Field Evaluation of Staged Concrete Bridge Deck Pours Adjacent to Live Traffic
Publication: Journal of Bridge Engineering
Volume 24, Issue 4
Abstract
Staged construction is the practice in which traffic is maintained on a bridge while it is constructed in phases. When cast-in-place concrete decks are used with staged construction, the concrete deck must cure while subjected to loads and displacements caused by the adjacent traffic using the same structure. Traffic-induced displacements and vibrations may damage the freshly placed concrete, its bond with the embedded reinforcement, or the integrity of the concrete joint. To determine the effects, if any, of staged construction practices on long-term bridge performance, this research examined bridge decks in Wisconsin that were constructed or widened using staged construction through visual inspection, field monitoring, and finite-element modeling. Some minor defects were observed in the field inspections of slab-on-girder bridges, such as underconsolidated concrete in the construction joint region and leakage through the joint itself. The inspected haunched-slab bridges showed severe deterioration at the construction joints. Field-measured differential displacements were small, with a maximum of 1.1 mm (0.043 in.), both during construction and several weeks after. Finite-element modeling confirmed these observations. Modeling results indicated that as long as nominal stiffness was provided by the deck or even the formwork between girders adjacent to the longitudinal joint, these deflections were unlikely to cause deterioration. Longer-span bridges may experience larger differential displacements across the joint, but these may be controlled by preventing larger vehicles from using the lane adjacent to the fresh concrete for approximately one day.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The writers would like to acknowledge the support of the Wisconsin Department of Transportation under project number 0092-16-04. The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views of the sponsors at the time of publication.
References
AASHTO. 2012. AASHTO LRFD Bridge Design Specifications. 6th ed. Washington, DC: AASHTO.
ACI Committee 209. 1992. ACI 209R-92 prediction of creep, shrinkage, and temperature effects in concrete structures. Detroit: ACI.
ACI Committee 345. 2013. ACI 345.2R-13 guide for widening highway bridges. Farmington Hills, MI: ACI.
Andrews, T. K. 2013. “Effect of differential movement of straight reinforcing bars during early age curing on the bond strength.” M.S. thesis, Dept. of Civil Engineering, Clemson Univ.
Arnold, C. J. 1966. Deck rippling on various Michigan bridges—Third progress rep. Rep. No. R-608. Lansing, MI: Michigan Dept. of State Highways.
Deaver, R. W. 1982. Bridge widening study. Forest Park, GA: Georgia Dept. of Transportation.
Furr, H. L., and F. H. Fouad. 1981. Bridge slab concrete placed adjacent to moving live loads. Rep. No. FHWA/TX-81/11 + 266-1F. College Station, TX: Texas A&M Univ. System, Transportation Institute.
Issa, M. A. 1999. “Investigation of cracking in concrete bridge decks at early ages.” J. Bridge Eng. 4 (2): 116–124. https://doi.org/10.1061/(ASCE)1084-0702(1999)4:2(116).
Manning, D. G. 1981. Effects of traffic-induced vibrations on bridge-deck repairs. Washington, DC: National Cooperative Highway Research Program.
Ng, P., and A. Kwan. 2007. “Effects of traffic vibration on curing concrete stitch: Part I—Test method and control program.” Eng. Struct. 29 (11): 2871–2880. https://doi.org/10.1016/j.engstruct.2007.01.029.
Oehler, L. T., and G. R. Cudney. 1966. Deck rippling on the I-75 Rouge River Bridge—Second progress rep. Rep. No. R-607. Lansing, MI: Michigan Dept. of State Highways.
Swenty, M. K., and B. A. Graybeal. 2012. Influence of differential deflection on staged construction deck-level connections. Rep. No. FHWA-HRT-12-057. McLean, VA: Federal Highway Administration, Office of Infrastructure Research & Development.
WisDOT. 2007. “SP4075: Maximum weight limitations summary.” Retrieved from Wisconsin Dept. of Transportation. Accessed March 1, 2018. https://wisconsindot.gov/Documents/formdocs/sp4075.pdf.
Information & Authors
Information
Published In
Copyright
© 2019 American Society of Civil Engineers.
History
Received: Mar 1, 2018
Accepted: Sep 26, 2018
Published online: Jan 15, 2019
Published in print: Apr 1, 2019
Discussion open until: Jun 15, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.