Cable replacement is one of the key technologies used in the successful operation and maintenance of cable-stayed bridges. Removing cables causes structural variations. Selecting a replacement method affects bridge safety during the cable replacement process. A sensitivity analysis was applied to assess the variations of force and deflection in the Sutong Bridge, China. Reasonable methods for both the quantity and position of replacing cables were provided; the bending strain energy changes induced by the cable removal were also analyzed to study the effects of different cable replacement sequences. Comparison of different cable removal schemes showed that both the induced cable force and beam stress change had their most significant influence on the nearest cables to those removed ones. Practically, the largest peak value of cable force increment appeared when removing the shortest cables. The peak value was practically identical with little apparent variation when removing one cable in the central span. The largest beam stress variation arose because of the longest cables (or their nearest neighbors) being removed. The maximum deflection of the tower top had a decreased tendency when the removed cable became short. The bending strain energy also decreased in a similar fashion. Based on the analysis results, replacing one cable from the side span and replacing four cables asymmetrically was recommended, and a replacement sequence running from the shortest cable to longest cable proved to be optimal.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors appreciate the support of The National Natural Science Fund (No. 51278166 and No. 51208176), Transport Science Research Project of Jiangsu Province (2011Y09-1), and The Fundamental Research Funds for the Central Universities (2012B02914).
References
Atmaca, B., and Ates, S. (2012). “Construction stage analysis of three-dimensional cable-stayed bridges.” Steel Compos. Struct., 12(5), 413–426.
Hamilton, H. R., III, Breen, J. E., and Frank, K. H. (1998). “Bridge stay cable corrosion protection. II: Accelerated corrosion tests.” J. Bridge Eng., 72–81.
Ji, B. H., Chen, D. H., Ma, L., Jiang, Z. S., and Shi, G. G. (2012). “Research on stress spectrum of steel decks in suspension bridge considering measured traffic flow.” J. Perform. Constr. Facil., 65–75.
Kite, S., Yeung, N., and Vejrum, T. (2012). “Stonecutters bridge, Hong Kong: Stay cables and geometry control.” Proc. Inst. Civ. Eng. Bridge Eng., 165(1), 59–65.
Li, H. J. (2012). “Technologies on replacement of structural members in prestressed concrete cable-stayed bridges.” 2nd Int. Conf. on Structures and Building Materials, ICSBM 2012, Vol. 446–449, Trans Tech Publications, Germany, 1158–1166.
Mehrabi, A. B., Ligozio, C. A., Ciolko, A. T., and Wyatt, S. T. (2010). “Evaluation, rehabilitation planning, and stay-cable replacement design for the Hale Boggs bridge in Luling, Louisiana.” J. Bridge Eng., 364–372.
Moir, G., Edmonds, C., Walser, P., and Romberg, M. (2010). “Construction engineering of Phu My cable-stayed bridge, Vietnam.” Struct. Eng. Int., 20(3), 331–337.
Pipinato, A., Pellegrino, C., Fregno, G., and Modena, C. (2012). “Influence of fatigue on cable arrangement in cable-stayed bridges.” Int. J. Steel Struct., 12(1), 107–123.
Ren, W. X. (1999). “Ultimate behavior of long-span cable-stayed bridges.” J. Bridge Eng., 30–37.
Sun, Q. S., Yu, H. Y., Guo, X. G., Wang, J. W., and Wu, T. (2010). “Application of Kalman’s filtering method in construction control for cable replacement of the cable-stayed bridge.” Proc., Int. Conf. on Electrical and Control Engineering, ICECE 2010, IEEE, Piscataway, NJ, 471–475.
Yao, W. J., Yang, W., and Liu, X. Y. (2011). “Analysis the cable replacement method of Tianjin Yonghe bridge.” Applied Mechanics and Materials, Frontiers of Green Building, Materials and Civil Engineering, Vol. 71–78, Trans Tech Publications, Clausthal-Zellerfeld, Germany, 1383–1387.
You, Q. Z., He, P., Dong, X. W., Zhang, X. G., and Wu, S. C. (2008). “Sutong bridge—The longest cable-stayed bridge in the world.” Struct. Eng. Int., 18(4), 390–395.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Sep 8, 2012
Accepted: Mar 26, 2013
Published online: Apr 1, 2013
Discussion open until: Jan 18, 2015
Published in print: Jun 1, 2015
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.