Technical Papers
Jan 18, 2013

Probabilistic Assessment of Design Error Costs

Publication: Journal of Performance of Constructed Facilities
Volume 28, Issue 3

Abstract

The statistical characteristics of design error rectification costs experienced in 139 Australian construction projects are analyzed. Theoretical probability distributions are fitted to the design error cost data. A generalized Pareto probability function was found to provide the best overall distribution fit for design error costs. The generalized Pareto distribution is used to calculate the probability of design error costs being experienced for the selected sample. A mean design error cost of 14.2% of a project’s contract value is reported. A significant difference between mean design error costs and project types was found for civil engineering (23.44%) and fit-out (22.50%) projects. Projects >Australian dollars (A$)101M were found to experience significantly higher mean design error costs (26.18%) than other projects. Being able to determine the likelihood of design error rectification costs from the derived empirical probability distribution will provide an ameliorated assessment of risk before the commencement of construction. Strategies to reduce design error rectification costs are also discussed.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors thank the three anonymous reviewers for their constructive comments, which helped improve the quality of this paper. This work was supported by a National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIP: Ministry of Science, ICT and Future Planning) (No. 2008-0061908).

References

Acharya, N., Lee, Y., and Kim, J. (2006). “Design errors: Inefficiency or carelessness of designer?” J. Perform. Constr. Facil., 192–195.
Adamski, A. J., and Westrum, R. (2003). “Requisite imagination: The fine art of anticipating what might go wrong.” Handbook of cognitive task design, E. Hollnagel, ed., Lawrence Erlbaum Associates, Mahwah, NJ, 193–220.
Blake Dawson Waldron. (2011). “Scope for improvement—A survey of pressure points in Australian construction and infrastructure projects.” 〈http://www.ashurst.com/page.aspx?id_content=6971〉 (Nov. 15, 2011).
Blockley, D. I. (1981). The nature of structural design and safety. Ellis Horwood, Chichester, U.K.
Chapman, J. C. (1998). “Collapse of the Ramsgate walkway.” The Structural Engineer, 76(1), 1–10.
Collins, M. P., Vecchio, F. J., Selby, R. G., and Gupta, P. R. (2000). “Failure of an offshore platform.” Can. Consulting Eng., March/April, 43–48.
Construction Industry Institute. (1987). “Costs of quality in design and construction.” Source Document 29, RS-10-2, Univ. of Texas, Austin, TX, 〈https://www.construction-institute.org/scriptcontent/more/10_2_more.cfm?CFID=16457130&CFTOKEN=50211270〉 (Apr. 24, 2012).
Cusack, D. (1992). “Implementation of ISO 9000 in construction.” Proc., ISO 9000 Forum Symposium, Institute of Engineers Australia, Barton, Australia.
Dossick, C., and Neft, G. (2010). “Organizational divisions in BIM-enabled commercial construction.” J. Constr. Eng. Manage., 459–467.
EasyFit 5 [Computer software]. Dnepropetrovsk, Ukraine, MathWave Technologies.
Ellingwood, B. (1987). “Design and construction error effects on structural reliability.” J. Struct. Eng., 409–422.
Flyvbjerg, B., Holm, M., and Buhl, S. (2002). “Underestimating costs in public works projects: Errors or lie?” J. Am. Plann. Assoc., 68(3), 279–295.
Grunwald, A. (2001). “The application of ethics to engineering and the engineer’s moral responsibility: Perspectives for a research agenda.” Sci. Eng. Ethics, 7(3), 415–428.
Guckert, D., and King, J. R. (2002). “Who pays for the architect’s mistakes?” Facil. Manager, 18(5), 47–52.
Hartmann, T., and Fischer, M. (2007). “Applications of BIM and hurdles for widespread adoption of BIM 2007 AISC-ACCL eConstruction Roundtable Event Report.” CIFE No. WP105, Center for Integrated Facility Engineering, Stanford Univ., Stanford, CA.
Hwang, B., Thomas, S., Haas, C., and Caldas, C. (2009). “Measuring the impact of rework on construction cost performance.” J. Constr. Eng. Manage., 187–198.
Lewis, L. G., Jr. (1999). “Construction contingency; Standard of care vs. cost of design errors and omissions.” Engineering Times, National Society of Professional Engineers, Alexandria, VA, 23.
Lopez, R., and Love, P. (2012). “Design error costs in construction projects.” J. Constr. Eng. Manage., 585–593.
Lopez, R., Love, P., Edwards, D., and Davis, P. (2010). “Design error classification, causation, and prevention in construction engineering.” J. Perform. Constr. Facil., 399–408.
Love, P. E. D., Cheung, S. O., Irani, Z., and Davis, P. R. (2011a). “Causal discovery and inference of project disputes.” IEEE Trans. Eng. Manage., 58(3), 400–411.
Love, P. E. D., Edwards, D. J., Han, S., and Goh, Y. M. (2011b). “Design error reduction: Toward the effective utilization of building information modelling.” Res. Eng. Des., 22(3), 173–187.
Love, P. E. D., Edwards, D. J., and Irani, Z. (2008). “Forensic project management: An exploratory examination of the causal behavior of design-induced error.” IEEE Trans. Eng. Manage., 55(2), 234–248.
Love, P. E. D., Edwards, D. J., and Irani, Z. (2012). “Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns.” IEEE Trans. Eng. Manage., 59(3), 560–571.
Love, P. E. D., Lopez, R., Kim, J. T., and Kim, M. J. (2014). “Influence of organizational and project practices on design error costs.” J. Perform. Constr. Facil., 303–310.
Love, P. E. D., and Sing, C.-P. (2013). “Determining the probability distribution of rework costs in construction and engineering projects.” Struct. Infrastruct. Eng., 9(11), 1136–1148.
Love, P. E. D., Wang, X., Sing, C.-P., and Tiong, R. L. K. (2013). “Determining the probability of project cost overruns.” J. Constr. Eng. Manage., 321–330.
Matsumoto, M., and Nishimura, T. (1998). “Mersenne twister: A 623-dimensionally equidistributed uniform pseudo-random number generator.” ACM Trans. Model. Comput. Simul., 8(1), 3–30.
National Research Council. (1994). On the responsibilities of architects and engineers and their clients in federal facilities development. Commission on Engineering and Technical Systems, National Academies Press, Washington, DC.
Newman, M. E. J. (2005). “Power laws, Pareto distribution and Zipf’s law.” Contemp. Phys., 46(5), 323–351.
Nisbet, N., and Dinesen, B. (2010). Constructing the case for building information modelling, Building Smart International Alliance for Interoperability, British Standards Institution, London, U.K.
Penttilä, H. (2006). “Describing the changes in architectural information technology to design complexity and free form expression.” ITcon, 11, 395–408.
Petroski, H. (1991). “Galileo and the marble column: A paradigm of human error in design.” Struct. Saf., 11(1), 1–11.
Petroski, H. (1994). Design paradigms: Case histories of error and judgment in engineering, Cambridge University Press, Cambridge, U.K.
Rowlinson, S. (1999). “A definition of procurement systems.” Procurement systems: A guide to best practice in construction, Rowlinson, S., McDermott, P., eds., Routledge, London, 27–53.
Shiraishi, N., Furuta, H., and Sugimoto, M. (1985). “Effects of gross errors on structural design.” Struct. Saf., 2(3), 245–250.
StatAssist 5.5 [Computer software]. Dnepropetrovsk, Ukraine, MathWave Technologies.
Stewart, M. G. (1993). “Structural reliability and error control in reinforced concrete design and construction.” Struct. Saf., 12(4), 277–292.
Stewart, M. G., and Melchers, R. E. (1988). “Simulation of human error in a design loading task.” Struct. Saf., 5(4), 285–297.
Stewart, M. G., and Melchers, R. E. (1989). “Checking models in structural design.” J. Struct. Eng., 1309–1324.
Sung, T. J., and You, M. (2007). “A method for establishing online design audit platform.” Des. Stud., 28(2), 195–211.
Tabachnik, B. G., and Fidell, L. S. (1996). Using multivariate statistics, 3rd Ed., Harper-Collins, New York.
Westrum, R. (1991). Technologies and society: The shaping of people and things, Wadsworth, Belmont, CA.

Information & Authors

Information

Published In

Go to Journal of Performance of Constructed Facilities
Journal of Performance of Constructed Facilities
Volume 28Issue 3June 2014
Pages: 518 - 527

History

Received: Sep 19, 2012
Accepted: Jan 16, 2013
Published online: Jan 18, 2013
Published in print: Jun 1, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Peter E. D. Love [email protected]
Distinguished Professorial Fellow, Dept. of Civil Engineering, Curtin Univ., GPO Box U1987, Perth, WA, Australia; Visiting Research Professor, Center for Sustainable Healthy Buildings, Kyung Hee Univ., Yongin, 446-701, Republic of Korea. E-mail: [email protected]
Robert Lopez [email protected]
Lecturer, School of Built Environment, Curtin Univ., GPO Box U1987, Perth, WA, Australia. E-mail: [email protected]
Jeong Tai Kim [email protected]
Professor, Dept. of Architectural Engineering, Kyung Hee Univ., Yongin 446-701, Republic of Korea (corresponding author). E-mail: [email protected]
Mi Jeong Kim [email protected]
Associate Professor, Dept. of Housing and Interior Design, Kyung Hee Univ., Seoul 446-701, Republic of Korea. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share