Role of Communication and Coordination in Project Success: Case Study

Publication: Journal of Performance of Constructed Facilities
Volume 29, Issue 4

Abstract

Communication and coordination are key issues for successful project management. Coordination is specifically a challenging task for industrial projects where a number of interdependent role players are needed to achieve the desired project outcomes. In this context, a two-stage case study of construction phase delay control for an oil and gas industrial project is presented. A process improvement methodology was carried out in the first stage and the root causes for the delays were identified. The investigation results revealed that the scope of one item of work, piping, dominated a large portion of delays. It was found that piping packages were not processed smoothly due to four main causes: incomplete testing, frequent piping modifications, incomplete as-built drawings, and incomplete punch listing. Seventy percent of the delays were caused by incomplete testing activities and incomplete as-built drawings. The improvement study suggested establishing a new unit for piping test package control and coordination. The review process was improved and the dedicated control team was implemented for the second unit, resulting in a substantial drop in the number of delayed test packages (down from 48 to 8%) and punch list items (down from 3,075 to 2,371). The findings of the case study demonstrate the importance of communication and coordination in successful project management for complex projects. The case presented is an example of process improvement use for successful delay management.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors thank the King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia, for its research support and encouragement.

References

Abd El-Razek, M. E., Bassioni, H. A., and Mobarak, A. M. (2008). “Causes of delay in building construction projects in Egypt.” J. Constr. Eng. Manage., 831–841.
Abdul-Rahman, H., Berawi, M. A., Berawi, A. R., Mohamed, O., Othman, M., and Yahya, I. A. (2006). “Delay mitigation in the Malaysian construction industry.” J. Constr. Eng. Manage., 125–133.
Alkass, S., Mazerolle, M., and Harris, F. C. (1996). “Construction delay analysis techniques.” Constr. Manage. Econ., 14(5), 375–394.
Assaf, S. A., and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Proj. Manage., 24(4), 349–357.
Bubshait, A. A., and Cunningham, M. J. (1998). “Comparison of delay analysis methodologies.” J. Constr. Eng. Manage., 315–322.
Conlin, J., and Retik, A. (1997). “Applicability of project management software and advanced IT techniques in construction delays mitigation.” Int. J. Proj. Manage., 15(2), 107–120.
Doloi, H., Sawhney, A., Iyer, K. C., and Rentala, S. (2012). “Analysing factors affecting delays in Indian construction projects.” Int. J. Proj. Manage., 30(4), 479–489.
Gitlow, H. S., Oppenheim, A. V., and Oppenheim, R. (2004). Quality management, McGraw-Hill, New York, London.
Hegazy, T., Said, M., and Kassab, M. (2011). “Incorporating rework into construction schedule analysis.” Autom. Constr., 20(8), 1051–1059.
Hegazy, T., and Zhang, K. (2005). “Daily windows delay analysis.” J. Constr. Eng. Manage., 505–512.
Hossain, L. (2009). “Communication and coordination in construction projects.” Constr. Manage. Econ., 27(1), 25–39.
Meng, X. (2012). “The effect of relationship management on project performance in construction.” Int. J. Proj. Manage., 30(2), 188–198.
Minami, N. A., Soto, L. L., and Rhodes, D. H. (2010). “Dynamic lean management of the naval construction process.” Eng. Manage. J., 22(2), 36–43.
Shi, J. J., Cheung, S. O., and Arditi, A. (2001). “Construction delay computation method.” J. Constr. Eng. Manage., 60–65.
Simon, T. (2007). Communicate in the workplace, Software Publication, Chatswood, NSW, Australia, 20.
Stewart, R. A., and Spencer, C. A. (2006). “Six-sigma as a strategy for process improvement on construction projects: A case study.” Constr. Manage. Econ., 24(4), 339–348.
Yang, J.-B., and Tsai, M.-K. (2011). “Computerizing ICBF method for schedule delay analysis.” J. Constr. Eng. Manage., 583–591.
Yin, R. K. (1984). Case study research: Design and methods, Sage, Newbury Park, CA.

Information & Authors

Information

Published In

Go to Journal of Performance of Constructed Facilities
Journal of Performance of Constructed Facilities
Volume 29Issue 4August 2015

History

Received: Nov 8, 2013
Accepted: Mar 11, 2014
Published online: Mar 13, 2014
Discussion open until: Jan 27, 2015
Published in print: Aug 1, 2015

Permissions

Request permissions for this article.

Authors

Affiliations

Abdulaziz A. Bubshait [email protected]
Professor, Construction Engineering and Management, King Fahd Univ. of Petroleum and Minerals, KFUPM Box 960, Dhahran 31261, Saudi Arabia (corresponding author). E-mail: [email protected]
Mohsin K. Siddiqui, A.M.ASCE [email protected]
Assistant Professor, Construction Engineering and Management, King Fahd Univ. of Petroleum and Minerals, KFUPM Box 1032, Dhahran 31261, Saudi Arabia. E-mail: [email protected]
Abdul Munem A. Al-Buali [email protected]
Graduate Student, Construction Engineering and Management, King Fahd Univ. of Petroleum and Minerals, KFUPM Box 5052, Dhahran 31261, Saudi Arabia. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share