Drilling Fluid Considerations in Design of Engineered Horizontal Directional Drilling Installations
Publication: International Journal of Geomechanics
Volume 5, Issue 4
Abstract
A literature review is presented that identifies a number of areas where procedures for the engineering design of bored installations in soil using horizontal directional drilling (HDD) can be improved through a more realistic consideration of drilling fluid drag effects and skin friction coefficients. The current HDD practice of calculating annular frictional pressure loss caused by drilling fluid drag based on the assumption of concentric annular flow of a Bingham plastic fluid is demonstrated to be overly conservative. Consequently, critical design parameters, such as depth of cover, which affects crossing length, and drilling equipment size, which is selected based on anticipated pulling load, cannot be optimized. This can result in overly conservative design and unnecessary construction costs. Parameter values currently employed in HDD pulling load prediction are challenged suggesting that the viscous shear of drilling fluid is significantly less than typically quoted and that the friction coefficients often employed are not representative of all skin friction effects in HDD. A new real-time monitoring cell for large-scale HDD is described that can be used to optimize installations and to assess and update current prediction models.
Get full access to this article
View all available purchase options and get full access to this article.
References
American Society for Testing and Materials (ASTM). (1999). “Standard guide for use of maxi-horizontal directional drilling for placement of polyethylene pipe or conduit under obstacles, including rivers.” F-1962-99, West Conshohocken, Pa.
Ariaratnam, S. T., Stauber, R. M., Bell, J., and Canon, F. (2003). “Evaluation of rheologic properties of fluids returns from horizontal directional drilling.” Proc., NASTT/ISTT Int. No-Dig. 2003 Conf., Las Vegas, Track1 Session D, North American Society for Trenchless Technology (NASTT), Arlington, Va.
Baik, H., Dulcy, M. A., and Gokhale, S. (2003). “A decision support system for horizontal directional drilling.” Tunn. Undergr. Space Technol., 18(1), 99–109.
Baroid. (1997). Drilling fluid manual, Chap. 9, Haliburton, Houston.
Baumert, M. E., and Allouche, E. N. (2002). “Methods for estimating pipe pullback loads for horizontal directional drilling (HDD) crossings.” J. Infrastruct. Syst., 8(1), 12–20.
Baumert, M. E., Allouche, E. N., and Moore, I. D. (2003). “Experimental investigation of pull loads and borehole pressures during horizontal directional drilling installations.” Can. Geotech. J., in press.
Becker, T. E., Azar, J. J., and Okrajni, S. S. (1989). “Correlations of drilling fluid rheological properties with cuttings transport performance in directional drilling.” Proc. 64th Annual Technical Conf. and Exhibition, Society of Petroleum Engineers, San Antonio, SPE Paper No. 19535.
Chin, W. C. (2001). Computational rheology for pipeline and annular flow, Gulf Professional, Boston.
Conner, R. C. (1998). “Horizontal directional drilling with ductile iron pipes.” Pipelines in the Constructed Environment, 1998 Pipeline Division Conf., J. P. Castronovo and J. A. Clark, eds., ASCE, Reston, Va., 494–505.
Conroy, P. J. (2002). “Installation of fiber-optic cables under flood protection structures using horizontal directional drilling techniques” ERDC/GSL TR-02-08, U.S. Army Corps of Engineers, Engineer Research and Development Center, Geotechnical Engineering Research Program.
Delft Geotechnics. (1997). A Rep. by Department of Foundations and Underground Engineering, Prepared for O’Donnell Associates, Inc., Sugarland, Tex.
Drillpath theory and user’s manual. (1996) Infrasoft L.L.C., Houston.
Driscopipe. (1993). “Technical expertise application of driscopipe in directional-drilling and river-crossings.” Tech Note No. 41.
Featherstone, R. E., and Nalluri, C. (1988). Civil engineering hydraulics: Essential theory with worked examples, BSP Professional Books, London, 50–50.
Gratton, D., and Venton, P. (2002). “Pipelines—Gas and liquid petroleum—Design and construction.” Australian Standard AS 2885.1, Australia.
Haciislamoglu, M., and Langlinais, J. (1990). “Non-Newtonian flow in eccentric annuli.” J. Energy Resour. Technol., 112, 163–169.
Hair, J. D. (1991). “Analysis of subsurface pressure involved with directionally controlled horizontal drilling.” Proc., ASCE Pipelines Conf., ASCE, New York, 1–12.
Hemphill, T., Campos, W., and Pilehvari, A. (1993). “Yield-power law model more accurately predicts drilling fluid rheology.” Oil & Gas J., 91(34), 45–50.
Huey, D. P., Hair, J. D., and McLeod, K. B. (1996). “Installation loading and stress analysis involved with pipelines installed in horizontal directional drilling.” No-Dig 1996, New Orleans.
Keulen, B. (2001). “Maximum allowable pressures during horizontal directional drillings focused on sand.” Delft Univ. of Technology, Delft, The Netherlands.
Lugar, H. J., and Hergarden, H. J. A. M. (1998). “Directional drilling in soft soil; influence of drilling fluid pressures.” Proc., ISTT-No Dig.
Maidla, E. E., and Wojtanowicz, A. K. (1987). “Field comparison of 2-D and 3-D methods for the borehole friction evaluation in directional wells.” Proc., 62nd Annual Technical Conf. and Exhibition of the Society of Petroleum Engineers, Dallas, SPE 16663.
Maidla, E. E., and Wojtanowicz, A. K. (1990). “Laboratory study of borehole friction factor with a dynamic-filtration apparatus.” SPE Drill. Eng., 5(3), 247–255.
NEN (1992). “Requirements for steel pipeline transportation systems.” NEN 3650 (unofficial translation), Government/Industry Standards Committee 343 20, The Netherlands.
Potyondy, J. G. (1961). “Skin friction between various soils and construction materials.” Geotechnique, London.
Staheli, K., Bennett, D., O’Donnell, H. W., and Hurley, T. J. (1998). “Installation of pipelines beneath levees using horizontal directional drilling.” Construction Productivity Advancement Research (CPAR) Program CPAR-GL-98-1, U.S. Army Corps of Engineers Waterways Experiment Station, Vicksburg, Miss.
Stauber, R. M., Bell, J., and Bennett, D. (2003). “A rational method for evaluating the risk of hydraulic fracturing in soil during horizontal directional drilling (HDD).” Proc., NASTT/ISTT International No-Dig 2003, Las Vegas, Track1 Session D., North American Society for Trenchless Technology, Arlington, Va.
Stein, D. (2003). Trenchless technology for installations of cables and pipelines (Grabenloser Leitungsbae), English translation, (Draft), Ernst and Sohn, Berlin.
Information & Authors
Information
Published In
Copyright
© 2005 ASCE.
History
Received: Dec 12, 2003
Accepted: Oct 22, 2004
Published online: Dec 1, 2005
Published in print: Dec 2005
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.