Avoiding Performance Failure Payment Deductions in PFI/PPP Projects: Model of Critical Success Factors

Publication: Journal of Performance of Constructed Facilities
Volume 27, Issue 3

Abstract

The overall aim of this paper is to identify critical success factors that would help Private Finance Initiative/facility management (PFI/FM) contractors to avoid performance failure payment deductions in Public Private Partnership/PFI (PPP/PFI) projects (constructed facilities). Using focus groups discussions, 36 possible factors that could influence performance failure payment deductions were identified and put together in a questionnaire survey. Analysis included reliability analysis that enabled identification of 29 reliable factors from the initial 36 factors. Using linear multiple regression, the best seven predictors that could help PFI/FM contractors to avoid performance payment failure deduction were identified from the 29 reliable factors. With the aid of another set of data and Spearman's rank correlation analysis, the seven predictors referred to as critical success factors were validated to confirm their dependability and wider applicability. The seven critical success factors include: (1) good working relationship with client, end-users, subcontractors, and suppliers; (2) minimal use of subjective measures as key performance indicators (KPIs); (3) a functioning help desk in place to receive service requests and complaints;, (4) explicit and realistic performance standards, criteria, and weighting systems; (5) quality of service delivery that meets requirements of output specification; (6) use of the Just-in-Time approach compared with a prescheduled maintenance regime; and (7) PFI/FM contractor active participation in the design process. The research findings would help both PFI/FM contractors and private project consortiums to maximize their profits/returns on investment by improving their performance and avoiding payment deductions in PFI projects. Public sector clients and occupants/users of their facilities would also achieve full value for money by enjoying facilities that adequately meet their needs and requirements.

Get full access to this article

View all available purchase options and get full access to this article.

References

Abdel Aziz, A. M. (2007). “A survey of the payment mechanisms for transportation DBFO projects in British Columbia.” Construct. Manag. Econ., 25(5), 529–543.
Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E., and Asenova, D. (2003). “Achieving best value in private finance initiative project procurement.” Construct. Manag. Econ., 21(5), 461–470.
Akintoye, A., Taylor, C., and Fitzgerald, E. (1998). “Risk analysis and management of Private Finance Initiative projects.” Eng. Construct. Architect. Manag., 5(1), 9–21.
Al-Momani, A. H. (2000). “Examining service quality within construction processes.” Technovation, 20(11), 643–651.
Alvesson, M., and Deetz, S. (2000). Doing critical management research, Sage Publications Ltd, London.
Atkin, B., and Brooks, A. (2009). Total facility management, 3rd Ed., Wiley-Blackwell, Oxford, U.K.
British Standards Institution (BSI). (1993). “British standard BS 3811: 1964 – Glossary of maintenance management terms in terotechnology.” British Standard Publishing Ltd, London.
Building School for the Future (BSF). (2008). “BSF PFI Documents – Payment Mechanism (Schedule 6 to the PFI Project Agreement) - February 2008.” 〈http://www.partnershipsforschools.org.uk/library/BSF-archive/BSF-standard-documents.html#PFIProjectAgreementDocuments〉 (Jun. 21, 2011).
Carrillo, P. M., Robinson, H. S., Anumba, C. J., and Bouchlaghem, N. M. (2006). “A knowledge transfer framework: The PFI context.” Construct. Manag. Econ., 24(10), 1045–1056.
Carrillo, P., Robinson, H., Foale, P., Anumba, C., and Bouchlaghem, D. (2008). “Participation, barriers and opportunities in PFI: The United Kingdom experience.” J. Manage. Eng., 24(3), 138–145.
Chanter, B., and Swallow, P. (2007). Building maintenance management, 2nd Ed., Blackwell Publishing, Oxford, U.K.
Cooke-Davies, T. (2002). “The ‘real’ success factors on projects.” Int. J. Proj. Manag., 20(3), 185–190.
Corder, G. W., and Foreman, D. I. (2009). Nonparametric statistics for non-statisticians: A step-by-step approach, Wiley, Hoboken, NJ.
Cox, R. F., Issa, R. R. A., and Ahrens, D. (2003). “Management perception of key performance indicators for construction.” J. Constr. Eng. Manage., 129(2), 142–151.
Dancey, C. P., and Reidy, J. (2007). Statistics without maths for psychology, Prentice Hall, U.K.
Eley, J. (2001). “How do post-occupancy evaluation and the facilities manager meet?” Build. Res. Inform., 29(2), 164–167.
El-Haram, M. A., and Agapiou, A. (2002). “The role of facility manager in new procurement routes.” J. Qual. Mainten. Eng., 8(2), 124–134.
Field, A. (2005). Discovering statistics using SPSS, 2nd Ed., Sage Publications, London.
Fitzgerald, E., and Melvin, D. (2002). “The UK private finance initiative and Glasgow schools.” Facilities, 20(3/4), 119–126.
4ps. (2004). “Housing PFI procurement pack – model documentation, model 11 – payment mechanism.” 〈http://www.localpartnerships.org.uk/4ps〉 (Jun. 21, 2011).
4ps. (2006). “4ps PFI/PPP operational project review 2006 school sector.” 〈http://www.localpartnerships.org.uk/UserFiles/File/Oper_Proj_Sup/SchoolsPFIOperationalReviewSept2006.pdf〉 (Apr. 09, 2011).
4ps. (2007). “A guide to contract management for PFI and PPP projects.” 〈http://www.localpartnerships.org.uk/UserFiles/File/Publications/4ps%20ContractManagers%20guideFINAL.pdf〉 (Jun. 21, 2011).
Gruneberg, S., Hughes, W., and Ancell, D. (2007). “Risk under performance-based contracting in the UK construction sector.” Construct. Manag. Econ., 25(7), 691–699.
Hair, J. F., Anderson, R., Tatham, R. L., and Black, W. C. (2006). Multivariate data analysis, Prentice Hall, Upper Saddle River, NJ.
Heavisides, B., and Price, I. (2001). “Input versus output-based performance measurement in the NHS – The current situation.” Facilities, 19(10), 344–356.
Highway Agency (HA). (2006). “DBFO - design, build, finance, operate – payment mechanisms.” 〈http://www.highways.gov.uk/roads/2998.aspx〉 (Jun. 28, 2011).
HM Treasury. (2006a). Value for money assessment guidance, 2nd Ed., HM Stationery Office, London.
HM Treasury. (2006b). Strengthening long-term partnerships, HM Stationery Office, London.
HM Treasury. (2007a). “Standardization of PFI contracts, version 4.” 〈http://www.hm-treasury.gov.uk/ppp_standardised_contracts.htm〉 (May 30, 2011).
HM Treasury. (2007b). Operational taskforce note 2: Project transition guidance, HM Stationery Office, London.
Johnson, P., and Duberley, J. (2000). Understanding management research: An introduction to epistemology, Sage Publications Ltd, London.
Jones, O. (2000). “Facility management: Future opportunities, scope and impact.” Facilities, 18(3/4), 133–137.
Kelly, J., Hunter, K., Shen, G., and Yu, A. (2005). “Briefing from a facilities management perspective.” Facilities, 23(7/8), 356–367.
Kincaid, D. G. (1994). “Measuring performance in facility management.” Facilities, 12(6), 17–20.
Lam, E. W. M., Chan, A. P. C., and Chan, D. W. M. (2010). “Benchmarking success of building maintenance projects.” Facilities, 28(5/6), 290–305.
Li, B., Akintoye, A., Edwards, P. J., and Hardcastle, C. (2005). “Critical success factors for PPP/PFI projects in the UK construction industry.” Construct. Manag. Econ., 23(5), 459–471.
Meacham, B., Bowen, R., Traw, J., and Moore, A. (2005). “Performance-based building regulation: Current situation and future needs.” Build. Res. Inform., 33(2), 91–106.
Ministry of Defence–Private Finance Unit (MOD–PFU). (2010). “MOD private finance unit guidance note, out-based specifications for PFI/PPP projects. Version 0.2. Consultation draft. September 2010.” 〈http://www.mod.uk/NR/rdonlyres/DAA6AFD2-49C2-4A7B-B2FB-2AD976FF542C/0/OutputBasedSpecificationsforPFIPPPProjects.pdf〉 (Apr. 9, 2011).
Muhleman, A., Oakland, J., and Lockyer, K. (1992). Production and operations management, 6th Ed., Pitman Publishing, London.
Muller, R., and Turner, R. (2007). “The influence of project managers on project success criteria and project success by type of project.” Eur. Manage. J., 25(4), 298–309.
National Audit Office (NAO). (1999). “PFI and PPP/privatisation recommendations, HC 277.” 〈http://www.nao.org.uk/Recommendation/report.asp?repId=197〉 (Apr. 09, 2011).
National Audit Office (NAO). (2001). “Managing relationship to secure successful partnership in PFI projects” Rep. of Comptroller and Auditor General, HC 375, Session 2001–2002, TSO–Stationery Office, London.
National Audit Office (NAO). (2003a). “Northern Ireland courts Service, PFI: The Laganside Courts.” Rep. of Comptroller and Auditor General, HC 649, Session 2002–2003, TSO–The Stationery Office, London.
National Audit Office (NAO). (2003b). “The operational performance of PFI prisons,” Rep. of Comptroller and Auditor General, HC 700, Session 2002–2003, TSO–The Stationery Office, London.
National Audit Office (NAO). (2003c). “PFI: The new headquarters for the Home Office.” Rep. of Comptroller and Auditor General, HC 954, Session 2002–2003, TSO–The Stationery Office, London.
National Audit Office (NAO). (2005). “The Darent Valley Hospital: The PFI contract in action.” Rep. of Comptroller and Auditor General, HC 209, Session 2004–2005, TSO–The Stationery Office, London.
National Audit Office (NAO). (2009). “Performance of PFI construction – A review by the private finance practice.” 〈http://www.nao.org.uk/publications/0809/pfi_construction.aspx〉 (May 30, 2011).
National Audit Office (NAO). (2010). “The performance and management of hospital PFI contract.” Rep. of Comptroller and Auditor General, HC 68, Session 2010–2011, TSO–The Stationery Office, London.
Norusis, M. J. (2008). The SPSS 16.0 guide to data analysis, 2nd Ed., Prentice Hall, U.K.
Nutt, B. (1993). “The strategic brief.” Facilities, 11(9), 28–32.
Pallant, J. (2005). SPSS survival manual, 2nd Ed., Open University Press, Berkshire.
Parasuraman, A., Zeithaml, V. A., and Berry, L. L. (1988). “SERVQUAL: A multiple-item scale for measuring customer perceptions of service quality.” J. Retailing, 64(1), 12–40.
Partnerships UK. (2005). “Schools PFI– Post signature Review.” Phase 2 Rep., Report for the Dept. Education and Skills.
Partnerships UK. (2006). “Report on operational PFI projects.” 〈http://www.partnershipsuk.org.uk/uploads/documents/doc_70_22-3-2006-13-58-41.pdf〉 (Jun. 28, 2011).
Preiser, W. F. E. (1995). “Post-occupancy evaluation: how to make buildings work better.” Facilities, 13(11), 19–28.
Riggs, J. L. (1987). Production systems: Planning, analysis and control, 4th Ed., Wiley, New York.
Robinson, H. S., and Scott, J. (2009). “Service delivery and performance monitoring in PFI/PPP projects.” Construct. Manag. Econ., 27(2), 181–197.
Shahin, A., and Mahbod, M. A. (2007). “Prioritization of key performance indicators: An integration of analytical hierarchy process and goal setting.” Int. J. Prod. Perform. Manag., 56(3), 226–240.
Smyth, H., and Edkins, A. (2007). “Relationship management in the management of PFI/PPP projects in the U.K.” Int. J. Proj. Manag., 25(3), 232–240.
Smyth, H., and Wood, B. (1995). Just-in-time maintenance. COBRA, RICS Research, London.
Sommer, R., and Sommer, B. (2002). A practical guide to behavioral research: Tools and techniques, 5th Ed., Oxford University Press, Oxford, U.K.
Straub, A. (2010). “Competencies of maintenance service suppliers servicing end-customers.” Construct. Manag. Econ., 28(11), 1187–1195.
Straub, A., Koopman, M., and Van Mossel, J. H. (2010). “System approach and performance measurement by social enterprises.” Facilities, 28(5/6), 321–331.
Takim, R., and Akintoye, A. (2002). “Performance indicators for successful construction project performance.” 18th Annual ARCOM (Association of Researchers in Construction Management) Conf., D. Greenwood, ed., Vol. 2, Univ. of Northumbria, Newcastle upon Tyne, U.K., 545–555.
Treasury Taskforce Private Finance. (1998). “Technical note no. 6 – How to manage the delivery of long term PFI contracts.” 〈http://www.hm-treasury.gov.uk/d/PPP_TTF_Technote6.pdf〉.
Yescombe, E. R. (2002). Principles of project finance, Academic Press, Elsevier, London.
Yescombe, E. R. (2007). Public private partnerships: Principles of policy and finance, Butterworth-Heinemann, Oxford, U.K.
Wang, J. (2008). “Comparative performance of UK PFI and non‐PFI hospitals.” Proc., CIB W055 - W065 Joint Int. Symp.: Transformation Through Construction.
Wiggins, J. M. (2010). Facility manger’s desk reference, Wiley-Blackwell, Oxford, U.K.
Winch, G. (2000). “Institutional reform in British construction industry: Partnering and private finance.” Build. Res. Inform., 28(2), 141–145.

Information & Authors

Information

Published In

Go to Journal of Performance of Constructed Facilities
Journal of Performance of Constructed Facilities
Volume 27Issue 3June 2013
Pages: 283 - 294

History

Received: Dec 29, 2011
Accepted: May 16, 2012
Published online: May 18, 2012
Published in print: Jun 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Lukumon O. Oyedele [email protected]
School of Planning, Architecture and Civil Engineering, Queen’s Univ. Belfast, Belfast BT9 5AG, U.K. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share