Integrated Multiple-Element Bridge Management System
Publication: Journal of Bridge Engineering
Volume 14, Issue 3
Abstract
This paper presents the development of a comprehensive bridge management system that optimizes repair decisions considering multiple bridge elements and large networks of bridges. The strength of the system stems from its integration of project-level decisions of the best repair strategies to use on the elements of each bridge, and network-level decisions of the most beneficial repair year for each bridge. These decisions, however, represent complex optimization problems that traditional optimization techniques are often unable to solve. To handle such a large problem, the proposed system uniquely segments the problem into smaller sequential optimizations that are solved using the genetic algorithms technique. The system uses a year-by-year optimization formulation to maximize the benefit/cost ratio of the repairs, and to maximize the overall network condition. The paper provides a description of the multiple-element system, its life-cycle formulation, and its related models for deterioration analysis and repair cost estimation. System implementation and an example application are then presented to demonstrate the practicality of the system and its performance on different sizes of bridge networks.
Get full access to this article
View all available purchase options and get full access to this article.
References
Elbehairy, H. (2007). “Bridge management system with integrated life cycle cost optimization.” Ph.D. thesis, Univ. of Waterloo, Waterloo ON, Canada.
Elbehairy, H., Hegazy, T., Elbeltagi, E., and Souki, K. (2006). “Comparison of two evolutionary algorithms for LCC optimization of bridge deck repairs.” Comput. Aided Civ. Infrastruct. Eng., 21(8), 561–572.
Federal Highway Administration (FHwA). (2001). Pontis, Version 4.0 Technical Manual Report, U.S. Dept. of Transportation, Washington, D.C.
Furuta, H., Kameda, T., Nakahara, K., Takahashi, Y., and Frangopol, D. (2006). “Optimal bridge maintenance planning using improved multi-objective genetic algorithm.” Struct. Infrastruct. Eng., 2(1), 33–41.
Goldberg, D. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, New York.
Hastak, M., and Hong, S. (2007). “Evaluation and determination of optimal MR&R strategies in concrete bridge decks.” Autom. Constr., 16(2), 165–175.
Hegazy, T., Elbeltagi, E., and Elbehairy, H. (2004). “Bridge deck management system with integrated life cycle cost optimization.” Transportation Research Record. 1866, National Research Council, Washington, D.C., 44–50.
Holland, J. (1975). Adaptation in natural and artificial systems, The University of Michigan Press, Ann Arbor, Mich.
Jacobs, T. (1992). “Optimal long-term scheduling of bridge deck replacement and rehabilitation.” J. Transp. Eng., 118(2), 312–322.
Jiang, Y. (1990). “The development of performance prediction and optimization models for bridge management systems.” Ph.D. thesis, Purdue Univ., West Lafayette, Ind.
Lee, C., and Kim, S. (2007). “GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks.” Autom. Constr., 16(2), 153–164.
Liu, C., Hammad, A., and Itoh, Y. (1997). “Maintenance strategy optimization of bridge decks using genetic algorithms.” J. Transp. Eng., 123(2), 91–100.
Liu, M., and Frangopol, D. M. (2006). “Optimizing bridge network maintenance management under uncertainty with conflicting criteria: Life-cycle maintenance, failure, and user costs.” J. Struct. Eng., 132(11), 1835–1845.
Minchin, R., Zayed, T., Boyd, A., and Mendoza, M. (2006). “Best practices of bridge system management—A synthesis.” J. Manage. Eng., 22(4), 186–195.
O’Connor, D. S., and Hayman, W. A. (1989). “Bridge management systems.” Rep. No. FHWA-DP-71-01R, U.S. Dept. of Transportation, Federal Highway Administration, Transportation Research Board, Washington, D.C.
National Cooperative Highway Research Program (NCHRP). (2004). “Multiple-objective optimization for bridge management systems.” Research Project Statement No. 12-67, Fiscal Year 2004, ⟨http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+12-67⟩.
“$66 billion for roads.” (2005). Toronto Star, February 16, A16.
Yanev, B., and Testa, R. B. (1999). “Life-cycle performance of bridge components in New York City.” 8th Transportation Research Board Conf. on Bridge Management, Transportation Research Board, Washington, D.C., C-/1–C-5/10.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Jun 19, 2007
Accepted: Jul 29, 2008
Published online: May 1, 2009
Published in print: May 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.