Residential Vertical Expansions Using Modular Construction
Publication: Journal of Architectural Engineering
Volume 24, Issue 3
Abstract
Modular methods are sometimes used to enhance productivity in residential construction projects. Modular methods, however, are not appropriate for all projects, and the feasibility of success must be studied on a case-by-case basis. In this article, factors that can affect the feasibility of a modular vertical expansion are explored, and the benefits of using a coarse finite-element modeling approach to help identify those factors are discussed. A case study is used to demonstrate this approach and provide project-specific factors, some of which can be generalized to other modular applications. The results of the case study show the important planning information that can be obtained by studying generalized structure behavior in the front-end portion of the design. Findings suggest that matching the construction method to the proper application and diligent front-end planning have a positive effect on the feasibility of multistory modular projects, especially those that have complex issues to contend with, such as vertical expansion.
Get full access to this article
View all available purchase options and get full access to this article.
References
CII (Construction Industry Institute). 2002. Prefabrication, preassembly, modularization and offsite fabrication in industrial construction: A framework for decision-making. RS 171-1. Austin, TX: CII.
CII (Construction Industry Institute). 2012. CII best practices guide: Improving project performance. IR 166-3. Austin, TX: CII.
Construction Users Roundtable. 2007. “Pre-assembly perks: Discover why modularization works.” The Voice (Fall): 28–31.
Garrison, J., and A. Tweedie. 2008. Modular architecture manual. Brooklyn, NY: Kullman Building Corp. and Garrison Architects.
George, R., L. Bell, and E. Back. 2008. “Critical activities in the front-end planning process.” J. Manage. Eng. 24 (2): 66–74. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:2(66).
Georgia-Pacific. 2003. Intertek test report: 5/8″ dense-glass gold. ASTM E72 Racking Load Test 3049616. Atlanta: Georgia-Pacific.
Huang, A. L., R. E. Chapman and D. T. Butry. 2009. Metrics and tools for measuring construction productivity: Technical and empirical considerations. Special Publication 101. Gaithersburg, MD: National Institute of Standards and Technology.
ICC (International Code Council). 2011a. International building code (IBC). Country Club Hills, IL: ICC.
ICC (International Code Council). 2011b. International existing building code (IEBC). Country Club Hills, IL: ICC.
IEE (Intelligent Energy–Europe). 2009. The main SuRE-FIT results. Rep. EIE/06/068/S12.448123. Brussels, Belgium: European Commission.
Jellen, A. C. 2015. “Vertical expansion of existing buildings using multi-modular construction methods.” Master’s thesis, Pennsylvania State Univ.
Lawson, R. M., R. G. Ogden, R. Pedreschi, P. J. Grubb, and S. O. Popo-Ola. 2005. “Developments in pre-fabricated system in light steel and modular construction.” Struct. Eng. (Mar.): 28–35.
Lawson, R. M., N. R. Badoo, and G. Vannier. 2010. Renovation of buildings using steel technology (ROBUST). EUR 25335. Brussels, Belgium: European Commission Research Fund for Coal and Steel.
MHC (McGraw-Hill Construction). 2010. Green BIM: How building information modeling is contributing to green design and construction. SmartMarket Rep. Bedford, MA: MHC.
MHC (McGraw-Hill Construction). 2011. Prefabrication and modularization: Increasing productivity in the construction industry. SmartMarket Rep. Bedford, MA: MHC.
NAHBRC (National Association of Home Builders Research Center). 1999. Innovative residential floor construction: Horizontal diaphragm values for cold-formed steel framing. Upper Marlboro, MD: US Dept. of Housing and Urban Development.
NRC (National Research Council). 2009. Advancing the competitiveness and efficiency of the US construction industry. Washington, DC: National Academies Press.
Smith, R. E., and Modular Building Institute. 2015. Permanent modular construction—Process, practice, performance. Off-Site Studies Rep. Charlottesville, VA: Modular Building Institute.
Vieira, L. C. M., Jr., and B. W. Shafer. 2012. “Lateral stiffness and strength of sheathing-braced cold formed steel walls.” Eng. Struct. 37: 205–213. https://doi.org/10.1016/j.engstruct.2011.12.029.
Information & Authors
Information
Published In
Copyright
© 2018 American Society of Civil Engineers.
History
Received: Mar 1, 2017
Accepted: Mar 20, 2018
Published online: Jun 28, 2018
Published in print: Sep 1, 2018
Discussion open until: Nov 28, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.