(2004)9:1(101).
Sun, Y., H.-P. Zhu, and D. Xu. 2015. “New method for shape finding of self-anchored suspension bridges with three-dimensionally curved cables.” J. Bridge Eng. 20 (2): 04014063. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000642.
Sun, Y., H.-P. Zhu, and D. Xu. 2016. “A specific rod model based efficient analysis and design of hanger installation for self-anchored suspension bridges with 3D curved cables.” Eng. Struct. 110: 184–208.
Wang, X., C. Wang, M. Zhang, Y. Xu, and X. Lei. 2018. “Innovative design and construction process for a self-anchored suspension and cable-stayed cooperation bridge in China.” Struct. Eng. Int. 28 (2): 178–184.
Wu, B., X. Li, D. Li, G. Zheng, and L. Xu. 2008. “Spatial large angle and long adjustable amount hangers and their application to Fumin Bridge in Tianjin.” [In Chinese.] Bridge Constr. 2008 (5): 78–81.
Xiong, C., H. Lu, and J. Zhu. 2017. “Operational modal analysis of bridge structures with data from GNSS/accelerometer measurements.” Sensors 17 (3): 436. https://doi.org/10.3390/s17030436.
Xu, F., M. Zhang, L. Wang, and Z. Zhang. 2017. “Self-anchored suspension bridges in China.” Pract. Period. Struct. Des. Constr. 22 (1): 04016018. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000304.
Yoon, M., H. Shin, and Y. Son. 2001. “The construction of the Youngjong grand bridge (self anchored suspension bridge).” In Proc., IABSE Symp. Rep., Int. Association for Bridge and Structural Engineering, 50–57. Seoul, South Korea: Korean group of IABSE and Korea highway corporation.
Zhang, J., A. Liu, Z. J. Ma, H. Huang, L. Mei, and Y. Li. 2013. “Behavior of self-anchored suspension bridges in the structural system transformation.” J. Bridge Eng. 18 (8): 712–721. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000422.
Zhang, Z., J. Zhang, W. Hao, J. Dai, and Y. Shen. 2010. “Hangzhou Jiangdong bridge designed as a spatial self-anchored suspension bridge, China.” Struct. Eng. Int. 20 (3): 303–307.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Aug 18, 2017
Accepted: Jan 30, 2018
Published online: May 25, 2018
Published in print: Aug 1, 2018
Discussion open until: Oct 25, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.