Assessment of Deficiencies in Design Documents for Large Construction Projects
Publication: Journal of Performance of Constructed Facilities
Volume 31, Issue 5
Abstract
This paper investigates the significance of the different types of design documents’ deficiencies (DDDs) by both contractors and consultants involved in large construction projects. Sixteen different types of DDDs were identified and classified under six different groups. Based on the significance index of the different types of DDDs, the top five ranked DDDs from the perspectives of contractors and consultants are nonconformance to building codes, design errors, specifications errors, operational issues, and lack of design team coordination. Lack of use of constructability analysis in the production of the design documents was ranked high by consultants. The test of agreement on all types of DDDs between contractors and consultants showed a high level of agreement. The study recommended that building codes should be instituted in Saudi Arabia, and consultants should conduct constructability analysis to reduce the level of deficiencies in the design documents.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors thank King Fahd University of Petroleum and Minerals for the support and facilities that made this research possible.
References
Abolnour, M. M. (1994). “The relationship of fee structure in engineering offices and design deficiency.” Master’s thesis, Construction Engineering and Management Dept., King Fahd Univ. of Petroleum and Minerals, Dhahran, Saudi Arabia.
Acharya, N. K., Kim, J. S., and Lee, Y. D. (2006). “Design errors: Inefficiency or carelessness of designer?” J. Perform. Constr. Facil., 192–195.
Alamoudi, A. (2017). Interview, project engineer at walled Saeed Alamoudi for contracting, Dammam, Saudi Arabia.
Almuntaser, T. (2017). Interview, BIM manager/senior architect at assystem-radicon company, Khobar, Saudi Arabia.
Alsarory, A. (2017). Interview, business development director at Mashorah Albina engineering company, Khobar, Saudi Arabia.
Andi, A., and Minato, T. (2003). “Design documents quality in the Japanese construction industry: Factors influencing and impacts on construction process.” Int. J. Project Manage., 21(7), 537–546.
Arditi, D., Elhassan, A., and Toklu, Y. C. (2002). “Constructability analysis in the design firm.” J. Constr. Eng. Manage., 117–126.
Assaf, S. A., and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Project Manage., 24(4), 349–357.
Assaf, S. A., Hassanain, M. A., and Al-Zahrani, S. (2014). “Causes of contractors’ failure in industrial projects in Saudi Arabia.” Res. J. Appl. Sci. Eng. Technol., 9(3), 158–164.
Atkinson, A. (2002). “The pathology of building defects; A human error approach.” Eng. Constr. Archit. Manage., 9(1), 53–61.
Ayesh, A. (2017). Interview, structural engineer at Alhussan engineering consultants, Dammam, Saudi Arabia.
Chua, D. K., Kog, Y. C., and Loh, P. K. (1999). “Critical success factors for different project objectives.” J. Constr. Eng. Manage., 142–150.
DeFraites, A. A., Jr. (1989). “Fee versus quality.” J. Prof. Issues Eng., 125–128.
Demkin, J. A. (2008). The architect’s handbook of professional practice, 14th Ed., Wiley, Hoboken, NJ.
Dominowski, R. L. (1980). Research methods, Prentice Hall, Englewood Cliffs, NJ.
Dosumu, O. S., and Iyagba, R. A. (2013). “An appraisal of factors responsible for errors in Nigerian construction documents.” Ethiopian J. Environ. Stud. Manage., 6(1), 49–57.
Hancher, D., East, E., and Lutz, J. (1990). “Framework for design-quality-review data-base system.” J. Manage. Eng., 296–312.
Hassanain, M. A., and Juaim, M. N. (2011). “Assessment of factors influencing the development and implementation of the architectural program.” Struct. Surv., 29(4), 320–336.
Kagan, H. A. (1985). “How designers can avoid construction claims.” J. Prof. Issues Eng., 100–107.
Kangari, R. (1995). “Risk management perceptions and trends of U.S. construction.” J. Constr. Eng. Manage., 422–429.
Kish, L. (1965). Survey sampling, Wiley, New York.
Koushki, P. A., Al-Rashid, K., and Kartam, N. (2005). “Delays and cost increases in the construction of private residential projects in Kuwait.” Constr. Manage. Econ., 23(3), 285–294.
Lopez, R., Love, P., Edwards, D., and Davis, P. (2010). “Design error classification, causation, and prevention.” J. Perform. Constr. Facil., 399–408.
Love, P. E., Edwards, D. J., and Irani, Z. (2008). “Forensic project management: An exploratory examination of the causal behavior of design-induced rework.” IEEE Trans. Eng. Manage., 55(2), 234–247.
Love, P. E., and Josephson, P. E. (2004). “Role of error-recovery process in projects.” J. Manage. Eng., 70–79.
Love, P. E., Lopez, R., Edwards, D. J., and Goh, Y. M. (2012). “Error begat error: Design error analysis and prevention in social infrastructure.” Accid. Anal. Prev., 48, 100–110.
Love, P. E. D., Lopez, R., Goh, Y. M., and Davis, P. R. (2011). “Systemic modelling of design error causation in social infrastructure projects.” Proc. Eng., 14, 161–168.
Mahamid, I., Bruland, A., and Dmaidi, N. (2012). “Causes of delay in road construction projects.” J. Manage. Eng., 300–310.
Minato, T., and Andi, A. (2003). “Representing causal mechanism of defective designs: A system approach considering human errors.” Constr. Manage. Econ., 21(3), 297–305.
Mohammed, R. E. (2007). “An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes.” Ph.D. dissertation, School of Built Environment, Heriot-Watt Univ., Edinburgh, U.K.
MOMRA (Ministry of Municipal and Rural Affairs). (2015). “Contractors classification, Riyadh, Saudi Arabia.” ⟨https://www.momra.gov.sa/⟩ (Feb. 20, 2015).
Oxford Business Group. (2013). “The report: Saudi Arabia 2013.” ⟨http://www.oxfordbusinessgroup.com/saudi-arabia-2013⟩ (Nov. 15, 2015).
Sunday, D. O., and Afolarin, A. O. (2013). “Causes, effects and remedies of errors in Nigerian construction documents.” Organ. Technol. Manage. Constr. Int. J., 5(1), 676–686.
Tilley, P. A., and Barton, R. (1997). “Design and documentation deficiency—Causes and effects.” Proc., First Int. Conf. on Construction Process Reengineering, Griffith Univ., Gold Coast, QLD, Australia, 703–712.
Vlatas, D. A. (1986). “Owner and contractor review to reduce claims.” J. Constr. Eng. Manage., 104–111.
Zaki, A. (2017). Interview, deputy executive manager at Al-Yamama Orascom United, Dammam, Saudi Arabia.
Information & Authors
Information
Published In
Copyright
©2017 American Society of Civil Engineers.
History
Received: Dec 4, 2016
Accepted: Apr 12, 2017
Published online: Jun 22, 2017
Published in print: Oct 1, 2017
Discussion open until: Nov 22, 2017
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.